PROPOSAL 07/28/2011 G-2012-0119 FURNACE Universal Mechanical Contractors, Inc.
9 Devlin Way Lynn, Ma. 01905
Phone 781 -595-9222
Bringing Quality and Comfort to families for over 25 years.
7/28/ 1 1 Page 1 of 3
Proposal
Submitted to: lob Location:
Mr. Steven Banks 3rd floor
14 Bay View Dr. 14 Pratt St.
Swampscott, Ma. 01907 Salem, Ma. 01970
Email: stevenbanks@byu.net
Proposal Submitted for: the installation of one, 80%, gas fired, Trane
furnace located in the attic for the 3r floor apartment.
The furnace shall be a M# TUD1 B060 with a capacity of 60,000 btus.
A 2.5 ton cooling coil, M# 4TXCB031 will also be installed.
The unit shall sit in an emergency drain pan with a safety switch installed.
One return filter grill will be installed.
Six ceiling supplys will also be installed.
One programmable room thermostat will be installed.
Phone 781 -595-9222 Fax 781 -595-9643
1 Page2of3
The furnace will be vented up through the roof with metal B-vent chimney.
The roof flange will be installed by the roofer contracted by others.
OPTIONAL: Completion of the a/c system at this time.
We shall install a Trane, 2.5 ton, 13 SEER outdoor unit M# 4TTB3030.
This unit shall sit on the ground in the rear of the building on a poured
concrete pad.
The Freon, drain line and electrical will be run exposed down the side of
the house covered with Fortress line hide.
Price includes: cutting holes, materials, equipment, labor, sheetmetal
permit, removal of debris from the job site.
Price does not include: patching, painting ceiling, electrical, gas piping,
roofing.
Furnace & a/c coil: Com lete a c s stem a : $ 2,827.50
Sales to 140.63 122.50
Total $ 5,995.00 $ 2,950.00
&+1A
sj
1 ,
Page 3 of 3
Warranty: one year all parts and labor
Five years equipment parts
Ten years on compressor
Twenty years on heat exchanger
If in agreement with proposal: circle and initial desired options, sign and
return one copy of proposal to Universal, keep one copy for your records.
Payment: $ 3,000.00 on day of delivery of equipment and start of work
followed by progress payments.
Submitted by: Peter Lyon Date: 7/28/1 1
Accepted by: Date:
7! ?7/ j(
Universal Mechanical Contr, may withdraw this proposal if not
accepted within 30 days.