Loading...
UTS Job 23418 Report 67 Soil Inspection Report 10-07-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-07-2019Soil Inspection Report Report No.67 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Cloudy 50-60° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Footing trench excavation continued at the west side of the elevator pit (pet wash) of building 1. The trench was excavated to design elevation utilizing the Deere 450 excavator equipped with a flat cutting edge (flared teeth) to minimize sub grade disturbance. Ground improvements were previously completed in this area by installing GCC deep foundation elements. The elements were previously excavated to design cutoff elevation. The area was over excavated a minimum 6" below design BOF elevation to provide a cushion/base of material between the elements and the footing. All GCC elements were carefully located and exposed during excavation. The sub grade soil in this area is either urban fill containing wood, ash, brick, slag etc. or tannin bark. A 6 - 12" thick layer of ¾" crushed stone was placed and graded. The surface of the stone was compacted utilizing the heavy plate compactor exhibiting stable/firm conditions. De watering was performed as necessary. Some of the footing locations were lowered to accommodate plumbing/sanitary line penetrations. GCC elements were exposed and sawcut accordingly. The gravel structural fill over burden was stockpiled nearby for re use as backfill against the perimeter foundation. The material was placed in a single 12 - 16" thick lift and compacted utilizing the wacker plate compactor exhibiting stable/firm conditions. Installation of water utility services was initiated @ the west side of building 1. The tee's on the main were located and appropriate size piping and bends were installed to align with the sleeves in the wall. Installation of these utilities remained incomplete on this date. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-07-2019Soil Inspection Report Report No.67 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 10-07-2019 Report No.67 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment