Loading...
UTS Job 23418 Report 87 Soil Inspection Report 11-01-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-01-2019Soil Inspection Report Report No.87 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 50-60° TIME:7:00 AM CONTACT:Pat Madden of Fulcrum Associates PURPOSE:Observe earthwork construction and perform field density test EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Placement and grading of slab base course materials was performed within the Northern limits of building 2. A layer of processed gravel was previously placed within this area of the building to facilitate access and installation GCC foundation elements. The material used is 2"minus processed gravel from the Mennino project in Salem MA consisting of F - C gravel, some sand, trace silt. This material ranges from 10 - 30" in thickness and averages approximately 20". This gravel is very dense and compact from continuous construction traffic. Supplemental material was placed over the existing grades on this date to achieve design slab base elevation (9.58'). Approximately 3 - 8" of material was placed and graded on this date utilizing the Deere mini excavator and skid loader. This material is ½" reprocessed material from the Carusso pit in Revere, MA. The material was rough graded and briefly compacted on this date utilizing the Wacker ½ ton plate compactor exhibiting stable/firm conditions. Work in this area remained incomplete on this date. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-01-2019Soil Inspection Report Report No.87 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-01-2019 Report No.87 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment