CMU @ LOADING DOCK & CONST. CONT DOCS Commonwealth of Massachusetts
(çi))
City of Salem {!120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 -
tVE
Return card to Building Division for Certificate of Occupancy
Permit No. B-19-70 PERMIT TO BUILD
FEE PAID: $671.00
DATE ISSUED: 1/22/2019
This certifies that BERMAN PROPERTIES,LLC CIO TROPICAL PRODUCTS INC
has permission to erect, alter, or demolish a building 218-222 HIGHLAND AVENUE Map/Lot: 80124-0
as follows: Other Building Permit CMU WALLS AT LOADING DOCK, REPLACE DOOR
Contractor Name: SCOTT P. BAILEY
DBA: MURRAY MASONRY & MORE CORP
Contractor License No: CS-076330
1/22/2019
Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
HIC#: 169898 "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
Commonwealth of Massachusetts
' lF ZJT City of Salem �:'
� �e 120 Washington St,3rd Floor Salem.MA 01970(978)745 9595 x5641 F
stif� "x�'Uo Return card to Building Division for Certificate of Occupancy
Structure CITY OF SALEM BUILDING PERMIT uCONOIp�H
PERMIT TO BE POSTED IN THE WINDOW ', y
Excavation
Footing INSPECTION RECORD
Foundation
Framing
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber
Final 1 _AO 1
Plumbing/Gas
Rough:Plumbing
Rough:Gas
Final
Electrical
Service
Rough
Final
N,. Fire Department
Preliminary
Final
Health Department
Preliminary
Final
Final Construction Control Document
t To be submitted at completion of construction by a
.� t rl Registered Design Professional
," for work per the ninth edition of the
,ram
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: "Tropical Products Date:July 30,2019 Permit No. B-19-70
Property Address: 220 Highland Ave,Salem,MA
Project: Check (x) one or both as applicable: New construction X Existing Construction
Project description: Concrete Masonry Wall and Foundation Repair
I Edward H. Moll, MA Registration Number: 33718 Expiration date: 6-30-2020 , am a registered design
professional, and I have prepared or directly supervised the preparation of all design plans,computations and
specifications concerning:
_Architectural X Structural _Mechanical
Fire Protection Electrical Other:Describe
for the above named project. I, or my designee, have performed the necessary professional services and was
present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and
belief the work proceeded in accordance with the requirements of 780 CMR and the design documents
approved as part of the building permit and that I or my designee:
1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and
other submittals by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar
with the progress and quality of the work and to determine if the work was performed in a manner
consistent with the construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
3°OF M1,s,s
Enter in the space to the right a"wet" or 144
, opelectronic signature and seal:
Phone number: +1 (978) 745-6817 Email:emoll@structures-north.com 1 1
Building Official Use Only
Building Official Name: Permit No.: Date:
Version Ol 01 2018
Final Construction Control Document
fe, To be submitted at completion of construction by a
�rl
Registered Design Professional
—S'1
�,�r for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title:Tropical Products Date:July 30,2019 Permit No.B-19-70
Property Address: 220 Highland Ave,Salem,MA
Project: Check (x) one or both as applicable: New construction X Existing Construction
Project description: Concrete Masonry Wall and Foundation Repair
I Edward H. Moll, MA Registration Number: 33718 Expiration date: 6-30-2020 , am a registered design
professional, and I have prepared or directly supervised the preparation of all design plans,computations and
specifications concerning:
Architectural X Structural _Mechanical
Fire Protection _Electrical Other:Describe
for the above named project. I, or my designee, have performed the necessary professional services and was
present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and
belief the work proceeded in accordance with the requirements of 780 CMR and the design documents
approved as part of the building permit and that I or my designee: •
1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and
other submittals by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar
with the progress and quality of the work and to determine if the work was performed in a manner
consistent with the construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
Enter in the space to the right a"wet" or �0~N uF 4`�sy
‘1101:' E x Af7f3 �
electronic signature and seal: KJ ,t.n �
! 01
•
' } u •
41 %rsr �o 4
Phone number: +1 (978) 745-6817 Email: emoll®structures-north.com1tuAti
Building Official Use Only
Building Official Name: Permit No.: Date:
Version 01 01 2018