UTS Job 23418 Report 93 Soil Inspection Report 11-08-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-08-2019Soil Inspection Report
Report No.93
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Cloudy 40-50°
TIME:7:00 AM
CONTACT:Pat Madden of Fulcrum Associates
PURPOSE:Observe earthwork construction
EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate
Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum
Roller
TEST METHOD:Sand Cone Nuclear Densometer
TITLE:Inspector Staff Engineer EngineerX
OBSERVATIONS:
This report follows a site visit to observe/test the earthwork for: Footing trench excavation.
Placement and grading of slab base course materials continued within the parking garage area of
building 2. The majority of base course gravel was previously placed within the northern limits of the
current work area. Work on this date was spent shaping, fine grading and profiling the gravel surface
for positive pitch to floor drains. Full depth slab base was placed within the southern limits of the
garage area. Sub grade cuts were previously completed within this area to achieve sub base elevation
8.33'. The material used is 1.5 and ¾" reprocessed material from the Caruso pit in Revere, MA. A single
15" thick lift was placed and graded utilizing the Deere mini excavator and skid loader. Some areas
were compacted utilizing the Wacker ½ ton plate compactor and small IR drum roller exhibiting
stable/firm conditions. Work in this area remained incomplete on this date. A smaller crushed (3/4")
reprocessed gravel was imported to the site and used as slab base on this date. A sample of this
material was collected and transported to the UTS laboratory for sieve and proctor analysis.
Inspector Premium Travel
Name Time Hours Time
M. Chace No 8.00 1 Hr(s)
REVIEWED BY:Chuck Fraser
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-08-2019Soil Inspection Report
Report No.93
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
cc:Fulcrum Associates Pat Madden
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
DSF Flint Salem LLC Dimitri Kourtis
Fulcrum Associates Bob Levesque
DSF Advisors Thomas Mazza
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-08-2019
Report No.93
Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MAAttachment