UTS Job 23418 Report 71 Soil Inspection Report 10-11-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-11-2019Soil Inspection Report
Report No.71
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Overcast 50°
TIME:7:00 AM
CONTACT:Bob Levesque of Fulcrum Associates
PURPOSE:Observe earthwork construction
EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate
Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller
TEST METHOD:Sand Cone Nuclear Densometer
TITLE:Inspector Staff Engineer EngineerX
OBSERVATIONS:
This report follows a site visit to observe/test the earthwork for: Footing trench excavation.
Footing excavation continued within the limits of building 1 (interior footings Cl I@3&4). The
trench was excavated to design elevation utilizing the Deere 450 excavator equipped with a flat cutting
edge (flared teeth) to minimize sub grade disturbance. Ground improvements were previously completed in
this area by installing GCC deep foundation elements. The elements were previously excavated to design
cutoff elevation. The area was over excavated a minimum 6" below design BOF elevation to provide a
cushion/base of material between the elements and the footing. All GCC elements were carefully located
and exposed during excavation. The sub grade soil in this area is urban fill containing wood, ash,
brick, slag etc. A 6 - 12" thick layer of ¾" crushed stone was placed and graded. Mirafi filter fabric
was placed between the sub grade and crushed stone footing base material. The surface of the stone was
compacted utilizing the heavy plate compactor exhibiting stable/firm conditions.
Fine grading was performed for proposed pavement areas. Specifically, efforts focused on heavy
duty pavement (roadway) areas to increase the pavement cross section thickness. Base course material
was previously placed. The material used is 1.5" reprocessed material from the Caruso pit in Revere,
MA. Approximately 1" of material was cut utilizing the Deere grader. The surface was compacted
utilizing the IR 10 ton drum roller exhibiting stable/firm conditions.
The cover for CB 12 was replaced on this date. The structure was damaged shortly after
installation and was removed and replaced on this date.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-11-2019Soil Inspection Report
Report No.71
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
Inspector Premium Travel
Name Time Hours Time
M. Chace No 8.00 1 Hr(s)
REVIEWED BY:Chuck Fraser
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
DSF Flint Salem LLC Dimitri Kourtis
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-11-2019
Report No.71
Job Number 23418
Project Halstead Salem Station, 72 Flint Stree
Salem, MAAttachment
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-11-2019
Report No.71
Job Number 23418
Project Halstead Salem Station, 72 Flint Stree
Salem, MAAttachment