UTS Job 23418 Report 87 Soil Inspection Report 11-01-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-01-2019Soil Inspection Report
Report No.87
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Partly cloudy 50-60°
TIME:7:00 AM
CONTACT:Pat Madden of Fulcrum Associates
PURPOSE:Observe earthwork construction and perform field density test
EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate
Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum
Roller
TEST METHOD:Sand Cone Nuclear Densometer
TITLE:Inspector Staff Engineer EngineerX
OBSERVATIONS:
This report follows a site visit to observe/test the earthwork for: Footing trench excavation.
Placement and grading of slab base course materials was performed within the Northern limits of
building 2. A layer of processed gravel was previously placed within this area of the building to
facilitate access and installation GCC foundation elements. The material used is 2"minus processed
gravel from the Mennino project in Salem MA consisting of F - C gravel, some sand, trace silt. This
material ranges from 10 - 30" in thickness and averages approximately 20". This gravel is very dense
and compact from continuous construction traffic. Supplemental material was placed over the existing
grades on this date to achieve design slab base elevation (9.58'). Approximately 3 - 8" of material was
placed and graded on this date utilizing the Deere mini excavator and skid loader. This material is ½"
reprocessed material from the Carusso pit in Revere, MA. The material was rough graded and briefly
compacted on this date utilizing the Wacker ½ ton plate compactor exhibiting stable/firm conditions.
Work in this area remained incomplete on this date.
Inspector Premium Travel
Name Time Hours Time
M. Chace No 8.00 1 Hr(s)
REVIEWED BY:Chuck Fraser
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-01-2019Soil Inspection Report
Report No.87
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
cc:Fulcrum Associates Pat Madden
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
DSF Flint Salem LLC Dimitri Kourtis
Fulcrum Associates Bob Levesque
DSF Advisors Thomas Mazza
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-01-2019
Report No.87
Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MAAttachment