SALEM WILLOWS YACHT CLUB1, SALEM WILLOWS YACHT CLUB I
REQUEST FOR REVIEW COMMENTS
SPECIAL PERMIT
DATE:
T0: ( ) Building Inspector ( ) Conservation Commission
( ) City Engineer ( ) Other:
( 1-1"oard of Health
Attached please find the application referenced below. The Planning Board
requests that you review this application relative to Section VII of the
Zoning Ordinance. We would appreciate your completing the form bel-c:a and
returning; it to us. Notice of -the public hearing for this application.wil,l
be forwa:.led to you.
( ) jTETLA\DS &FLOOD HAZARD DISTRICTS
( ) CLUSTER DEVELOPXENT
( )p Pi.ANNED UNITDEVELOPMENT
APPLICANT:
PROJECT NAME & ADRESS:
CONTACT PERSONS AND PHONE:
Applicant: City:
COMMENTS DUE BY: �F
�shal (Failure to comment within _emed.ack of
(t.4"Concur with proposal (Explain on reverse side)
( ) Need more information (Explain on reverse side)
( ) Cannot concur with proposal (Explain on reverse side)
( ) Comments included
REVIEWER'S SIGNATURE TITLE
r
opposition.)
DATE
Motion was made and passed granting approval
Viewed Plans and Concur with Proposal.
Rbbi
R bert E. lenkhorn
Health Agent
REQUEST FOR REVIEW COMMENTS
SPECIAL PERMIT
DATE:
T0: ( ) Building Inspector ( ) Conservation Commission
( ) City Engineer ( ) Other:
( j,"oard of Health
Attached please find the application referenced below. The Planning Board
requests that you review this application relative to Section VII of the
Zoning Ordinance. We would appreciate your completing the form below and
returning it to us. Notice of the public hearing for this application will
be forwarded to you.
( ) WETI.ANDS & FLOOD HAZARD DISTRICTS
( ) CLUSTER DEVELOPMENT
( )
PLANNED UNIT
DEVELOPMENT
APPLICANT: aa Aid P&P` L L V
PROJECT NAME & ADRESS:
CONTACT PERSONS AND PHONE:
Applicant: City:
COMMENTS DUE BYZZ
(Failure to comment within35 s shall[/be
(.L#KConcur with proposal (Explain on reverse side)
( ) Need more information (Explain on reverse side)
( ) Cannot concur with proposal (Explain on reverse side)
( ) Comments included
S SIGNATURE TITLE
opposition.)
Viewed Plans and Concur with Proposal.
Robert E. Blenkhorn
Health Agent
REQUEST FOR REVIEW COMMENTS
DATE:
TO: ( ) Building Inspector
( ) City Engineer
( Ll"oard of Health
SPECIAL PERMIT
( ) Conservation Commission
( )
Other:
Attached please find the application referenced below. The Planning Board
requests that you review this application relative to Section VII of the
Zoning Ordinance. We would appreciate your completing the form below and
returning it to us. Notice of the public hearing for this application will
be forwarded to you.
( ) WETLANDS& FLOOD HAZARD DISTRICTS
(. ) CLUSTER DEVELOPMENT
(. )p PLANNED /UNIT DEVELOPMENT
APPLICANT: tiJ�6 L,4- WAIV/D5 eA9
PROJECT NAME & ADRESS:
CONTACT PERSONS AND PHONE:
Applicant: City:
COMMENTS DUE BY: j%tA/l"f, /7
(Failure to comment within
(.{XConcur with proposal (Explain on reverse side)
( ) Need more information (Explain on reverse side)
( ) Cannot concur with proposal (Explain on reverse side)
(. ) Comments included
REVIEWER'S SIGNATURE TITLE
opposition.)
Viewed Plans- Concur with proposal
Robert E. Blenkhorn
Health Agent
Y CITY OF SALEM, MASSACHUSETTS
APPLICATION
SPECIAL PERMIT
WETLANDS AND FLOOD HAZARD DISTRICTS
Applicant: Salem Willows Yacht Club, Inc.
Address: Salem Willows Park, Salem, MA 01970
Telephone:
NONE
Owner: Salem Willows Yacht Club, Inc
Address Salem Willows Park, Salem, MA 01970
Location of Property: Salem Willows Park
Project Description: rebuilding of pier and building
RE'C:E i `J ED
NAR Co "), �8 M'79
CITY GL fiK'S OFFICE
SALEM,MASS.
City Clerk Stan
I. It has been determined by the Building Inspector that the above property
lies in the following area(s):
A. Wetlands District
Wetlands ( ) Buffer Zone ( )
13. Flood Hazard District
Zone A ( ) Zone A3 ( ) Zone V3 ( X )
II. Information required includes this application and the following additional
information (file one copy of everything with the City Clerk and five
copies with the Planning Board; all copies must be stamped by the City Clerk):
1. Lot lines within which the development is proposed and the tie-
in to the nearest road intersection;
2. The location, boundaries, and dimensions of each lot in question;
3. Two -foot contours of the existing and proposed land surface;
4. Location of existing and proposed structures, water -courses,
drainage and drainage easements, means of access, utilities,
and sewer disposal facilities including leaching fields, if
any. Proposed elevations should be noted.
5. Boundaries of all districts, areas and zones as noted in
Section I.
N
-2-
B. In the Wetlands District, a determination by a qualified engineer
of the seasonal high water table, performed during the last two
weeks of March or the first three weeks of April. A minimum of
two percolation tests for each leaching area shall be performed.
C. In cases of flood -proofing or pile construction, certification
by a registered professional engineer or architect as to the
elevation of flood -proofing measures and as to compliance with the
applicable sections of the Massachusetts State Building Code
concerned with flood depths, pressures, velocities, impact and
uplift forces, and other factors associated with the base flood.
Where specific methods or techniques have been previously certi-
fied, the Planning Board may waive this requirement.
D. A list of Federal, State, and other local permits required by the
applicant.
E. Descriptions relative to all conditions applicable in Section III
below.
III. Conditions (Complete those sections indicated (x) by the Building Inspector)
In the Wetlands and Flood Hazard Districts no structure or building,
including pipes and wells, shall be erected, constructed, substantially
improved, enlarged, or otherwise created or moved; no area shall be
paved; no earth or other material shall be stored, dumped, used as
fill, excavated, or transferred;,and no sediment shall be caused to
be discharged from or onto a wetland, unless all the following condi—
tions are found to exist as part of the granting of a Special Permit by
the Planning Board (Use additional pages if necessary):
A. All Districts:
(X) 1. The proposed use will comply in all respects to the uses and
provision's of the underlying District in which the land is
locatod. yes X No
streets and pro.perty,. particularly in the event of flooding
of the lot(s) or adjacent lot(s) caused by either overspill
from water bodies or high runoff.
No roads or pedestrian traffic are in the near vicinity.
0
-3-
/ (X) 3. Utilities, including gas, electrictity, fuel, water, and
sewage disposal, shall be located and constructed so as to
protect against breaking, leaking, shortcircuiting, grounding
or igniting or any other damage due to flooding. (Provide
details)
electricity a junction box used at the interface of the new and existing structure
with a ground au a e use x s ou a use e e ec rtc pump or
gasoline fuel should be in the clubhouse area and connected to the ground fault.
Water shut off valve should be located at existing clubhouse. Sewage disposal
❑ot_applienbla in new constrnetlnn nrea
(X) 4. The cumulative effect of the proposed development or use, when
combined with all other existing and anticipated development
and uses will not obstruct or divert flood flow; substantially
reduce natural flood -water storage capacity in the local
drainage area; destroy valuable habitat for wildlife including
fisheries or shellfisheries; adversely affect groundwater
resources or increase storm water run-off velocity so that
water levels on other land are substantially raised or the
danger from flooding increased.
Natural grading and water runoff has not been altered.
1. 'i.he propo�,cd development. or cse shal.i� nuc ,_...Luna the :;! orage
of salt, chemicals, petroleum products or other contannnating
substances or discharge of any polluting liquids or materials
into streams, brooks or wetlands. (The polluting effects of
substances on the Wetlands are to be gauged by the "Rules and
Regulations for the Establishment of Minimum Water Quality
Standards and for the Protection of the Quality and Value of
Water Resources" of the Commonwealth of Massachusetts.)
C
-4-
2. The floor level of areas to be occupied by human beings as
living or work space shall be four (4) feet or more above
the seasonal high water table.
3. If the basement floor level is below the seasonal high water
table and affords the possibility of human occupancy at some
'future date; although not originally intended, adequate
perimeter drainage and foundation shall be installed to with-
stand the effect of pressure and seepage. Furnace and utilities
are to be protected from the'effects of leaching. (Provide details)
Applies ( ) Does not Apply ( )
4. If the lot is to be served by an on lot septic system, the
leaching area designed for use, as well as a reserved area
for future expansion or total future use, shall be plotted with
dimensions on the site plan, and the leaching areas shall not
be constructed where the seasonal high water table is less
than 4 feet below the bottom of the leaching areas.
Applies ( ) See site plan
Does not apply ( )
Flood Hazard District (all zones):
1. The floor of the basement, or if none, the lowest floor of
structs •n n-, substant4 it i.,r,rovement of str.ur_tures for
tl i.1 v! :r [I_o,rl
Main floor level (lowest level) is at'or above the 100 year floor level.
Top of floor is at 15.9 feet.
2. The floor of the basement, or if none, the lowest floor of
new construction or substantial improvement of structures for non-
residential uses shall be at or above the 100 year flood level
or.the structures shall be flood -proofed to that level in
compliance with the applicable requirements of the Massachusetts
State Building Code. Flood -proofing measures shall insure
that the structure is watertight and that structural components
have the capahi.lity of resisting hydrostatic and hydrodynamic
1.n0."a 1.1 01" , fF"' -t 'loll"' ill Y.
See answer to question C. 1, above.
cif
-5-
D. Flood Hazard District, Coastal High Hazard Area (Zone V3):
( ) 1. New structures or substantial improvements shall be located
landward of the reach of Mean High Tide.
Structure is being rebuilt in the same previous location, however,
e pilings are within reach of the mean high Me. ,
( ) 2. New structures or, substantial improvements shall be elevated
on adequately anchored pilings or columns, and securely
anchored to such pilings or columns so that the lowest
portion of the structural members of the lowest floor (ex-
cluding the pilings or columns) is elevated to or above the 100
year flood level. Space below the lowest floor shall be free
of fixed obstruction. (Provide details)
The lowest floor level is at or above the 100 year flood level. (see
drawings for details.)
( ) 3. The support of new structures or substantial improvements shall
not be, in whole or in part, by the use of fill. (Provide details)
The replaced structure is not on fill. The pilings are securely
attached to ledge.
IV. Procedure
The Planning Board shall, within 7 days after the filing of this
-.,nliCat i,n' ! ansni[ one (-_or'_ of n,. c on. ,I _, ,:11
_,... .... _ ... t :. o., :I 'i t _ i.i
to the Planning Board. The Planning Board shall not take final action
on such application until it has received a report thereon from the
Inspector of Buildings, City Engineer, Board of Health and Conservation
Commission or until thirty-five (35) days have elapsed after dis-
tribution of such application without a submission of a report. The
Planning Board Shall hold a Public Hearing on said application as soon
as possible after receiving the above reports, in accordance with
Chapter 40A of the Massachusetts General Laws. The Planning Board
shall notify the applicant in writing of its decision on the special
permit. The decision shall document the proposed development or use
and the grounds for granting or refusing the special. permit. The
-6-
,t --e
Planning Board may, as a condition of approval, require that the appli-
cant give effective notice to prospective purchasers, by signs or
by recording the special permit at the Registry of Deeds, of the wet-
land or flood hazard conditions associated with said premises and the
steps undertaken by the petitioner or his successor in title to
alleviate the effects of same. n- I 'I'/
Signed �—
Title
Date
STRUCTURES ENGINEERING .
eShuctuzaf Engine m n9 4&tule i
Subject --L) 7 1 L i-T�-/ --Lor—AT_1 o>J5 4- DETA! LS
Pape --I --- 01--�---
Made by----
Date----
Chocked
y____Date----Checked by --- wQ____----_-__
Date---- 3 --I /D -'79
SA.Lsm WILLOWS YACTI-W CLUE
STORM RE-P.AIR.
S uPPLU-MC—NT
SK1=TCH No,
No. 1
SUB JE -CT
1. PLAtJ 5140WIQ4G LocA,7io J OF UTILiTiEs +
EXISTIbJ4 SEPTIC HOLDIWO1 TAiJK
2, LOCAT%OPJ PLAID
A90 900 -TIG of
To PIER.
of EX15T PLUMB Ir q FIXTORES
tJsw FO GL 4- WATER PIPES
3, DE -'AOL OP NEW HOLM O!®WIJ SYSTEM FOR
-aoLvitiq TANK
%.D
Zp�
3.0
4.9
lb
b+
A�q
V*
5�9 '
SAND AN17 ROCK
5.0
X5_4 5.8 5.96.
42 6.0 PROPOSED PILE
TYPICAL
7.0
�O O
8f°
I °x5 STIRUCTu2E,
g �5 PE + . E IST. PILE
M N.VJ. _ T PIC L e N
jlHOL Wra, 7ANk
sxn $ P OM P EXIST
19 ; iLQ N EV EL
--LING
�s0
4,
-+4
0,
S2 9
WA -
\0%
\ l0*5
LED (i
TYPIC-
134
ANKNAE 170 O,; TER LINE
Li eN
.48 VE
NOTE S
IMOICAT66 LOCATIe,a of Avr* 3MVrdjQr VALVA lAi FOES
LINE wAiltw AGiIVAl6S iNTale EV&Alr cF A Fi.tE al!
OAFAF I K NtJ T/JE L O Add
D 1 NeieATES t rl E LOC. rlOJV of wAriJt ""AF SHa(oFF
(N��f1uvA6)
S
%.D
Zp�
3.0
4.9
lb
b+
A�q
V*
5�9 '
SAND AN17 ROCK
5.0
X5_4 5.8 5.96.
42 6.0 PROPOSED PILE
TYPICAL
7.0
�O O
8f°
I °x5 STIRUCTu2E,
g �5 PE + . E IST. PILE
M N.VJ. _ T PIC L e N
jlHOL Wra, 7ANk
sxn $ P OM P EXIST
19 ; iLQ N EV EL
--LING
�s0
4,
-+4
0,
S2 9
WA -
\0%
\ l0*5
LED (i
TYPIC-
134
ANKNAE 170 O,; TER LINE
Li eN
.48 VE
NOTE S
IMOICAT66 LOCATIe,a of Avr* 3MVrdjQr VALVA lAi FOES
LINE wAiltw AGiIVAl6S iNTale EV&Alr cF A Fi.tE al!
OAFAF I K NtJ T/JE L O Add
D 1 NeieATES t rl E LOC. rlOJV of wAriJt ""AF SHa(oFF
(N��f1uvA6)
_ C.t
LAMES MENS
W
x:
LU
FOEL PIPC ;X
VNDE R %
FLooje At
+i t
5 i o i
o f 14'- 0"
-� B�. op e � _ o..
PosT � RA I��
4p! ots
POST'#RAi�
FENCE Z
1
wArEe
LIME
4X4 dos vAv0E12
CTYr?1) FLO# 2
NorE: ALL PQvvGe LiNEs
of TH@4
TO1'HE Ekrr
GLVg
'4s=E TO
G ftoJNn
MOUSE
HAvE A
SYrTEM
FAULT
/N L IAJC.
For:L PUMP
Jl
APPROX GRADE
L In7E �xIST.
WA LL
APprtox
TOP oP .
-fYP. SAS1
FIXTURE
CX/ST//JCa NocoiNe.
TANK 9- PUMP
ZIU4x 32"H'( N
NIS
C-X/S i 1NG CONC. PAD.
ORAI n! PI
K/TCNC- N
I TYP t
11 "OTE
�TA>J K 4-
-(1ctlk - EYrc BOLT
EYE BOLT
Exlsr, CON6-1
I N Le"T J�. 0.
Pt_a;r�l
TO
�- %2 "x 2" FLAT BAR
2f-00 LOUG:,
.,p�-2-NUT3 Top 4-
L
L I -NUT BQT..
112"0 THREADED
ROD C TYp. )
07 L) R N BLfC1G6L-
(TYP.) ..
'B.14"4E-va eoLT
2'-O" LONG
T�1�MIN [TYP.)
DRILL ¢
QZOU-T
N EW PQLbDovyiy SYS-TeM
FPR 'EXISTIM& T,&kAK
Noyes:
I. ALL S -Mr --L RODS,
FLAT BARS -i EYE
15OLTSy A)Jp
-TURN 6uo1ML3
PARE To BE
GAL V.
Z. WOL.DING TANK
ANSO PUMP 16
TO BE REMovED
Ila THE W1►aT6c2
FOR TY PICAL-
MAINT. ANa
STORAGE. AS 1M
T WE PAST. YEARS.
F. MaRrELUT1 3-17.79
STRUCTURES ENGINEERING
�t�tLLzaP �nyuy �zZ�t� I
Subject _ Pp-oPo S E D _ P;e�TrCTjd WA LL
Page --- L- of --I --
Made by___F-_-oQtEi tT1
Date --_3 _[!o _79 _____------
Checked byZ--VY-<-R _____-__--__
Date ---- -----------
S UFPLEMENT No ?-
5 k &TC H
5k&TCH ►Jo
5u3.fC-CT
1, E-LGVATIOQ 51-lOU)iQ6i
2. TYPICAL RL= iNFolZctlJCa
Loc.ATio+J
5CCl l o.J
APPROxTOP
OF LF6e4E
Lac.^TIdIV OF �� _ \�� 3 3
pRGT6eGTICIJ WALL
�APPRoX,
CTRADE UNE \
0
EAST ELEVATION T .
1
NOTES
CONc QETE
RE STt6L
LoMPRESSIV6 STRGNGTw
Fy= &0,000 Psi
3 Soo psi
1 t-911
PROTECT1otJ WALL.
DKILL + GIC OUT
RESTELL. sl-(."
INTO LC -06E
CAST SIDE