CONSTRUCTION OBSERVATION #2 PITMAN & WARDLEy Architecture & Design 32 ('hurch Street • Salem. MA • 978.744.8982 CONSTRUCTION OBSERVATION # 2 May 8th,2019 Tom St.Pierre Inspectional Services Director City of Salem Inspectional Services Salem,Massachusetts 01970 Project: The Breakaway at Salem Common,94 Washington Square Re: Construction Observation Contractor: Thomas Berube Contracting Site contact: Mike Pydnowski Dear Tom, The following observations are based on a periotic site visits by Brigitte Fortin,AIA,of my staff. Observation: Mansion: • Mansion demolition is complete.Existing wood floor finishes and plaster ceiling have been removed to allow installation of a better floor assembly(sound and fire rating). • Underpinning of foundation still underway. First and 2nd floor: • First floor and 2'fl demolition is done, framing of new spaces is underway 3rd floor: • Existing floor framing shows extensive fire damaged from a fire that burned down the roof 100 plus years ago and was concealed by subfloor. Damaged elements were replaced by new framing specified by McBrie. Annex: • Preparation for underslab plumbing is underway. Team decided to eliminate the basement slab completely to allow for easier plumbing installation. • Elevator shaft waterproofing is completed. Recommendations or Actions: 1-n/a Please do not hesitate to be in touch with this office should you have any further questions and or concerns. Respect , V*S1ED 4904; y`v�V el - I No 8749 Peter F.Pitman,Architect ° • Massachusetts Registration No. 8749 �:; . 30STOl\ g PITMAN & WARDLEy Architecture & Design 32 ('hurch Street • Salem. MA • 978.744.8982 CONSTRUCTION OBSERVATION #3 July 3th,2019 Tom St.Pierre Inspectional Services Director City of Salem Inspectional Services Salem,Massachusetts 01970 Project: The Breakaway at Salem Common,94 Washington Square Re: Construction Observation Contractor: Thomas Berube Contracting Site contact: Mike Pydnowski Dear Tom, The following observations are based on a periotic site visits by Brigitte Fortin,AIA,of my staff. Observation: Mansion: • Underslab plumbing is underway. • 3rd floor interior brick is being cleaned to determine how much of it can be exposed. First and 2"d floor: • Rough plumbing is underway. • Miscellaneous interior framing underway. 3rd floor: Annex: • Exterior window well have been poured. • Lower level egress windows have been cut. • Elevator shaft construction is underway. • Framing of lower level and first floor bearing walls and units demising walls underway. Recommendations or Actions: 1-n/a Please do not hesitate to be in touch with this office should you have any further questions and or concerns. Respectfull Peter F.Pitman,Architect (1 ,• No.8749 Massachusetts Registration No. 8749 itivt:OSTON/ MA OF PITMAN & WARDLEy ii� cl �.ir� )' �'hurch Surd • tialrm. \I:\ • 978.744.S982 CONSTRUCTION OBSERVATION # 4 August 7th,2019 Tom St.Pierre Inspectional Services Director City of Salem Inspectional Services Salem,Massachusetts 01970 Project: The Breakaway at Salem Common,94 Washington Square Re: Construction Observation Contractor: Thomas Berube Contracting Site contact: Mike Pydnowski Dear Tom, The following observations are based on a periotic site visits by Brigitte Fortin,AIA,of my staff. Observation: Mansion: First and 2"d floor: • Rough plumbing is underway. • Miscellaneous interior framing underway. 3rd floor: • Loft is framed Annex: • Elevator shaft is completed • First and second floor framing is substantially completed • Exterior zip panel system is being installed.Joints were not rolled properly. Recommendations or Actions: 1-Rolled the zip panel tape as recommended per manufacturer. Please do not hesitate to be in touch with this office should you have any further questions and or concerns. Respectfully SED ARCyi na . i Z Peter F. Pitman,Architect No.8749 Massachusetts Registration No.8749 ‘448:TOloiA PITMAN & WARDLEy i .areS Architecture & Design 32 Church Street • Saletn. MA • 978 744 8982 CONSTRUCTION OBSERVATION#5 September 11,2019 Tom St.Pierre Inspectional Services Director City of Salem Inspectional Services Salem,Massachusetts 01970 Project: The Breakaway at Salem Common,94 Washington Square Re: Construction Observation Contractor: Thomas Berube Contracting Site contact: Mike Pydnowski Dear Tom, The following observations are based on a periotic site visits by Brigitte Fortin,AIA,of my staff. Observation: Mansion: • Interior framing is substantially completed • Window openings have been cut in brick wall • Exterior soffits and trim have been replaced.Existing crown molding and trim below soffit has been preserved and reinstalled. Annex: • Third floor and roof are being framed.Trim work is starting. • Stair#1 was framed improperly are 3rd floor creating a head room issue but was reframed per plans. • Interior framing is underway on first and 2nd floor. Recommendations or Actions: 1-n//a Please do not hesitate to be in touch with this office should you have any further questions and or concerns. Respectfully, rci F. Peter F.Pitman,Architect Massachusetts Registration No.8749 No.8749 kistaosroivi lam F. N\/T