Loading...
1 VICTORY RD - BUILDING INSPECTION ` l 'f® c.r-- -7 Z-(o The Commonwealth of Massack �( I:a Board of Building Regulationsp �, n CITY OF Massachusetts State Building Code, 780 CMR SALEM 1Rctised.,War 2011 Building Permit Application To Construct, 16Pbi;,ERXaIA De0niolish a (ane-or Two-F7nriily Duvelhrlg "Phis Section For Official Use Ch11v 1 -Building Permit Number. Date pplied: If Building Official(Print Name) Signature Date- SECTION 1: SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 1 Victory Rd. 1.in Is this an accepted street? ves no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zonina Distriet Proposed Use Lot Area(sq It) Frontage(ft') 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Prorided Required Provided 1.6 Water Supply: (M.C.L c.40.§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Zone: Outside Flood Zone?Public 13 Private 11Zone: if ves❑ Municipal 13On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: David Richard Salem, MA 01970 Name(Print) ON,State,ZIP 1 Victory Rd. 978-224-2996 No.and Street Telephone Email Address SECTION 3: DESCRIPTION OF PROPOSED WORK (check all that apply) New Construction❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ 1 Alteration(s) ❑ Addition ❑ Demolition ❑ Accessoty Bldg. ❑ Number of Units Other 15(Specify: Solar Brief Description of Proposed Work`: Install 5.415 kw solar panels on roof.Will not exceed roof panel, but will add 6" to roof height. 19 panels total. SECTION 4: ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials) L Building $ 2,000 1. Building Permit Fee: $ Indicate how fee is determined: 2. Electrical $ 18,000 ❑ Standard City/Town Application Fee ❑Total Prgject Cost(Item 6)s multiplier x 3. Plumbing $ 2. Other Fees: $ 4. Mechanical (HVAC) $ List: 5. Mechanical (Fire $ Supgression Total All Fees: $ $ Check No. Cheek Amount; Cash Amown 6.Total Project Cost: 20,000 ❑Paid in Pull ❑ Outstanding Balance Due: 101 rn 1^I VW la Z I 1zta�C' 0 t_-4-e—Cr4-vrf SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 103631 8/30!17 Gregg LaCasse License Number Expiration Date Name of CSL Holder List CSL Type(see beloev) U 20 Patterson Brook Rd. Unit 1 No.and Street Tvpe Description W.Wareham, MA 02576 U Unrestricted(Buildings u to 35,000 cu.ft.) 12 Restricted t&.2 Family Dwelling Cih'i fowm.State,ZIP — M Maaonry . RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances (508)291-0007 bnttany.nuns@trinitysolarsystems.com I I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contr tr IC) 170355 10!12/17 Gregg LaCasse /Trinity Solar HIC Registration Number Espimtion Date HIC Company Name or HIC Repstrmrt Name 20 Patterson Brook Rd. Unit 1 brittany.nuns@trinitysolarsystems.com No.and Street Email address W.Wareham, MA 02576 (508)291-0007 Ci[v/rown,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L. c. 152. § 25C(6)) Workers Compensation Insurance affidavit trust be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ._........e No...........❑ SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Gregg LaCasse to act on my behalf,in all matters relative to work authorized by this building permit application. Please see attached letter. 9/30/16 Print Owner's Name(Electronic Signature) Date SECTION 7h: OWNER'OR AUTHORIZED AGENT DECLARATION By entering nay name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Gregg LaCasse A, � 9/30/16 Print Owner's or Authorized Agents Name(Electronic Signature) Date NOTES: I. An Owner who obtains a building permit to do his/her oFvn work, or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC) Program),will not have access to the arbitration program or guaranty fund under M-G.L.c. 14 2A, Other important information on the HIC Program can be found at rrow�+.nnussgov/oca Information on the Construction Supervisor License can be found at www mass.,ov/dns 2. When substantiat work is planned,provide the information below: 'royal floor area('sq, ft.) (Including garage. finished basemenUattics,decks or porch) Gross living area('sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of Imalf/batbs 'Tvpe of heatin,system Number of decks/porches Type of cooling system Enclosed Open 3. "total Project Square Footage'may be substituted for–total Project Cost" INSTALLATION OF NEW ROOF MOUNTED VICORY RD.& 5.415kW PV SYSTEM t' _ N ' 1 VICTORY RD, SALEM, MA 01970 °` sI \ I I I66N¢tlIR...... 4 VICINITY MAP SITE .SCALE NTS omlect Tlne:NLrnwnnN RICHARD,DAVID INNiIVIN.CTA,leIs 1111b) Pm'e6t AddrneS S VICTORY RD, SALCM,MA t119TU o SHEETINDEX d ,, e s s E : 6. L PV-1 COVER SHEET W1 SITE INFO&NOTES Dld.rm Tllw I RE5e.T I FEE ED s F- PV-2 ROOF PLAN W/MODULE LOCATIONS PreoFRISE 5.41%w mmN EINR_c_ o 1. 1BIT L 1A.NENBIB �' `E'N'T N"" PV-3 ELECTRICAL 3 LINE DIAGRAMELD SOLAR srsTeM UU.Isslell.IRE111FEE - R1 EENNOI1 I' D' GeV e C D E��NA 650 - IIII-TIN, ENE 17 - ILE p Id RE IOEBE, Fµ 600 P nCTA NEI P \ ��O/ l p 4 C CGU. lVIE A M (OITdOUII U INE I ® IATIIIV L -.E ppOlGN cPoSNTRACTLEVE STILL ANII'Llelm NN FF.F.,1 U.0 �` 1n eIF NAL—TIFFE'Ll IT, I, E p. GWPkWICIA ALL AN EWUN• n Or AT U ;ENA 1 SEE a E AA Tr ANR, AN IAARB AIL)FRIJIBIBILINA 'EN .R.E,cNEUI p EIll IA$' _ tl LA TION A. EA 9III ..REL 6r91 A64s 0 F E.. le. SUA'NOYA TFIENE ID ANE '�DODBIITLBI 11 6ROKI TIEFE PLAN T® SEPT s .x.F cy F UT U AND 0 Ile t eIIIEJ FIINE'v U II OPERATION0E. 0 U V -k EDEAR. - RCF No. SM1if� 11 LAID DF THE IN AbUVE115XFCFL(U'+OR ®p }� �� DIAD IREENI G 0 U -0 _.,E�T BAD_, E 0 � S ,. .N E \VE \:J P1 PV — 1 I11 E TIL U, 4L$ aAi wIN 6 ,EEN L AL LEND 1111111INA1 �+pINNATENT .NI, CEMCA 6 pJ . Jv ,wLEdih OR P NRINTILINE-- 5 M" 0 91 6 A� ut�wur W:.A J.CUTAI l EL': u. TEI'UTHIN 1x c SFe .UNIy_ -EUu it+En pr ,9T[. WFA nt.�u[, n[I E Jvc iCAt'A 9 U U..iNErvT v�� AL ' 1311 MmwW Rmf O]]-H]-NM wn.R..+RREr orn. L"I IIFEfITCE0U1PM=N1 AG E111£ NN11c,LIUW I. FTo ,o-Aa ell,nutE � ul M�oMl.e - iEc 'Al 9+PCInR 9 S CFL F001 cvc is C -UL NA NNACI ackr+ I IIFER TI I, Mt E X I .I 115.110EI� < i I N n9 5NAFINP NEkAE LIE LVE4AISTNLT 1!C 5' 0 > P G.SEAL Nf IEn YJI AR MOGUL E551W LNO1' S u e.1 an'IMAT5EIMaE-1 E¶ IN "EN .CA III XEIGHL e. 11 1TI P IIIIIIIIIIIIIII TjATTACHMo PDETAIL ICIUn_pgUUIE JiMEN9WK {]PVM"RULE ATTACI HMENT ON ASPHALT SHINGLE ROOF T1H CHT FROGROUND EVE TO REM OF ROOF ccnlE.nu ,.vtLJ3WE.NCI IJSGMIE laeueerawleiore LACK P 1 RI IT'Ill1 RICHARD DAVID II ILLI t� 5.156e2I I s R1 Tf � Preoq Aaemsa ------------- 1 LV ocU`']] 1 VICTaMARr ao. N �rwF iNY �F tl( �¢ �fidy4"d SALEM, Dl9)0 Id{f R !k > Imo•n..kE.:���s�;�u_LL.� ° �� uu p - oleaae r I'. M El S 4I5kW ala SDLAR"TOA CT O X I D n Inl I I �A� JLEPom Ik R2 ssm,o o-irolmalloR'. FRONTNOTLE y AmE SV uxpvs A uo RI,No FHN, ARROOFTOP SCIIEDULE INSTPL®NLEGEN ARRAYFWCILLNCo,f pENO BEYOND THE E%6TINGBUILpNGEN FELOPE ARRAY SCHCUULE SYMBOL LEGEND PLUMBING SCHEDULE LDUIIM NI SGHEDU E L ILII l[NTE-9 1 C, N IO IISMll:GUJa 4051 IfV In-al T M IE :XIIGO.I J T O OMn.US OIHEH O3STRUCTIONS TrbnitV O IT,,i .a. n IG.C.. J tt�tRl'Oa In6 Q [i.AIE..NEN tlINg6GONIx4I ® Re RVikkll INET;irvIEaIERIJf2 meTnuLn,ua,Je. alluLl.eoa ay an-w-ms OL IPM'sT uIIIIIR,rlle:c.EUE. wa x.. omu - m.mnR a I r. Englnaor/Lim so HOlEer Is�IDavmOrmcss/a/u wux e0A,IT. I,I"IN I 1011 .,FILL r&vR nlu11.111"El. 1 35, i YET ITT anx EA ,. 11 u1,Futl ry ITE o1 A 111 les.15151.'1"FOR P, ALL, — I 1 I I I I I I I I I IBeI,Ctl/Ro-visons' I IT 1 l IVIIGNeeii xa4nuroryiµrovunxxv Pu1bclTeixm<lcrz to 4n� Inollox IN a(mITALY c[wlm Ell x0u 5cunxc � RICHAR9,DAVID 2.) EST 11111111,F MbI'AT 11 MY.iFTUnf.1100ry Ibla9xal N EiI TIIIIEIII'PIE 111RE All RE I IT"Ill.AT 11 NCAPI 111 1, 1 Pra eq Atl4rOxs TER / 'IN 11 it P NIN TURN os vxm lbb[c IDs' M ",A". 1VIQOflY Rq III [TuxIII I REITUR TER ACEIII,L.—AN hill'11111'1 sV'os'Rea SIN 1 SAl[M�MA 019]D 11 1 1 Dravin iAla: 1.111 11"A 111,1111 All 1 M1 J �I PROPOSED 5415kW b'III 11111113 11a 1 V_TINN SOLAR SYSiRP 1 L" 1. SICIECIT rfytyQy NVF9P-_4R D 0@- (01malOx IT" 1.1 1.11 IFINIE I 111TERI 11 SIT 19 IT 1.11 D — „ r � � . ALL ��I--JI'll �p� - M1NIf [ f ---- 9e_J' - e ' e - E �O�]v BP 9 1 r0 a10 . GAL 111—5 H o ne u ..auan 10 losTau.a. xrm swxel1, 1 j / 111. axll,xn J ---- I,�TIa. =.uN F axle eI NAl `------ ' ,lEla T11T1D5�x,lxx NEE aaa a .>: EARN— SHp411LL UI1E n RAR'SECTEROTW Wx NII CDONIx/.r ' mx leaSI!IA'EGNEC TRALIN 11 raxs 11 nHluxonxcPWm III III!nllnuLx t,l Yix6G„XO1ROx5 A,2 rMM W,63/ LES,'Ill I.I W4 E[aro 01B11A,mlII x..0x.l`�A'zn 1-r[ a« n as Fp., qO SM1 I.0' 1 maaaa xE P1 PV - 3 °1an< 1r.P 1A,1, ;1.0 S To o< a s' v/NEExN 1 < s Is uo ss / �-Sf)LAR cueP"Fol"N'ElIANISYAlO nn,ml.om RmlaD-rao-xen wrt x..+..nr mnu Richard B. Gordon, P.E. P.O. Box 264•Farmville•VA 23901 Ph: 434.315.5759.E-mail: grichardpe@aol.com September 28, 2016 Salem Building Department Salem,MA Re: Solar Panels Roof Structural Framing Support To Whom It May Concern: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure, roof loading,and proposed site location of installation: 1. Existing roof framing: Conventional framing is 2x6 at 16"o.c.with 9'-6"span(horizontal rafter projection). This existing structure is definitely capable to support all of the loads that are indicated below for this photovoltaic project. 2. Roof Loading • 4.33 psf dead load(modules plus all mounting hardware) • 30 psf snow live load (50 psf ground snow live load reference) • 4.5 psf dead load roof materials • Exposure Category B, 105 mph wind uplift live load of 16.29 psf(wind resistance) 3. Address of proposed installation: Residence of David Richard, 1 Victory Rd.Salem, MA This installation design will be in general conformance to the manufacturer's specifications, and is in compliance with all applicable laws,codes,and ordinances,and specifically, International Residential Code/IRC 2009. The spacing and fastening of the mounting brackets is to have a maximum of 64" o.c. span between mounting brackets and secured using 5116" diameter corrosive resistant steel lag bolts. In order to evenly distribute the load across the roof rafters,there shall be a minimum of 2 mounting brackets per rafter&min.3" penetration of lag bolt per bracket,which is adequate to resist all 105 mph wind live loads including wind shear. Very truly yours, �i jf+pj, .`w ��jH OF MqB Sc S Richard 13. Gordon, P.E. 02 Sc Massachusetts P.E. License No.49993 RICHARD B.GORDON m MECHANICAL ENGINEERING p MECHANICAL CIVIL ENGINEERING ti 9993 N0..4 49993 ELECTRICAL ENGINEERING �aRFcis ER�'D Z SSS/ONAI ENGr_ Richard B. Gordon, P.E. P.O. Box 264•Farmville•VA 23901 Ph: 434.315.5759.E-mail: grichardpe@aol.com September 28,2016 Salem Building Department Salem, MA Re: Solar Panels Roof Structural Framing Support To Whom It May Concern: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure, roof loading, and proposed site location of installation: 1. Existing roof framing: Conventional framing is 2x6 at 16" o.c.with 9'-6"span (horizontal rafter projection). This existing structure is definitely capable to support all of the loads that are indicated below for this photovoltaic project. 2. Roof Loading • 4.33 psf dead load(modules plus all mounting hardware) • 30 psf snow live load (50 psf ground snow live load reference) • 4.5 psf dead load roof materials • Exposure Category B, 105 mph wind uplift live load of 16.29 psf(wind resistance) 3. Address of or000sed installation: Residence of David Richard, 1 Victory Rd.Salem, MA This installation design will be in general conformance to the manufacturer's specifications,and is in compliance with all applicable laws, codes,and ordinances,and specifically, International Residential Code/IRC 2009. The spacing and fastening of the mounting brackets is to have a maximum of 64"o.c.span between mounting brackets and secured using 5/16" diameter corrosive resistant steel lag bolts. In order to evenly distribute the load across the roof rafters,there shall be a minimum of 2 mounting brackets per rafter&min. 3" penetration of lag bolt per bracket,which is adequate to resist all 105 mph wind live loads including wind shear. Very truly yours, jj nq� N OF MASS, 2 G RICHARD Richard B. Gordon, P.E. g roaooN N Massachusetts P.E. License No.49993 OU MECHANICAL MECHANICAL ENGINEERING Nn 49993 CIVIL ENGINEERING �cISTEF� ELECTRICAL ENGINEERING �SSiNOA �G �---:. INSTALLATION OF NEW ROOF MOUNTED "'Cr°R"" 5.415kW PV SYSTEM 1 VICTORY RDS ' Z, . SALEM, MA 01970 = L .h^ II0. VICINITY MAP SITE ° L SCALE'NTS 'rvleci title:uesa'.wnoa RICHRRg OAVIO 1111il1411TI[OIE.li9111 Pre c^t Adl 1 VICSOR(nP, SALEM.MA U19I0 wPLo - = SHEET INDEX 1,11,11OTIITI.k LOWILAH1.1 Ill I THE T,a" - PV-1 COVER SHEET W!SITE INFO&NOTES o�a.:m ➢JY: HEIIIInE '.E E " PV-2 ROOF PLAN I MODULE LOCATIONS PRoI=oseo s.vskw FAHITll III Ill 111,111 TI ll,.I,E.11,Ellil'ilkil J L PF t 1 PV-3 ELECTRICAL 3 LINE DIAGRAM solAR sysrEa SJ1LJiLlNHOIIl11:HH,lil 1II.T011EL.lE56iF PE 11ki All L.AEH4 U :H OT TIE C 0 uS. 7f,---klonfe b OG O 9 60 HATHHE OLf COP uELIC1gA i.TEA FL LOOS .l 111111.11 ALL 11,= niH gnYu CnLLO]E AN 11.1 n.r 5 ETT Jlf. mn'. E t qh0 E HE FA's -NI FF.IELIOF en v TO—TVIEL—T LPIIE4eTHITTATILTIONITEETTO u cl!uf[l�l ` U bc4tF_ D O ES 9. L[.9YUT llHI. ii� c q O ESE" E t. ILL 1l U EO L O iAOJ1 1 ..FILE ni EY. c ix OEfS t I£nrtYVE. SUf.NPIP E OLU E CHE I6 EL u U 4PC/ I TIE wF O O '0*P L B l ETEATOO M E 0 IXtEHH Rc:.No. CaM1!a9t G O g M NI U 'rE I.ErIO FICIT Oa. q o uw e° ,u.nE O IT II,T TI EliTlIOTL qL dLETPf O EEk" 0 5 ql n K'TVt G .1",ATE"11-111THET1111. LCgi WN4C CVCIES IEA t L' S LU liki..Ii IHAI.i1riil I Jt11ANR.iLTE OlilllF. A El ICU S..0 IrML EO'J:nE. IR MLA: NVq n:..gf.E..OY.1 Ek TOq\A 1Efil-11i, 9]111 NMwpM�)]�JB MYµMn Nbry 01119 w. aX = .11N .A I,JIXaw..T,.n,PNILNI Iui9.TRVl IP - 1111-I.IOOLILE v ML`lI1LF GaNc IT 5 C2 NOa� OOP 4llAC RAIL c cn[ eg v 111/� r IO aur oX NAGR FASL f Ole I YEG ASPINLT SIIILICLES C r II Ill LVFOL—� aC01 SFO AN__ eW xsx WLSRMODIILES SINLLNOT S S m 4 e EA G 'R E.V'CEEo llh HEICII,. J .A sIECT FoA _ FErNL6: 1, RIOrMP.Yl.KW nATTACI IMEENTB CLIP JRAP- aPw.r�yuS mMcvuwrs nFV MODULE ATfACHME.YT ON ASPHPLT SHINGLE P1101' {�iIEIGHT FROM ORNND LEVEL TO?EPR OF RCOF L1 xF rn*.o.ca.L yJsriuE ral resc•LF leauetll Re'irsians DAI:K TiOe { RICHARD,DAVID L j�V'II[C • � I�4�y ! 4� I� i1lXR C 0 ��64d1 I F`, 2 �.ILProlonanams; ] 1VICTORY RD, t T F 4Y ECS y Lrt� K 1-`Q SALEM,MA M970 i PD p 'Ey l ,, ..€.L �L L� FSn ` DIAM nue: M dPROPOSED5.a15kW T-h e k SOLAR SYSTEM CI Um ' ml9rmal on Tare R2 1 I HI meYon'. nv 11.1.11P.1111 T�1-11 FROM 1s uTl—IN CI.<EnNP. SUugCVA au - x. Rcu,llo. 9Ncpi E)a1 ROOFTOP SCI INSTALIATION ONLY PV ARRAY WILL NOT EXTEMD BEYOND THE EXISTING BUILDING ENVELOPE ♦..I rte" _ r� ARRAY SCHEDULE AYNBOL LEC AO PLUMUILIC SCLIEDULE EOUIPMCN I SCHEDULE oPNOPEN YI'VI✓NN LN E. L oxNE.i Io5[ _asf-M-E3599o59.951 G - stsUKNN LLIT11-al1POINNVAIE 4 0 1,1E F OMEN 05STRUCTIONS Ep1 11 `, 'N ll0 1ETtli TIN BEI,:"", OLi,...,E.«Els raN+ClccoN.,_cr - - Rlcrs wUlll ARn+.b R�I677-nl-xa)a -- .rmm ag.Earr Englneorl Limnsv HUltivu Isu�n s CIA l sOlul.vO�r1[nvfxq�OINI[ A D,AM IRA ED",'I'D / II I7 UX AIR R,RO AI A aTtlla T -- F — , A 1 I I I I I I IsauetlIRevisions I I I I 1 rr4. YIGIJ r,m nxNN'C1nCUrtWIgINUNO!!5 I �IU)vv TlllB:il CN 13 CLRiE6FQfARL91-RAIM¢AIRENAarvA9INV wnsuanan lrvRCIA. PAID. AIDDDIA E}¢<unrva RICHARD,DAVID x1ID.11lem[am[Xi.ORNtiEMvrN.iU0.E SAsfooN imrvinaCCl a:IDro-lse<a: IA PLAN.A1LIL`CAT L`CATMN Pla elA Ntltlms'a rer a IN T,r^ -/'M m ¢ li ILL CREPE I m 4gcemm M n11- , 1 Oil AAAL L AID RE LI MON TO ILL PRY PAT US WEPIR I.,lllGea I1 VICTORY RD, cE r__ SAl[M,MADl9)0 If [ 14LG SL Dlav:iN Tilla: 1 r.. PR(IPOSED SA15k4Y n AT I.'111 ROD Ill'All C 111 A Al RAIR 11 ARTA o senmlVsfNouvrv'- .Uua aN SOLAR SYSTEW L.1 C4J 4 U. ; 1. m .IarfaCAL _P.IEa 11 ANDIVIRCIAll I I.P.111.1111 11-.[1111MITTIL, CAN.L.ED n T JD n r-1I ( mEnf ! rvAueo uro , 1 a _ J '�L �• f m., g g _ _ E -- 1A 1! ao JN EFNDN LnEI r oae:...1 rvJ alIll:�a 1 n<I14 �a.N«II'LAIfni:w �`TT,aB —I ------' INLICOMIL All, A"'TV ON fTglNknns = II.ICAl 'A rvKsaa.w NTCERE,11AT 111HE11" O`NnlsllClEF4lN nlcOnOPlnk..IN VPPlNTCdflNYING R 11CLATTE _I A"" CONOUVas In.EE IXEI µcucsos101Ul 1141'[ 1aisn v C vk I' OrvL W R.v.Nv. $HIRCI Iuaoa POCIPL L4 L, P1 PV — 3 �T: 1 Ir31-1 T111111111CRED 1. la,I �af MAI ROT PROTECTION ISVPu4 nIl/Ym,pW poNe11-ID)-Hla Snap rack-, Solar Mounting Solutions Series 100 Residential Roof Mount System The SnapNrack Series 100 UL Roof Mount System is an efficient, visualiy appeaiing, photovoltaic (PV) module installation system. Series 100 UL is listed to the UL 2703 for grounding/bonding and fire classification. The System's components provide an adequate bonding path which has eliminated the need for grounding lugs and wash- ers at each module, and bonding jumpers between splices. In addition to grounding and bonding, the roof mount system, Series 100 UL, is Class A Fire Rated when in- stalled with Type i and Type Il Modules. SnapNrack's UL 2703 Certification and Com- pliance ensures that SnapNrack installers can continue to provide the best in class installations in quality, safety and efficiency. • Appealing design with built-in aesthetics • No grounding lugs required for modules • All bonding hardware is fully integrated into �w the components t n • Rail splices bond rails together, no rail jump- - ,e ' ers required n • Proprietary SnapNrack grounding lug snaps in the rail channel • No drilling of rail or reaching for other tools : required • Class A Fire Rating for Type 1 and 2 modules System Features Include Snap in single Tool Easy No Cutting Hardware Installation Leveling or Drilling U� Integrated Wire Preassembled Integrated bonding UL 2703 Certified Management hardware Resources snapnrack.com/resources Design con flgure.snapnrack,coin Where to Buy snapnrackcom/buy Snap rack- Solar Mounting Solutions 6 It rth � � st9i Sr' 1 I 'Ltl i111J -+V Pack_t Le¢I Rwl t ♦ :.m. S t YI.;Alit $pf f -'R L Ll pM k3.¢)ng napN ack � nl ..rtl S GM1 Y gpl s Or'd A BOnoufq M t f• \, B}dm'ncs 1 4WI _ .1 PN ck r ,✓ �t I I.5 Iv I PILI Clhrp B..dI "S iSt' 1 Nmtl:rare 'rh. nu ITTuq SpllC{eck'NasM1ers opnY LOCI SnapNrack Bonding SrApNtnek Bonding SnapNraek Bonding Adjustable End Clamp Mid Clamp Randard Rall splice "+aeNrarl. J ,ruiitl l.�g 13-o YW�i-� Lopper Ville SnapNraek Ground Lug Assembly (ONE REQUIRED PER ROW OF s- MODULES) k nepamcBondlny Uoiw_rsol ErKve tl'Is",P U )Wa '_. rl1E<PUII Str'np i LUEC W-dyle Sta I _. zt=J Bole ':'nth FIS>V TLA i�v SnapNrack Bonding Universal End Clamp 5napMWk Ssmdmg stando f Clomp Assamwv aaaprm k-•� Ss,,vd smmla,,T,- � —snapNracK apMrzck 13onainu pvbbet Real Flmge Nunndm9 hannel P`o2 Rain Cd4ir - "annoi - lois" Scrrattd sYand�c FlwStaelFlengs BattpN sk Dagree Flangz MITI Flndh L Foot eon Standoff manna k U IFOLjrprs pose Min Fnrsh� LF t S endOlf BnSe(LNW S+aPNrack 5 sR Ease shown) SnapN:.ck-� LFoot 6., l aAOOF MIII F+sF rle�M1+g Ba a> mbl'p l Foe'.Rxe SnapNrack Bonding J Snap Bonding SnapNrack Metal Standoff ASSambly L Foot Base with Flashing Roof Baso with Bonding L Foot SERIES 00 TECHNICAL DATA • 6000 Series aluminum Materials • Stainless steel • Galvanized steel and aluminum flashing • Clear and black anodized aluminum Material Finish • All finish on select componeras • Listed to UL Standard 2703 for Grounding/Bonding and Fire Classification Calcs.&Certifications • Class A Fire Rating Type 1 and Type 2 modules • Stamped Structural Engineering Reports for all 50 States • Grounding SnapNrack Grounding Lug (One lug per individual rove of modules) • Irtegrated bonding components Warranty 10 year limited product warranty; 5 year limited finish warranty 877-732-2860 www.snapnrack.com contacttq,snapnrack.com f 6n hJnIIn.: I .i_ fir All ,f ., r r,_ SNAPNRACK SERIES 100 ON FLASHED L-FEET REVISION• FLASHED L-FEET ARE OPTIMIZED FOR QUICK AND ROBUST INSTALLATION ON STANDARD COMPOSITION SHINGLE ROOF SURFACES FOR OTHER ROOF TYPES STANDOFFS ARE RECOMMENDED I' ITnTTT7LTLlLCL[1?Q:G • SNAPNRACK STANDARD RAIL 1 ROOF RAFTER TYP(ROOF ATTACHMENTS SHOULD ALWAYS BE EMBEDDED INTO ROOF RAFTERS OR STRUCTURAL MEMBERS SUCH AS STEEL PURLINSCI ROOF SHEATHING,UNDERLAYM ENT, AND ROOFING MATERIAL® TTITITTTIF.C➢�al I[R§(T Tl i (� i MAINSTREAM ENERGY CORP DESIGNER: GMcPheeia* SCALE: ® PARTNUMBER: DESCRIPTIGN REd �1 ��1���pl��L- ' �_.-=—=w -. "' CKA�ER. ORr 5100001 SERIES 100 OVERVIEW ON FLASHED Io91L'SAVU' iMrj ., ..e...e.,.., .,. . APPROVED 9Y: OA1E' ® L-FEET F REVISION: SNAPNRACK MODULE ATTACHMENT HARDWARE SNAPNRACK c+' STANDARD RAIL `a ROOF SHEATHING,UNDERLAYMENT, AND ROOFING MATERIAL® ROOF RAFFER TYP(ROOF ATTACHMENTS SHOULD ALWAYS BE EMBEDDED INTO ROOF RAFTERS OR STRUCTURAL MEMBERS SUCH AS STEEL PURLINS yEEL=Ijff f ❑IIIl� MAINSTREAM ENERGY CORP, OESIGNER: OWPMelmn SCALE: PARTNUMBER. DESCRIPTION: Pcv ,'lSltls� DRAFTER: onya� ® 8100002 SERIES 100 OVERVIEW.ON STANDOFFS F 4w be^Ufult,4 i3'dl;StluW` �r.�"�.�x:a„r.,av:�e�tr:::•. APPROVED BY: DATE: SNAPNRACK SERIES 100 RACKING SYSTEM TYPICAL ROOF LAYOUT REVISION NOTES: -STANDARD LAG BOLT SPEC ASSUMES 5/16"LAG BOLTS WITH 2.5" EMBEDMENT W ROOF STRUCTURAL MEMBERS/RAFTERS -TORQUE ALL A"HARDWARE TO THE FOLLOWING: ROOF RAFTERS OR -SILVER S.S. 10-16 FT-LBS STRUCTURAL MEMBERS -BLACK 5.5. 7-9 FT-LBS RAIL CAN MOUNT TO EITHER SIDE OF POST(UPSLOPE ILI DOWNSLOPE) -FOR UNEVEN ROOF SURFACES, USE 'SNAPNRACK MODULE UP TO TWO LEVELING SPACERS PER L MID CLAMPS MODULE OVERHANG FOOT OR STANDOFF,SEE DRAWING ��.� (NOT TO EXCEED 300 "STANDARD RAIL LEVELING"FOR OR MANUFACTURER'S DETAILS AND LIMITATIONS �\ RECOMMENDATIONS) 1 I MODULE OVERHANG STANDOFFS ARE BOLTED INTO ROOF RAFTERS OR STRUCTURAL MEMBER "IMLSPAN" DISTANCE BETWEEN ROOF ATTACHMENTS "RAIL END OVERHANG"(NOT TO O(CEED- 34%OF ACCEPTABLE RAIL SPAN) .� MNNSTREAM ENERGY CORP. DESIGNER: IWPM.. SCALE. DNS PART NUMHER' DESCRIPTION REV �If� L,fip J�.y�nl.��. '° a"•-""_-"^ "" DRAFTER. DRORn S100 D05 SERIES 100 TYPICALIAYOUT F PA6?%D%9 a1�W —+. APPROVED BY DATE'. 120113 -IX SNAPNRACK -2X SNAPNRACK LEVELING PEYI�10..% USE CARE DURING LEVELING SPACER SPACER INSTALLATION TO ENSURE AJ THAT THE SET SCREW IS - 1X "-18 X 1"LONG - 2X "-18 X 1"LONG ROUGHLY CENTERED BETWEEN R THE TWO PIECES BEING LIDINED SETSCREW SET SCREWEI n T ❑ , - STANDARD SERIES 1CO _ i-- ATTACHVIE14TS FEATURE 3"OF VERTICAL ADMSTABILTTY ON ALL MCUNTING POIPJTS WITH _ IIMF USE OF 1"LEVELING OfdLE SPACERS I� C� THE FIRST INCH OF ADEDSTABII_ITY IS ACCOMPLISHED WI]-H SLIDING DETAIL A FEATURES BUILT INTO BOTH L SCALE 5:8 FOOT AND STANDOFF CLAMP COMPONENTS I RAIL.HEIGHT CODS" =RAIL HEIGHT�.S' -_ RAIL HEIGHT®,5" RAIL 01 HEIGHT 0.5" FOR AN ADDITIONAL INCI'I OF ABOVE ROOF SURFACE r,ABOVE ROOF SURFACE ABOVE ROOF SURFACE ABOVE ROOF SURFACE HEIGHT ADS=NSTMENT,ADD 7"STANDOFF 7"STANDOFF 7"STANDOFF 7"STANDOFF ONE LEVELING SPACER. USE e PLUS ONE SPACERt PLUS TWO SPACERS OF SINGLE LEVELING SPACER ON TOP OF STANDOFF ON TOP OF STANDOFF NOT TO EXCEED 300 OF HTTACHMENT POINTS ON L-FEET OR 10" STANDOFFS. P I FOR A SECOND ADDITIONAL I INCH OF HEIGHT N _ ADUIISTMENT,ADD ANOTHER VFVEUNG SPACER, USE OF TWO LEVELING SFACERS NOT TO EXCEED 100 OF CIM 1 Dilll # - ATTACHMENT POINTS ON L-FEET OR 10`STANDOFFS. rt RAIL HEIGHT CB.Q `RAIL HEIGHT mQ -. RAIL HEIGHT IS.L7 RAIL HEIGHT 65.Q .i ABOVE ROOF SURFACE `_ABOVE ROOF SURFACE ABOVE ROOF SURFACE :: ABOVE ROOF SURFACE ONE L FOOT ONE L FOOT , ONE L FOOT " ONE L FOOT F PLUS ONE SPACER " PLUS TWO SPACERS UNDER L FOOT UNDER L FOOT WINS IREAM ETERG PORP DEGIGNCR 0WPheei¢s SCA_f m PART NUMPER DE3CRiPTION R6V DRAFTER DRr�" DAiE 6100 DOS SERIES 100 RAIL LEVELING F kPVI51GN USE TILT KIT OPTION FOR INSTALLATIONS �\ THAT REQUIRE MODUI ES TO BE TILTED ABOVE THE EXISTING ROOF SLOPE SYSTEM SHOWN IS DESIGNED FOR TILT ANGLES FROM 30 TO C5 DEGREES ABOVE ROOF SURFACE \.. USE OF ANTI-SEIZE ON TILT HARDWARE I5 RECOMMENDED(PARTICULARLY FOR MAX LENGTH: ED" ` STAINLESS TO STAINLESS HARDWARE) WITH STANDARD i ENGINEERING REFER TO 5100 TKT SERIES 170 TILT KIT TOOL FOR A SIMPLE TOOL THAT DRAMATICALLY SIMPLIFIES TILT KIT INSTALLATION BY — SNAPNRACK SUPPORTING THE UPPER RAIL AHEAD OF 1 RAIL STANDARD MODULE INSTALLATION SNAPNRACK MID CLAMP ASSEMBLY CUT REAR TILT LEG FROM SCRAP \\ OF STANDARD RAIL SNAPNRACK CHANNEL NUTS, '' ap t TORQUE TO 10-16 FFARS WHEN SNAPPIRACK L.