Loading...
UTS Job 23418 Report 89 Soil Inspection Report 11-04-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-04-2019Soil Inspection Report Report No.89 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 50-60° TIME:7:00 AM CONTACT:Pat Madden of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Foundation backfilling was performed within the eastern limits of building 1. The backfill material used is the more select material generated form perimeter/interior footing excavation within the SSE limits of building #1. The material generally consists of F - M sand, and gravel, trace silt. 12 - 18" thick lifts were placed and graded utilizing the Deere 75 excavator. Each lift was compacted employing several passes of coverage utilizing the Wacker ½ ton plate compactor exhibiting stable/firm conditions. Use of this material was discontinued because the material transitioned to common fill rather than structural fill due to the presence of greater silt content and some loamy/organic constituent. Work in this area was temporarily abandoned. Placement and grading of slab base course materials was performed within the Amenity space of building 2. The majority of base course material was previously placed within this area. Minor amounts of material was placed and graded on this date utilizing the Deere mini excavator and skid loader. This material is ½" reprocessed material from the Caruso pit in Revere, MA. The material was fine graded and briefly compacted on this date utilizing the Wacker ½ ton plate compactor exhibiting stable/firm conditions. Work in this area remained incomplete on this date. Drainage utilities were installed @ the north side of building 1. CB 16 was installed and connected to previously installed DMH 15 with 12" diameter HDPE. The Structures were set atop an approximate 12" thick base of ¾" crushed stone. The HDPE piping was also bedded and covered in ¾" crushed stone. The Shallow utility was backfilled using the same common fill generated during Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-04-2019Soil Inspection Report Report No.89 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates excavation. The fill was compacted utilizing the wacker plate compactor exhibiting stable/firm conditions. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY: Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-04-2019 Report No.89 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment