Loading...
UTS Job 23418 Report 94 Soil Inspection Report 11-12-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-12-2019Soil Inspection Report Report No.94 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Light Rain, 37° TIME:11:30 AM CONTACT:Pat Madden of Fulcrum Associates PURPOSE:Observe earthwork construction and perform field density tests. EQUIPMENT: TEST METHOD:Sand Cone Nuclear DensometerX TITLE:Inspector Staff Engineer Engineer Maximum Field Test Percent Dry Dry Percent Elevation No.Moisture Density Density Compaction Location (Feet) 1 8.6 129.2 118.0 91.3 See sketch FSB 2 8.8 129.2 123.8 95.8 See sketch FSB 3 7.5 129.2 120.1 92.9 See sketch FSB 4 7.4 129.2 121.8 94.3 See sketch FSB 5 4.6 129.2 133.2 100.0 See sketch FSB 6 5.3 129.2 124.7 96.5 See sketch FSB 7 7.8 129.2 120.4 93.2 See sketch FSB 8 5.7 129.2 122.2 94.6 See sketch FSB 9 6.8 129.2 118.1 91.4 See sketch FSB 10 6.9 129.2 118.9 92.0 See sketch FSB OBSERVATIONS: This report follows a site visit to observe/test the earthwork for floor slab-base. The writer observed that the area had been prepared prior to arrival. Soil Description: 1 1/2" reprocessed from Caruso. A total of 10 field density tests were performed using the ASTM D6938 Nuclear Densometer method of testing. Field density tests #2, #5 and #6 do conform to minimum requirements of 95% compaction. Tests #1, #3, #4, #7, #8, #9 and #10 failed. These observations/testing results were reported to Mr. Madden during this visit. Inspector Premium Travel Name Time Hours Time M. Hashem No Min Day 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-12-2019Soil Inspection Report Report No.94 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-12-2019 Report No.94 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment