S/O B-19-118 UNITS 4, 5, & 6 SHEET METAL co NJOIT-4, Commonwealth of Massachusetts
City of SalemUff1J
dl(N7:"-° l,pt+'s7 120 Washington St,3rd Floor Salem.MA 01970(978)745-9595 x564
r
Return card to Building Division for Certificate of Occupancy
Permit No. B-19-118PERMIT TO BUILD
FEE PAID: $140.00
DATE ISSUED: 1/31/2019
This certifies that JUNIPER POINT ICE CREAM WAY LLC
has permission to erect, alter, or demolish a building 9 SOUTH MASON STREET Map/Lot: 260073-0
as follows: Sheet Metal UNITS 4, 5, & 6: INSTALLATION OF ALL NEW DUCTS FOR SUPPLY &
RETURNS; NEW FURNACE & A/COIL ON 2ND FL. MECHANICAL ROOM tip CONDENSER OUT
BACK.
Contractor Name: BILLY SILVA
DBA:
Contractor License No: 1446
r,m;r41.0
� '� 1/31/2019
Building Official Date
This permit shall be deemed abandoned and i walid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to excr:•ed six months each upon written request.
All work authorized by this permit shall confor n to the approved application and the approved construction documents for whicf this permit has been granted.
All construction,alterations and changes of ure of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open fur public ins,lection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issu;d until all applicable signatures by the Building and Fire Officials are provided on Ills permit.
HIC #: "Persons contracting with unregistered contractors do not have access to the guarar tyfund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
Commonwealth of Massachusetts ,
� � i r City of Salem II°.',;. :' 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Structure v
=Lik CITY OF SALEM BUILDING ``'ERMIT '�
,,coemr,�
k � �
PERMIT TO BE POSTED IN THE; WINDOW
Excavation "*Jr
Footing INSPECTION RECORD
Foundation
Framing
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamberp
Final g2.1ok_ // ,
°r' . Plumbing!Gas
nr
Rough:Plumbing
Rough:Gas ---
Final
Liii Electrical
Service
1
Rough -
Final
allifs Fire Department t 1
it
Preliminary
Final
j Health Department ri
Preliminary
Final
J