UTS Job 23418 Report 1 Asphalt Inspection Report 10-12-2019 (002)-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-12-2019Asphalt Inspection Report
Report No.1
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Rainy
TIME:6:30 AM
CONTACT:Pat Madden
TEST METHOD:Field X Nuclear Densometer
Field
Marshall Wet
Test Density Density Percent
No.(PCF)(PCF)Compaction Location
1 149.7 147.3 98.3 See Sketch
2 149.7 148.1 98.9 See Sketch
3 149.7 146.8 98.0 See Sketch
4 149.7 146.9 99.3 See Sketch
5 149.7 148.7 100.5 See Sketch
6 149.7 146.2 97.6 See Sketch
7 149.7 147.5 98.5 See Sketch
8 149.7 146.4 97.7 See Sketch
9 149.7 148.8 99.3 See Sketch
10 149.7 149.2 99.6 See Sketch
11 149.7 148.4 99.1 See Sketch
OBSERVATIONS:
Saturday premium rate.
This report follows a site visit to observe bituminous paving operations.
PAVING CONTRACTOR: BitCon
PAVING EQUIPMENT: PF4410 Paver, 5' Oscillating Drum Roller, CAT CB24B
ASPHALT SUPPLIER: Benevento
DO SUBGRADE BASE CONDITIONS APPEAR DRY, STABLE, COMPACT AND UNFROZEN: Yes. Subgrade was stable and
compact but wet due to overnight rain.
BITUMINOUS SPECIFIED COMPACTED
PAVEMENT MIX DESIGN THICKNESS THICKNESS TONS LOCATION
Binder Course State binder H 2" 2" 283 Parking lot road
State binder H 3" 3" Road
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-12-2019Asphalt Inspection Report
Report No.1
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
Bituminous mix temperatures monitored at time of placement varied between 290 and 305 degrees
Fahrenheit.
Inspector Premium Travel
Name Time Hours Time
Derek Hunter Yes 2 Max Days 1 Hr(s)
REVIEWED BY:
William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Fulcrum Associates Pat Madden
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
DSF Flint Salem LLC Dimitri Kourtis
Fulcrum Associates Bob Levesque
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-12-2019
Report No.1
Job Number 23418
Project Halstead Salem Station, 72 Flint Stree
Salem, MAAttachment