UTS Job 23418 Report 46 Compressive Strength Report - Concrete 09-26-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-26-2019Compressive Strength Report - Concrete Report No.46 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"No. Of Sets:1 7CUBIC YARDS: SET 1 LOCATION:SOG; Building #2, South stairs adjacent to elevator Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type W835 4.00 x 8.00 12.57 Good 09/26/19 10/03/19 7 36,000 2,860 1 W836 4.00 x 8.00 12.57 Good 09/26/19 10/10/19 14 45,000 3,580 2 W837 4.00 x 8.00 12.57 Good 09/26/19 10/24/19 28 60,000 4,770 2 W838 4.00 x 8.00 12.57 Good 09/26/19 10/24/19 28 61,000 4,850 2 W839 4.00 x 8.00 12.57 Good 09/26/19 10/24/19 28 57,000 4,530 3 Slump (in.)7 3/4 Air Temp. (F.)71 Conc Temp (F)73 Truck No.247 Ticket No.2282 Time 12:00 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 10/01/19. Inspector Premium Travel Name Time Hours Time M. Chace No REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-26-2019Compressive Strength Report - Concrete Report No.46 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-26-2019Compressive Strength Report - Concrete Report No.46 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan FIELD SUMMARY REPORT Total Pour:SOG; Building #2, Stairs 1, 2 Method of Placement:Pump Chute Discharge Bucket OtherXX Other:Wheelbarrow and cold chute Vibrator OtherMethod of Concrete Consolidation:X Other:Hand tools Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)4-6 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-26-2019 Report No.46 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment