UTS Job 23418 Report 97 Soil Inspection Report 11-13-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-13-2019Soil Inspection Report Report No.97 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Cloudy, 20°-30° TIME:7:00 AM CONTACT:Pat Madden of Fulcrum Associates PURPOSE:To observe earthwork construction and perform field density testing EQUIPMENT:Deere 450C, 380G, 75G & 992E excavators; Wacker DPU 6555 & 200Lb. plate compactors; CAT 980 & 950 loaders; and Ingersoll Rand pro pac 110 series 10 ton drum roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: Installation of light pole bases was performed at the west side of building 1. The excavation was performed utilizing the Deere 27 mini excavator. The Precast structures were set atop a base of gravel or 3/4" crushed stone. The bases were backfilled using the same material generated during excavation generally consisting of F-C gravel, and sand, trace silt. The material was compacted utilizing the Wacker ½ ton plate compactor exhibiting stable/firm conditions. Installation of the foundation drain was completed at the west side of building 1. The 4" diameter perforated pvc piping was installed and bedded in 3/4" crushed stone. The crushed stone was covered in filter fabric. A new invert was cut into DMH 4 to accommodate the pvc utility. The trench was backfilled using 1.5" reprocessed material from the Carusso pit in Revere, MA. Approximately 16" thick lifts were placed and graded. Each lift was compacted employing several passes of coverage utilizing the Wacker plate compactor exhibiting stable/firm conditions. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-13-2019Soil Inspection Report Report No.97 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-13-2019 Report No.97 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment