UTS Job 23418 Report 99 Soil Inspection Report 11-14-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-14-2019Soil Inspection Report Report No.99 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy, 30° TIME:7:00 AM CONTACT:Pat Madden of Fulcrum PURPOSE:To observe earthwork construction and perform field density testing EQUIPMENT:Deere 450C, 380G, 75G & 992E excavators; Wacker DPU 6555 & 200Lb. plate compactors; CAT 980 & 950 loaders; and Ingersoll Rand pro pac 110 series 10 ton drum roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: Drainage utility installation was performed at the north side of building 1. Double catch basin 14 was installed and connected to previously installed DMH 14. Sub grade improvements were performed for the catch basin structure for improved support given the unfavorable organic sub grade conditions. The excavation was carried down approximately 18" below bottom of structure elevation utilizing the Deere 380 excavator. The sub grade soils in this area is tannin bark. A layer of geogrid was placed over the sub grade followed by a 12" thick layer of 3/4" crushed stone. The stone was tamped into place utilizing the excavator bucket. Final excavation and base preparation was completed as quickly as possible due to the presence of groundwater. The structure was installed and backfilled using the urban fill generated during excavation. The 12"-18" thick lifts were placed and graded. Each lift was compacted utilizing the Wacker plate compactor exhibiting stable/firm conditions. The structures were connected using 12" diameter HDPE piping. The piping was installed and bedded in 3/4" crushed stone. The shallow trench was backfilled to existing grade utilizing 1.5" reprocessed material from the Carusso pit in Revere, MA. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-14-2019Soil Inspection Report Report No.99 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-14-2019 Report No.99 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment