S/O B-19-29 UNIT 3, SHEET METAL `D"n'T� Commonwealth of Massachusetts ,
yA(: City of SalemW
Cr, _" '�'' 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Permit No. B-1 9-29 E R M I T TO B liJ I L D
FEE PAID: $66.00
DATE ISSUED: 1/9/2019
This certifies that JUNIPER POINT ICE CREAM WAY LLC
has permission to erect, alter, or demolish a building 9 SOUTH MASON STREET Map/Lot: 260073-0
as follows: Sheet Metal UNIT 3: INSTALLATION OF A NEW FURNACE, A/C COIL & CONDENT FURNACE
LOCATED ON 2ND FL (MECHANICAL ROOM) & RUNNING ALL DUCTWORK FO ALL THREE (3)
FLOORS. ZONING: 1ST ONE ZONE & 2ND & 3RD ON ANOTHER ZONE.
Contractor Name: BILLY SILVA
DBA:
Contractor License No: 1446
1/9/2019
Building Officia Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to excoed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of of any building and structures shall be in compliance with the local zoning by-la'vs and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public in pection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issi :d until all applicable signatures by the Building and Fire Officials are provided on this permit.
H IC #: "Persons contracting with unregistered contractors do not have access to the guararty fund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
Commonwealth of Massachusetts
City of Salem
„cr 120 Washington St.3rd Floor Salem.MA 01970(978)745-9595 x5641
AF,uo Return card to Building Division for Certificate of Occuparn:y
Li Structure CITY OF SALEM BUILDING PERMIT 4cONDIp-
PERMIT TO BE POSTED IN THE WINDOW
Excavation {
cT
Footing INSPECTION RECORD -°
Foundation
Framing
Mechanical
Insulation INSPECTION; BY DATE
Chimney/Smoke Chamber
Final 2, Q�/p
Plumbing/Gas
Rough:Plumbing
Rough:Gas
Final
Electrical
Service
Rough
Final
Fire Department
Preliminary
Final
Health Department
Preliminary
Final