Loading...
75 NORTH STREET RECOMMENDED REVISED KIMBERLEY DRISCOLL MAYOR LYNN GOONIN DUNCAN, AICP DIRECTOR CITY OF SALEM, MASSACHUSETTS DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT 120 WASHINGTON STREET  SALEM, MASSACHUSETTS 01970 TEL: 978-745-9595  FAX: 978-740-0404 DRB Recommendation – 75 North Street Page 1 of 2 MEMORANDUM TO: Members of the Planning Board FROM: Paul Durand, Chairman, Design Review Board (DRB) SUBJECT: DRB Recommendation – 75 North Street REVISED DATE: October 19, 2006 CC: Lynn G. Duncan, Director, Dept. of Planning & Community Development At the Design Review Board meeting held on September 27, 2006, the Board unanimously voted to recommend approval of the project at 75 North Street as modified by the applicant in plans submitted to the DRB on September 15, 2006 and with conditions listed below. PROPOSAL The applicant appeared before the Design Review Board on August 22, 2006 to discuss the plans for an addition and renovation project at 75 North Street. The original submittal is on file in the Department of Planning and Community Development dated August 11, 2006. The DRB asked the applicant to provide the Board with the following modifications and samples prior to their meeting on September 27, 2006: • Additional shutters on the first floor windows at the front (east) elevation; • Modification of the windows from vinyl to a wood replacement window such as an Anderson 200 series window; • Removal of the awning at the Kitchen and Bath store; • “Creations” signage lettering changed to all caps; • Sample of the roof shingle; and • HVAC plans shown on the drawings that show that the equipment will be concealed from the street. The applicant made the changes and presented those to the DRB on September 27, 2006. The modified plans are on file in the Department of Planning and Community Development dated September 15, 2006. In the presentation to the board, the applicant stated that while they revised the drawings to show the Kitchen and Bath store without the awning, they would like to keep it up and felt that seeing as it is an existing feature, it should be allowed to remain. DRB Recommendation – 75 North Street Page 2 of 2 RECOMMENDATION At their meeting on September 27, 2006, the DRB recommended approval of the plans dated September 15, 2006 for the project at 75 North Street with the following conditions: 1. The first and second floor windows on the South Elevation have shutters that match the Front Elevation. 2. The windows in the roof peak of the South and North Elevations contain pediments and headers similar to the lower windows on the South Elevation. 3. The entry under the “Creations” sign should be recessed by 1-½ feet. 4. The gable ends on the dormers should stick out, slightly, and the trim should measure 5 ¼ x 8. The gable ends of the building should stick out by 8 inches or more 5. The DRB prefers that the awning at the Kitchen and Bath store be removed but understands that the owner is not under an obligation to do so. Please contact Tania Hartford, DRB staff liaison, at 978/745-9595 x311 or thartford@salem.com should you have any questions regarding this recommendation.