Loading...
S/O B-19-28 U2, SHEET METAL Commonwealth of Massachusetts . -'` City of Salem WH' i; r 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x564- Return card to Building Division for Certificate of Occupancy Permit No. B-19-28 PERMIT TO BUILD FEE PAID: $66.00 DATE ISSUED: 1/9/2019 This certifies that JUNIPER POINT ICE CREAM WAY LLC has permission to erect, alter, or demolish a building 9 SOUTH MASON STREET Map/Lot: 260073-0 as follows: Sheet Metal UNIT 2: INSTALLATION OF A NEW FURNACE, A/C COIL, & CONDENT FURNACE LOCATED ON 2ND FL (MECHANICAL ROOM) & RUNNING ALL DUCTWORK FOR ALL THREE (3) FLOORS. ZONNG: 1ST ONE ZONE & 2ND & 3RD ON ANOTHER ZONE. Contractor Name: BILLY SILVA DBA: Contractor License No: 1446 ();��. �1 f744-4t-u?— 1/9/2019 Building Official Date This permit shall be deemed abandoned and i valid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of u t of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public ins..ection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on cis permit. HIC #: "Persons contracting with unregistered contractors do not have access to the guarar.yfund"(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Commonwealth of Massachusettsor A City of Salem W* - ,"4" 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 RE Return card to Building Division for Certificate of Occupancy L Structure CITY OF SALEM BUILDING PERMIT PERMIT TO BE POSTED IN THE WINDOW t. Excavation Footing INSPECTION RECORD Foundation Framing Mechanical Insulation INSPECTION: BY DATE Chimney/Smoke Chamber Final c2 0_/ " 4IP:jai Plumbing/Gas Rough:Plumbing Rough:Gas Final thoj Electrical Service Rough Final Fire Department Preliminary Final ,t Health Department Preliminary Final