UTS Job 23418 Report 93 Soil Inspection Report 11-08-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-08-2019Soil Inspection Report Report No.93 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Cloudy 40-50° TIME:7:00 AM CONTACT:Pat Madden of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Placement and grading of slab base course materials continued within the parking garage area of building 2. The majority of base course gravel was previously placed within the northern limits of the current work area. Work on this date was spent shaping, fine grading and profiling the gravel surface for positive pitch to floor drains. Full depth slab base was placed within the southern limits of the garage area. Sub grade cuts were previously completed within this area to achieve sub base elevation 8.33'. The material used is 1.5 and ¾" reprocessed material from the Caruso pit in Revere, MA. A single 15" thick lift was placed and graded utilizing the Deere mini excavator and skid loader. Some areas were compacted utilizing the Wacker ½ ton plate compactor and small IR drum roller exhibiting stable/firm conditions. Work in this area remained incomplete on this date. A smaller crushed (3/4") reprocessed gravel was imported to the site and used as slab base on this date. A sample of this material was collected and transported to the UTS laboratory for sieve and proctor analysis. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-08-2019Soil Inspection Report Report No.93 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-08-2019 Report No.93 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment