Loading...
PROPOSAL 07/28/2011 G-2012-0119 FURNACE Universal Mechanical Contractors, Inc. 9 Devlin Way Lynn, Ma. 01905 Phone 781 -595-9222 Bringing Quality and Comfort to families for over 25 years. 7/28/ 1 1 Page 1 of 3 Proposal Submitted to: lob Location: Mr. Steven Banks 3rd floor 14 Bay View Dr. 14 Pratt St. Swampscott, Ma. 01907 Salem, Ma. 01970 Email: stevenbanks@byu.net Proposal Submitted for: the installation of one, 80%, gas fired, Trane furnace located in the attic for the 3r floor apartment. The furnace shall be a M# TUD1 B060 with a capacity of 60,000 btus. A 2.5 ton cooling coil, M# 4TXCB031 will also be installed. The unit shall sit in an emergency drain pan with a safety switch installed. One return filter grill will be installed. Six ceiling supplys will also be installed. One programmable room thermostat will be installed. Phone 781 -595-9222 Fax 781 -595-9643 1 Page2of3 The furnace will be vented up through the roof with metal B-vent chimney. The roof flange will be installed by the roofer contracted by others. OPTIONAL: Completion of the a/c system at this time. We shall install a Trane, 2.5 ton, 13 SEER outdoor unit M# 4TTB3030. This unit shall sit on the ground in the rear of the building on a poured concrete pad. The Freon, drain line and electrical will be run exposed down the side of the house covered with Fortress line hide. Price includes: cutting holes, materials, equipment, labor, sheetmetal permit, removal of debris from the job site. Price does not include: patching, painting ceiling, electrical, gas piping, roofing. Furnace & a/c coil: Com lete a c s stem a : $ 2,827.50 Sales to 140.63 122.50 Total $ 5,995.00 $ 2,950.00 &+1A sj 1 , Page 3 of 3 Warranty: one year all parts and labor Five years equipment parts Ten years on compressor Twenty years on heat exchanger If in agreement with proposal: circle and initial desired options, sign and return one copy of proposal to Universal, keep one copy for your records. Payment: $ 3,000.00 on day of delivery of equipment and start of work followed by progress payments. Submitted by: Peter Lyon Date: 7/28/1 1 Accepted by: Date: 7! ?7/ j( Universal Mechanical Contr, may withdraw this proposal if not accepted within 30 days.