Loading...
UTS Job 23418 Report 92 Soil Inspection Report 11-07-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-07-2019Soil Inspection Report Report No.92 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Cloudy 40-50° TIME:7:00 AM CONTACT:Pat Madden of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Placement of slab base course materials continued within the south-southeast limits of building 1. The area was previously filled to approximate sub base elevation (8.33'). The material used for base course is 1.5" reprocessed material from the Caruso pit in Revere, MA. A single 15" thick lift was placed and graded utilizing the Deere bulldozer. Some areas were compacted utilizing the Wacker ½ ton plate compactor and small IR drum roller exhibiting stable/firm conditions. Work in this area remained incomplete on this date. Foundation backfilling was performed within the eastern limits of building 1 (bike shop). The backfill material used is 1.5" reprocessed material from the Caruso pit in Revere, MA. 12" thick lifts were placed and graded utilizing the Deere 75 excavator and bulldozer. Rigid Styrofoam insulation was applied to the foundation walls where required as indicated on the plans. The gravel was compacted employing several passes of coverage utilizing the Wacker ½ ton plate compactor exhibiting stable/firm conditions. Slab sub grade cuts were performed within the southern limits of building #2 parking garage area. The in-place material at this location is not considered base course gravel and was removed to design slab sub base elevation (8.33'). The soil was removed utilizing the Deere 75 excavator. The exposed sub grade soil was then compacted utilizing the small IR drum roller and Wacker plate compactor exhibiting stable/firm conditions. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-07-2019Soil Inspection Report Report No.92 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-07-2019 Report No.92 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-07-2019 Report No.92 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment