UTS Job 23418 Report 90 Soil Inspection Report 11-05-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-05-2019Soil Inspection Report Report No.90 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Overcast/rain 40-50° TIME:7:00 AM CONTACT:Pat Madden of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Foundation backfilling and slab sub base filling was performed within the eastern limits of building 1. The backfill material used is 1.5" reprocessed material from the Caruso pit in Revere, MA. A single 3 - 18" thick lift was placed and graded utilizing the Deere 75 excavator and bulldozer. The gravel was compacted employing several passes of coverage utilizing the Wacker ½ ton plate compactor and small IR drum roller exhibiting stable/firm conditions. Fine grading and compaction of slab base course materials was completed within the Amenity space of building 2. The majority of base course material was previously placed within this area. Minor cuts and fills were performed on this date utilizing the Deere mini excavator and skid loader. This material is ½" reprocessed material from the Caruso pit in Revere, MA. The material was fine graded and compacted on this date utilizing the Wacker ½ ton plate compactor and small IR drum roller exhibiting stable/firm conditions. Exterior foundation backfilling was performed along the southern perimeter of building 1. The material used is onsite generated common fill generally consisting of F - M sand, some gravel, little silt. The material was compacted utilizing the Wacker plate compactor exhibiting stable/firm conditions. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-05-2019Soil Inspection Report Report No.90 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-05-2019 Report No.90 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-05-2019 Report No.90 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment