UTS Job 23418 Report 66 Soil Inspection Report 10-10-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-10-2019Soil Inspection Report Report No.66 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Misty 52-54° TIME:7:00 AM CONTACT:Pat Madden of Fulcrum Associates PURPOSE:Observe earthwork construction and perform field density test EQUIPMENT:CAT 160H Grader, IR SD-122DX Single Drum Vibratory Roller TEST METHOD:Sand Cone Nuclear DensometerX TITLE:Inspector Staff Engineer Engineer Maximum Field Test Percent Dry Dry Percent Elevation No.Moisture Density Density Compaction Location (Feet) 1 8.6 129.2 127.5 98.7 See Sketch PB 2 9.3 129.2 125.6 97.2 See Sketch PB 3 9.8 129.2 126.9 98.2 See Sketch PB 4 10.2 129.2 124.8 96.5 See Sketch PB 5 9.9 129.2 127.3 98.5 See Sketch PB 6 9.1 129.2 124.0 96.0 See Sketch PB 7 10.6 129.2 125.9 97.4 See Sketch PB 8 10.0 129.2 126.4 97.8 See Sketch PB 9 9.5 129.2 127.6 98.8 See Sketch PB 10 9.7 129.2 128.9 99.7 See Sketch PB 11 9.4 129.2 123.6 95.6 See Sketch PB OBSERVATIONS: This report follows a site visit to observe/test the earthwork for pavement base. The writer observed the Flint Street entrance drive, building #2 parking lot, and the drive dividing building #1 and #2 was field density tested. Pit pipeline continues to place dense grade gravel (see sketch). Compaction was performed with a 13 ton vibratory roller and exhibited stable conditions. Soil description: Recycled material from offsite used as road base. A total of 11 field density tests were performed using the ASTM D6938 Nuclear Densometer method of testing. The earthwork observed/tested does conform to minimum requirements of 95% compaction. These observations/testing results were reported to Mr. Madden during this visit. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-10-2019Soil Inspection Report Report No.66 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Inspector Premium Travel Name Time Hours Time S. Jenner No Min Day 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-10-2019 Report No.66 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment