Loading...
UTS Job 23418 Report 51 Compressive Strength Report - Concrete 10-16-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-16-2019Compressive Strength Report - Concrete Report No.51 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"*No. Of Sets:1 43CUBIC YARDS: SET 1 LOCATION:Building 1 footing, column line G at 6 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type D652 4.00 x 8.00 12.57 Good 10/16/19 10/23/19 7 27,000 2,150 3 D653 4.00 x 8.00 12.57 Good 10/16/19 10/30/19 14 40,000 3,180 3 D654 4 x 8 12.57 Good 10/16/19 11/13/19 28 D655 4 x 8 12.57 Good 10/16/19 11/13/19 28 D656 4 x 8 12.57 Good 10/16/19 11/13/19 28 Slump (in.)5 3/4 Air Temp. (F.)56 Conc Temp (F)67 Truck No.231 Ticket No.163083 Time 1:15 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:*MRWR; Cylinders received on 10/21/2019. Inspector Premium Travel Name Time Hours Time M. Chace No REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-16-2019Compressive Strength Report - Concrete Report No.51 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. Maclellan cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-16-2019Compressive Strength Report - Concrete Report No.51 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:Building 1 footing, column line G and H at 2, G at 6, 8 at F-H, H at 7.5-11.5 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)4-6 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-16-2019 Report No.51 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment