Loading...
FOUNDATION PERMIT @ LOT 2 2, 44 Commonwealth of Massachusetts ` City of Salem17 *. • 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 1 N;p0 Return card to Building Division for Certificate of Occupancy Permit No. 8-18-1381 PERMIT TO BUILD FEE PAID: $91.00 DATE ISSUED: 1/2/2019 This certifies that WOODLANDS REALTY TRUST MENINNO NICHOLAS S/REGAN has permission to erect, alter, or demolish a building 3 WOODLANDS ROAD Map/Lot: as follows: Other Building Permit PERMIT FOR FOUNDATION ONLY @ LOT #2 Contractor Name: NICHOLAS S. MENINNO DBA: MENINNO CONSTRUCTION Contractor License No: CS-038388 ��•�.. 1/2/2019 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. HIC #: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. TA Commonwealth of Massachusetts : , ham/ �95. { City of Salem - � 2 4 �� �n vCj,,,, ii ,rkF�_ -.aP 120 Washington St.3rd Floor Salem,MA 01970(978)745-9595 x5641 Ann:Dom Return card to Building Division for Certificate of Occupancy ti Structure CITY OF SALEM BUILDING PERMIT co, 4`="°'_"'� Excavation PERMIT TO BE POSTED IN THE WINDOW ' W;``_ /6 ,� Footing INSPECTION RECORD .. Foundation if_Li.—/F � r Framing Mechanical Insulation INSPECTION: BY DATE Chimney/Smoke Chamber Final 9 /2./ 9�„ „, 0,411 Plumbing/Gas Rough: Plumbing Rough:Gas Final Li; Electrical Service Rough Final Fire Department Preliminary Final - Health Department fit Preliminary Final