Loading...
UTS Job 23418 Report 2 Asphalt Inspection Report 10-21-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-21-2019Asphalt Inspection Report Report No.2 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER: TIME: CONTACT: TEST METHOD:Field Nuclear Densometer OBSERVATIONS: The following are the results of the extraction and Marshall density tests performed on a Sample #103 of asphalt binder course placed at the above referenced project. SIEVE SIZE % PASSING JOB MIX 1" 100.0 100.0- 3/4" 98.6 80-100 1/2" 70.9 55-75 3/8" 48.3 No. 4 33.8 28-50 No. 8 24.4 20-38 No. 16 17.8 No. 30 13.0 8-22 No. 50 8.5 5-15 No. 100 4.8 No. 200 2.6 0-5 Asphalt Content - 5.1% Marshall Density - 149.8 PCF Asphalt Content JMF Range 4.5-5.5 Inspector Premium Travel Name Time Hours Time R. Granada No Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-21-2019Asphalt Inspection Report Report No.2 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates REVIEWED BY:William P. Crabtree Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque