S/O B-19-263 r
°"D'r� Commonwealth of Massachusetts
.L_
a ,- �a City of Salem
rT�N f; °-'�C 120 Washington St,3rd Floor Salem,MA 01970(978)74Li-9595 x5641 ,
Q x,N}; �' Return card to Building Division for Certificate of Occupancy �" '
Permit No. 6-19-263 PERMIT T BUILD
FEE PAID: $1,675.20
DATE ISSUED: 3/15/2019
This certifies that WOODLANDS REALTY TRUST
has permission to erect, alter, or demolish a building 6 WOODLANDS ROAD Map/Lot:
as follows: Other Building Permit CONSTRUCTION OF A NEW, SINGLE FAMILY HOME.
Contractor Name: THOMAS G. RICE
DBA: TRI CONSTRUCTION
Contractor License No: CS-069299
(;4„.„,,
k��� °"`, 3/15/2019
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documei Its for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local Toning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
HIC#: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
+coNi,-, L Commonwealth of Massachusetts
iiJ/‘12, City of Salem * 'A 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
"}" Return card to Building Division for Certificate of Occupancy
Structure CITY OF SALEM BUILDING PERMIT .4c(r
PERMIT TO BE POSTED IN THE WINDOW - :..tt,..).,n
Excavation
Footing INSPECTION RECORD
Foundation
Framing,ZJ�rD !
- / g ��,
Mechanical � !�
Insulation 6_ ogco 79 ,c INSPECTION: BY DATE
Chimney/Smoke Chamber h
Final // - .Z o��/ / // qri4f '& .�'" T r oteh �.'C
Plumbing/Gasjjaff �� /Add ‘. �
,.‘ea./1-4,e 0,04,, (2.-.444: lie
Rough:Plumbing4
Rough:Gas c
Final
LaIll Electrical
Service
Rough J ///
Final / e
0 Fire artment
Prelimina
FinQic......4
i l 114=l
ig Health Department
Preliminary
Final