-FOOT USING WEEKS.WHEN USING ALL-PURPOSE OP. SNAPNRACK BONDING CHANNEL L-FOOT COMPOSITION NOTES: NUTS,TORQUE TO 14-16 IFT-LBS, WEEKS ARE NOT REQUIRED WITH , -TORQUE HARDWARE TO THE FOLLOWING UNLESS OTHERWISE NOTED: BONDING CHANNEL NUTS. -SILVER S.S. 10-16 FT-LBS - BLACK S.S. 7-9 FT-LBS - REFER TO ENGINEERING CHARTS FOR RAIL SPAN 13ASED ON MODULE TILT s.. . ANGLE,WIND SPEED,AND SNOW LOAD 4, r< S LIT OCC S.S. ERCT - BACK SUPPORT"LEG"IS FABRICATED FROM A SCRAP OF RAIL. CALCULATE WITH SPLIT LOCK WASHER REQUIRED TILT LEG LENGTH. USE WEER GROUNDING WASHERS AT DDINTS BETWEEN L-FEET AND SNAPNRACK STANDARD RAIL SCRAP PIECE -FOR LOWER TILT APPLICATIONS SEE"SERIES 100 TILT KIT 0-15 DEG' -SNAPNRACK RAIL COVER CAN BE USED TO COVER CHANNEL IN REAR TILT LEG �C NAIN TREAM ENERGY CORP DESIGNER GMCPheetcv SCALE DNS PART NUMBER DESCRIPTION RFV r)I;� � �{\� � "' `• ORAFr=R D Ryer• 5100 D70 SERIES 100 TILT KITS 70-45 DEG WITH L ¢T:'2c- �n*7a wm APPPGVED BY t.At E 120113 FOOT MOUnIT F Uh USE TILT KIT OPTION FOR INSTALLATIONS THAT REQUIRE MODULES TO BE TILTED ABOVE THE EXISTING ROOF SLOPE it \, SYSTEM SHOWN IS DESIGNED FOR TILT ANGLES FROM 10 TO LL DEGREES ABOVE ROOF SURFACE ON STANDING MAX LENGIIi: CN" SEAM METAL ROOFS WITH STANDARD SNAPNRACK USE OF ANTI-SEIZE ON TILT HARDWARE ENGINEERING ' RAIL STANDARD RECOMMENDED(PARTICULARLY FOR S STAINLESS TO STAINLESS HARDWARE) REFER TO 5100 TKT SERIES 170 TILT KIT TOOL x FOR A SIMPLE TOOL THAT DRAMATICALLY " SIMPLIFIES TILT KIT INSTALLATION BY SNAPNRACK CHANNEL NUTS, I SNAPNRACK SUPPORTING THE UPPER RAIL AHEAD OF TORQUE TO 10-16 FT-LBS WHEN ' CHANNEL NUT MODULE INSTALLATION USING WEEDS.WHEN USING ' SNAPNRACK BONDING CHANNEL ? "X I" (OR 1.25")S-S. BOLTS NUTS,TORQUE TO 14-16 FT-LBS, . WITH SPLIT LOCK WASHERS WEEBS ARE NOT REQUIRED WITH •`� BONDING CHANNEL NUTS. •' CUI REAR TILT LEG FROM SCRAP OF STANDARD RAIL NOTES: \ SNAPNRACK SEAM CLAMP \\ s SNAPNRACK -TORQUE- "HARDWARE TO THE �, MID CLAMP ASSEMBLY WIDE OR STANDARD BASE FOLLOWING UNLESS OTHERWISE ` NOTED: -SILVER S.S. 10-16 FT-LBS - - BLACK S.S. 7-9 FT-LBS - REFER TO ENGINEERING CHARTS FOR RAIL SPAN BASED ON MODULE FLANGE NUT \ TILT ANGLE,WIND SPEED,AND SNOW LOAD L �'� SNAPNRACK L FOOT ALL-PURPOSE - BACK SUPPORT"LEG"IS OR L FOOT COMPOSITION FABRICATED FROM A SCRAP OF X 1"S.S. BOLT RAIL. CALCULATE REQUIRED TILT — . WITH SPLIT LOCK WASHER LEG LENGTH. CUT RAIL AND DRILL TWO{"HOLES AS SHOWN SNAPNRACK SEAM CLAMP - FOR LOWER.TILT APPLICATIONS WIDE OR STANDARD BASE SEE"SERIES 100 TILT KIT 0-15 ' DEG" X L" (OR 1.25")S.S. BOLT -SNAPNRACK RAIL COVER CAN BE WITH SPLIT LOCK WASHER USED TO COVER CHANNEL IN REAR TILT LEG 11111TREPM ENEV- LESIGIVFIR 0McPtiot.s J-AE PART NUTARER DESCMPTIDd REV "� DMS y �,C 5'• SERIES 100 TILT KITS 10-45 DEG SEh4A ;t'1,L�rrcQG � _ ��,�IEh L�R,a- S,00D1, z t Thr 7°�rpPxm:a - • APPROVED ev DAIF 120113 C,AIJIP MOUNT F NOTES: REVISION. -5/16" LAG BOLTS MUST EMBED 2.S'INTO ROOF STRUCTURAL MEMBERS/RAFTERS STEP 3: PLACE L FOOT -TORQUE ALL 5/16"HARDWARE TO ON TOP OF FLASHING SNAPNRACK THE FOLLOWING: AND TIGHTEN NUT COMPOSITION L FOOT -SILVER S.S. 10-16 FT-LBS CAN BE MOUNTED IN -BLACK S.S. 7-9 FT-LBS - STEP 2: SLID FLASHING OVER ANY ORIENTATION ,S.S. FLANGE NUT -RAILS CAN MOUNT TO EITHER SIDE L FOOT BASE AND UNDER ROW 5X i"(OR 1.25") OF L FOOT(UPSLOPE VS DOWNSLOPE) iE OF SHINGLES ABOVE SNAPNRACK S.S. BOLT AND CHANNEL NUT SPLIT WASHER t IrAI r S.S. LAG SCREW .!`J WITH FLAT WASHER SNAPMRACK. 2.5"MINIMUM EMBEDMENT STANDARD RAIL ' IS STANDARD I SNAPNRACK COMPOSITION ROOF FLASHING STEP 1: BOLT L FOOT BASE TO ROOF WITH ;. LAG BOLT SNAPNRACK I_FOOT BASE ROOF DECKING TYP. \ ROOF DECKING TYP. • ' FLASHED L FOOT MOUNTING POINT FOR USE ON COMPOSITION ROOF SURFACES WITH LOW TO MODERATE TILT RAILS CAN BE LEVELED UP TO 3"USING t UP TO TWO LEVELING SPACERS AS SHOWN IN"SERIES 100 RAIL LEVELING" COMPLETED INSTALLATION RAFTER NP. NIANMEAM ENERGY CORP DESIGNER: 0MWI,el.,9 SCALE PART NUMBER: DESCRIPTION REV D R DNS PEN DETAIL 01,FLASHED L FOO I TO C I" '+ uRa=fER >'an DATE. 5100 PEN D01 F RAFTER r PvozoweLLtt>(i1 }."f>f�fBdCd .-.. -. --' APPROVED BY: 120113 CAMMING SEAM CLAMPS ARE REVISION 5PECIFIED WITH A BLACK OXIDE STAINLESS STEEL BOLT. IT IS IMPORTANT TO USE THE PROVIDED BOLT AND TO TIGHTEN TO 16 FT-LBS FOR FULL LOAD CAPABILITY CLAMP CAN BE USED TO SECURE RAILS OR DIRECTLY SUPPORT SOLAR MODULES TO DETERMINE BOLT SIZE ADD WITH MODULE CLAMPS S.17"TO THE"STACK"ON TOP OF THE CLAMP(X)AND ROUND L FOOT OR SIMILAR TILL" UP TO NEARESTBOLT SI2E BRACKETS CAN BE ATTACHED TO THE TOP OF THE CLAMP AND PROVIDE A MOUNTING POINT FOR RAILS OR OTHER 3: BOLT IS STRUCTURAL MEMBERS TIGHTENED, SECURING CLAMP AND L 0 TORQUE BOLT t FOOT AT THE TO 10-16 FT-LBS SAME TIME X SEAM CLAMP BASE _ 1 (STD BASE SHOWN t BUT INSTALLATION OF WIDE BASE IS SEAM - 9 IDENTICAL) ' CLAMP "' CAM 2: OPEN CLAMP GETS 1: INSTALLATION STTARTS SEAM LOWERED .5 TMP' WITH CLAMP IN CLAMP ONTO SEAM OPEN POSMON THREAD WITH BOLT LOOSE INSERT 1 2 3 ❑ AAAINSTREAM ENERGY CORP. DESIGNER. GWPIWelm SCALE. DNS PARI NUMBER: DESCRIPTION' HEV DHAFER 0RYaU DATE, S100 PEN Doo PEN DETAIL 04,SEAM CLAMP F' N:')SiAYLTf✓]I$i?/O�A6Blw^^- =::,%..,'y[:'? ^;E[ w::"x;:: APPROVED BY: 120113 r. qro 4; t,. +?d tt solar - SolarEdge Single Phase Inverters For North American£ SE3000A US ! SE3300A-US! SE5000A-US,` SE6000A-US SE7660A-US 1 SE10000A-US l SE11400A.-US ' a< *w r <c 7 a w is `.. `§t i Y n f { ti h r . y+ % Ail1 F 4 • M .. rr + �� � ! j The best choice for SolarEdge enabled systems Integrated arc fault protection(Type 1)For NEC 2011 690.11 compliance - Superior efficiency(98%) - Small,lightweight and easy to install on provided bracket — Built-in module-level monitoring — Internet connection through Ethernet or Wireless — Outdoor and indoor installation — Fixed voltage inverter, DC/AC conversion only - Pre-assembled Safety Switch for faster installation — Optional—revenue grade data,.ANSI C12.1 1!i`'ggl ;, l+[PI I I IT 1,Q; so I a r ' o Single Phase Inverters for North America °� .S'E^,LCCA-I, z.[ 3SOA1;S' Stia7C0a1_'5 SE5�P?1";1,-;;5 . 3FIli;01l A.-I,S S 1100A 'q SE9000A-U5 5FM"nA-U5 SESOOOA-US SEGi SE7600A-US_SjI-M -us SEAL400A•US OUTPUT �bmu,nl 1.b :r putpul x100 s°Un S«011 P1+,0 1900001I-) 108V lll �-�.ip., L1T00 'ep _ J�i_�,L Ule. lJ..[p'uL_ __,1,bJtl �lii oGOO 2i$(1 1/00.`r l4 SO :I,Ynb Lll,tt a,9J{ '.0,T,tpal'rmi G;;e Nli.t.-Ncrti. Nl.ix. J O u tpu r 1111 1C, ,b11", NuIII.Ma,. l l't• 240 2(,.1 tear v R^q huin.Poco, Mi.^.x.' 59 s v.6 GO S lw dt HI count EO 6:25! Mz AAas.CJ It ian 6n q>r[Ci.,rtoni 12y 19 >i,n'U9'.' 2S 32 43 0201 . ],I."A]d011 h)u 24UV 6FC Rveahold L A Utlllty Monrcorinr_Iganding Prot,,on,Lo untrro Co offer.[able Ihr�sho!ds Yrs Ye, INPUT ._: N1arinxlm UC P"',ry(STr_j -1UW SLIIO (i750 8'01) 10"SO 155()0 153:0 +M1, TtansfOrnl if ss,Ungrounded Mu, mpur Voltdgo sun Vd, Nam.GC lnpur VGlmge i"j,(f,2ORV/350 fa 240V Vdc NW, nhot Cu,rent" 9.5 L3 u.-M—'a 208�J LR 23 33 iv 208V 345 1[Ir .. .'s.S CD 24uV .. . .. .. 30.5,C)2404 Nla1 cope t 1h.,4 E:rcuit(Ar,rent 45 Ad P.eae¢e-PolaripPrptecfipn - - � � y� G rounJ Fwlt rola tion DeL[tion - GOOk,1 Senvnvlh) Mnrtimv n erre[Efti ienq 97 7 98.2 93.3 9e.3 OH 93 98 % OdY 2 C tL bYelgh,bt : uencv 9: •� ) 0SVS 78 97.5 .5 9/.S .. I )S A 240V - 9' 4.220+/ P1rphTm Pw -r Consum Jtiorr <<.5 <4 IN ADDITIONAL FEATURES Supparte 1 ConinunIICadi n IPterfaircs E,5485,k52-12.f.h ai neh Z Nrc(ppouru,l) 'revenue i,rade Data.AN 51::1)1 OpliOna P' Fapid�>hutdtwn—NEC:2014 390.:2 FuncTonal N ,aided ul i i atallec]' I STANDARD COMPLIANCE - UL'LS)„CSA 22,2 ._7. r.t id Conner fipr Sta ndarrls EF S'1 Emmons a Fr p t15 C:die 3 INSTALLATION SPECIFICATIONS _ AC ou h;nt Nadu zine. l tC r nge W-1'n corn[ n 16-6A, /4'nrnimum 8 34A 13C innuC mint 1ze1, l.fS,I1e5p - 31mimmun 12�-cring>/ \JJ6[ante dt f rmnun un 1-]41rngS' to 6 t+VJG 14 6F1^,G .. r inensvt .wrf Sa Fety San¢h 30.Ss11 ,,, (MeWSDJ I 30Sxt2tix J.2j/%Se.15. ISd ii5 Li0 ]J5x•15xrpm bright'e Ut>afery Synch i 51.212'.2. }'/29 � Ib/6p . .. ..7 3x4/42,1. Na«nal tmwo'cm oo'•ing Nar,imCmwochon mnYmremal Fans{v.ar apiaceable) Gtr Iuspr ! _ replareablel, . No <ZS <5U dBA 6141,A-Ier.O ”ne Tengr2ratere .. - ._ •_ F.anWe Nero—L40/ t,,X60 P40 to,60 iac avadanle`I 'i,"f "It"h"I Rni,m.. pjI"M It .. _ yz. testi , e. .., .•i ._rte. ,._. i ��.� 4R� "�.a ��+�� s3T5i �� . Hp aqr Ma, �µ a2.•. V P.'. vw =01)), EC � KY'c4'4 y dJ Y A�• a dsMn. n e �81 # g y 1 6 tb vY i4" r,V- ,¢,W d �� ^_ « 7 , y.«, o-. .a A.* t.>z m..Mv a +"fQ F,a Mensa.r,•a... .. w+o- wa,.,< .. solarYd SolarEd a Power Optimizer �xFs" x Module Add-On For North America P300 i P400 / P405 Co °yam r p � r Y A.:• .."µr ♦� •1 }, IIIA rx. e f .Arh N fi ,. s CD �r A A�, myf, ; W..f9 a 4 � r dr t PV power optimization at the module-level Up to 25%more energy Superior efficiency(99.5%) Mitigates all types of module mismatch losses,from manufacturing tolerance to partial shading Flexible system design for maximum space utilization Fast installation with a single bolt Next generation maintenance with module-level monitoring Module-level voltage shutdown for installer and firefighter safety ,hp rr'.nnr. 31` -h i4Cf .1,.'T.l CIi"J ° SSAFA. Au5'fi.n�,ry w 311 Sola t�o'.LS solar T o o SolarEdge Power Optimizer Module Add-On for North America P300 ( P400 ( P405 P300 P400 P405 _ ,_ (tor bPall modules) trorl2.&96 cell mpd,,e,) _Itorthin flim medulesJ - �� INPUT _ Rated Input OC Puwer`i 300 400 405 UV At lute Maximum oputwolGe 49 80 125 Vdr. (vo-at lowest telnperacuie) MPPT Ooewtng Ranwe 8 48 8 80 .LLS LOS Vdc Maximum Snort i cult Current(ISC1 t0 Ade Maaimum DC Inl Cunene 12.5 Adc eflnXimum Efficiency 99.5 _ 96 We'vhr<i Erficieno/_. 98.8 Ovielrvoltepryae 11 OU TPU DURING OPERATION(POWER OPTIMIZER_CONNECTED TO OPERATING SOLAREOGE INVERTER) Maximum Dutpc2 Cuhert _ T_ 15 Adc ivlaxim_um Output Voltage _ __ 60 _ 85 _ Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) Safety Out 1Lut Voltage per Pcwer Ophnu.er1 Vdc STANDARD COMPLIANCE EMC I °art15 Ch s 8.PC61000 6-2,1EC61000 6.3 Safety 1EC621091( lass) safety).UL7,41. Rq HS Yes I INSTALLATION SPECIFICATIONS Maximum Allowed SystemVoltage 1000 Vdc .. - .. .. Pxxx-).sGrie_s 1.41 x 1 I1 x 40.5 j tis x 8.34 x 1.59 mm/in Dimensions(Wi,Lx H) 128 x 1S)x 27.5; S28 x 152 r :;5! 128x its 2 x 4F. Pxxx-5 series _ - in . t �x S97x LC3 5x E.9'<137 5x5.97x 1.89 Weight(including cables) 'Pxxx-2 series 95012,1 gr J Ih ,Pxxx-S set ies _ 770/1.7 930/2.05 63-0/2,05, -,Er,J lb Input,Cc nnectol MC4 Compatihle Outpul Wne Type/Connector Double InsulatedMC4 Compatible Output Woe Length 0.95/3.0., 1:2 11.9 m/It Operating TenlperauFe Rarge -40-+35/-40-+185 C/'F Pi otection Rating Pxx 2 el ee_ _ IP65 j LjElmu Pxxx-S Sri les IP6R/Ivt MA6P Relative HUnNdity I, _ 0-100 noted STC W wa,m the momnx rewule orup,o a:u F,,v r toll e;iowed PV SYSTEM DESIGN USING A SOLAREDGE INYERTERt'I SINGLE PHASE THREE PHASE 208V THREE PHASE 480V Minimum String Length t _(Power Optirnizersj 8 I.0 lE fJ13XIMU'n String Length 25 ( 25 50 ! (°ower OPbmizeis) .. . _ .. .. . Maximm uPower per Sir . ing _ 5250 . ( 6000 12750 i W PtLlralll of Different Lengths or ienttrtions Yes xT 2r t Q'I' 757 1 11001"PAN WO Iwo Mono Multi Solutions OEM Universal , 60 CELL MULTICRYSTALLINE MODULE 245-26OW - - F_0:5:08 POWER OUTPUT RANGE 15.9%% ® Our most wersit::e pro acl • - . MAXIMUM EFFICIENCY t 0--+3% �' One at the indus'ry's most trusted modeles POWER OUTPUT GUARANTEE 0 ^ r Highly rellabie d.je to stringent quality control Certitled .o witils±and challenging etralronrnentat conditions -- LINEAR PERFORMANCE WARRANTY to Year Produt cWarraniy • 25 Year Linear Power Warranty j 3 y fib rbir'c Solar,f 6 '" h'h{ yhy in9ar erlrrpgey. Trinasolar o ] HE Universal MODULE TSWPA05.08 0 I E'l SI O N S 0 r M'MO 0,U I` _ ml.nm . u 941 Peck Power Wvlls-P-v.iwp) 243 250 295 ^60 Power Oulouf ralemnce-P...fell 0-*3 erru �o bloxlmum Pcner Voltage-VAn(V7 29.4 30.3 30.5 30.6 -( rdonim In Power Cvrre f-4.o (A) 8.220 827 8.37 8.50 _tis-_ 0pe9C wt I fO,geV'c;',) 27.8 38A 33.1 38.2 I :Iru+w✓.ecu I" j Short Ctrcult Curren1-4,IA) 8.75 8.79 8.88 900 I�p' Module EtPrciPo YrV^1%7 15.0 153 .. _ 15.6 15.4 la EIEC ,41CA.0.arA F4 JC"i Maairnum Pc:oar-P:;.;,IWp! 162 lab 190 193 r Maximum Power Voltage-VArr(Vf 27.6 28.0 28.1 28.3 Mar mu P t. enf JAI 659 6.65 6.74 6.84 4.,erema.arqu A Open CK t\o11a8eN (VI 35.1 35.2 35.3 35.4 seuwna ShartC c t Cull-1,(A) 707 7.10 7.17 717 n� I ..�cn.�rrrA, 'oar,: Solarcells Multia,,talIm.156. 156 mm(A inches! -.• Cell orientation 60 Cels(6-10) Nladale dimenimix 1650-992^)5 rnm(64.95-3A0.-1.37 inches) Weight 18.6kg(41.OIbs) •r+Yi GIC, 3.2 mm(0331nchesL HiON.Transm's-s1on,AR Cocfed Tampered Glass •r�1I�f� 700ai 1000 mm L� 8 ksheei White Frame Elack Anodized Aluminium,Alloy I-Box IP 65 orIP Nratetl Cables Pholovolfak TeChnob6y Coble 4.0mm'(0.006 Inches'), 70011000 mm -V CORJESCF FV muOUIC(245N) Connector MC4 or MC4Compafible RE t-`.IINCS MaAF-NI'7 minol Operotng6311 TeProduct a Tamparatur Wc(km INOCT} Workmanship Waaanty e '�- -� - - - - Temperature Coefficient oiPwx 0.4I%PC 25 yeart.inear Power Warranty f em .. Peratme CoelficieM of UM -0.82%!°C '•..'•.:. ••.•.., r"'• Temperature Coefficient of he 005%PC 40, Mz61 An WP RRIINGi Operafl0nal ternperclure -40�+85`C Maximum System 600VOCIU4 Volla9e Max Serles Fuse RNing 15A CERTIrICAiIGN e 4L us $P• ?ac:x aialla;comP.rnlecent, - MTE0 Md, bau:30 pieces tea• c� Modules per 40confamer.840 pieces The Coninhutwealth of Massachusetts Department of lndustrialAccidents W11"irkers'Campensation I Congress Street,Suite 100 Boston,MA 02114-2017 Ivomiteass.gov1dia Insurance Affidavit:Builders/C,aniractors/ElectricinnslPlumbers, TO BE FILED WITH THF,PERNUTT4\O AUTHORITY. Annlicant Information Please Print Leeibly Nai ne(Ausiness/Orgmnizadurd)ndividual): Trinity .Solar W_ Address: 2211 Allenwood Road City/stateizip: Wall, NJ 07719 Phone 11: 732-780-3779 Are yea as employer?Check the appropriate bus: Type of project(required): 1 sfam a cmployerwith 300 employees(full and`or pmt-IiM)1 T. ❑New construction 2.❑l am a sole pmprictor or partnership and have no employees working for me us g- ❑Remodeling any capacity.Ino workers'comp.insurance required.! 9. El Demolition 3.❑I ran a homemvner doing all work myself IF%workers'comp,insurance required.)t 10❑Building addition 4.❑i am a homeowner and coil I be hiring contractors to conduct an work on my property. 1 will ensma that all conlmclors either have worker'compemarion insurance or we sale I LVElectrical repairs or additions pngnieters with no employees. 12.❑Plumbing repairs or additions 5.❑I ama general contractus and I have hired the nub-contmemrslisted onthe onached sheer. ME]Roof repairs These sub-conlmemrn have employees and have workers'comp.insurance./ 6❑live aro a corporation and its officers have exercised their right of exemption per h(GL c. 14.❑Other_ 152,§I(4),and we have no empte)vos.[No workers'comp.insurance required.) •My applicant that checks box N l must also fill au(the section below showing Their.orkers aomperesaoun policy information. t Homeowners who submit this affidavit indicating they are doing all work and then him outside contractors must snbmil a raw affidavit indicating such. ICombactom That check this box must attached an additional sheet shoving the name of the sub-cadractars and state whctber or not those entities have employees. If the sub conlmctors have employees,They mol provide Their workers'comp.policy number. I ant an employer that is provlding workers'compensallon hrsarance for my employees. Below Is the policy and job site lrtformation. Insurance Company Name: The Dittmar Agency Policy q cr Self-ins,Lie,4: FwC',r('000065.615 Expiration nate: 111111/16 Job Site Address: 1 Victory Rd. City/StatelZip: Salem,MA Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MOL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or ore-year imprisonment,as well as civil penalties by the form of a STOP WORK ORDER and a tine of up to$250.00 a day against the violator.A copy of this statement may he forwarded to the Off§ce of investigations of the DIA for insurance coverage verification. I do berebv cera y under the trains aanaJ n�dpent illlh r ajperjnry'that the Information provided above Is trite t. e and correct. Signature: A l,i�`H.L( y,&U-M&- Date: 9/30/16 Phone 9- Offtciai Ilse oniy. Do not write fn this area,to be completed by ciq,or town afoetal City or Town: PermitiLicense R Issuing Authority(circle one): t.Board of Health 2.Building Department 1.Cityffown Clerk 4. Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone H: Office of Consumer Affairs dnd Business Regulation yrs" 10 Park Plaza - Suite 5170 - Boston, Massachusetts 02116 Home Improvement Contractor Registration Registration: 170355 Type: Supplement Card Expiration: 10/12/2017 TRINITY HEATING & AIR, INC. GREGG LAGASSE-- -- ---- - - _ - - 20 PATTERSON BROOK ROAD UNIT 10 - WEST WAREHAM, MA 02576 Update Address and return card.Mark reason for change. SCA I &; 20M-10=m i` Address i`j Renewal ❑ Employment ❑ Lost Card J�F. T9Ill I3K<UlfflJ.��P�l�'FL11GJ[t('�llu'A.�li ace of Consumer Affairs&Business Regulation License or registration valid for individul use only ME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: Office of Consumer Affairs and Business Regulation Registration: 170355 Type: 10 Park Plaza-Suite 5170 Expiration: 10!12/2017 Supplement Card Boston,MA 02116 TRINITY HEATING&AIR;INC. r GREGG LACASSE \ 20 PATTERSON BROOK ROAD U --- t WTES'Q WAREHAM,MA 02576 •Undersecretary N Wa t 'thou[si azure ® Massachusetts Department of Public Safety Board of Building Regulations and Standards License: CS-103631 Construction Supervisor i GREGGLACASSE : 14 PINE ISLAND RD,. ,. MATTAPOISETT MA. ti �...�n /' _ Expiration: Commissioner 08/30/2017 HOMEOWNERS AUTHORIZATION FORM David Richard (print name) am the owner of the property located at address: 1 Victory Road (print address) I hereby authorize Trinity Solar, and their subcontracting company , to act as my Agent for the limited purpose of applying for and obtaining local building and other permits from the Authority Having Jurisdiction as required for the installation of a Photovoltaic System located on my Property. This authorization includes the transfer/re-administering, and/or cancellation of any existing permits on file for the purpose of updating/applying with an alternate subcontractor. 'tP'J1P- ;Customer Signature Date: Print Name: David Richard DocuSign Envelope ID:A515C825-2996-4A3F-A222-65CDAOED3917 10 Fast Greenway Plaza Sic 475, Houston.TR 77046 S U n nt Jva 'r ?81.985.9900 wtivw.sunnovacom SUMMARY floor owner Name and.Address Co-Oww,Name(If Any) Installation Location Conrnmmr Information and License David Richard I VICTORY RD SALEM, Trinity Solar 1 VICTORY RD MA 01970-5629 2211 Allenwood Rd SALEM, Wall,New Jersey 07719 MA 01970-5629 License MA-170355NY-52821NY- Contota ID H2409780100 NJ- N9001139146 13VH01244300 MD-109285 i I Estimated Solar Energy Production Estimated First Year Annual Production: 6,399 kWh Estimated Initial Term Total Production: 150,743 kWh Payment Terms Amount Due at Contract Signing: $0.00 f Installation Fee: $0.00 Annual Increase of Solar Energy Rate: 2.9%/year First Year Solar Energy Rate, if paid by ACH: SO.139/kWh First Year Solar Energy Rate, i f not paid by ACH: $0.153/kWh Monthly Bill in First Year, if paid by ACI-I: $7413 /month Monthly Bill in First Year, if not paid by ACH: $81.59/month 1. introduction. month. We refer to this period of time as the"Term." The Term begins on the Interconnection Date, The This Power Purchase Agreement(this"Power Purchase "Interconnection Date"is the date that the System is turned Agreement'or"PPA')is the agreement between you and on and generating power. Sunnova will notify you by email Sunnova Energy Corporation(together with its successors when the System is ready to be turned on. and assigns, "Sunnova"or"we"). covering the sale to you of the power produced by the solar panel system(the 3. Power Purchase Agreement Payments; Amounts. "System")described below. Sunnova agrees to sell to vou, and you agree to buy from Sunno%a.all of the power produced by the System on the terms and conditions (a) Power Price. You are purchasing the power the described in this Power Purchase Agreement. The System System produces. The price of that power is set forth will be installed by Sunnova or a contractor acting on on the"Value Statement"attached as Schedule A. Sunnova's behalf at the address you listed above. This Power Purchase Agreement will refer to this address as the (b) Payments. Schedule A details,among other things, "Property'or your"Home." Sunnova provides you with a (i)the price per kWh you will be charged per Year; Limited Warranty(the"Limited Warranty'). The Limited (ii) the annual price per kR II percentage increase(if Warranty is attached as Exhibit 1. This is a legally binding any);(iii) Sunnova's estimate of the power that is agreement with disclosures required by law,so please read expected to be produced by the System during the everything carefully. If you have any questions regarding lust Year,(iv)Sunnova's estimate of the amount of power that is expected to be produced by the System this Power Purchase Agreement,please ask your Sunnova over the entire Terni(excludin sales consultant. Note that references in this PPA to the g any renewal term"day'means a calendar(lay. period(s)extending the Tenn as provided in Section 10);and(v)your Monthly Payment amount for the 2. Term. first Year. Your"Monthly Payment" is calculated based on the following: (A)the annual price per Sunnova agrees to sell you the power generated by the kWh multiplied by(B)the estimated kWh output per Systern for 25 years(300months), plus, if the Year("Estimated Annual Production")divided by Interconnection Date is not on the first day of a calendar (C)twelve(12). Each Monthly Payment is due on month, the number of days left in that partial calendar the seventeenth(17th)calendar day of the month for Conn'det ID: NS001139146 1 :ti 20008 ol:Sunnma Fnetgy Corpointmn.All Rights Reserved. DocuSign Envelope ID:A515C825-2996-4A3F-A222-85CDAOED3917 su, n—=va PPA-EZ August 29, 2016 Customer Information: Installation Address: David Richard 1 VICTORY RD 1 VICTORY RD SALEM MA,01970-5629 SALEM MA, 01970-5629 $0.00 $0.139 $74.13 25 Years Upfront costs Rate per kWh Monthly payment Agreement term (year one) (year one) AGREEMENT BENEFITS— INSTALLATION PROCESS • Trinity Solar and Sunnova will install a 5-kilowatt solar Your agreement gives you a 7-day cancellation system on your home. period without incurring any fees.After the 7 day period,a fee may be assessed to offset expenses • Your system is estimated to produce 6,399 kilowatt incurred by Sunnova and Trinity Solar. hours in the first year of service. • The rate you pay will never increase by more than • Any savings estimate is dependent on the energy usage information you provided us and may 2.9%per year. change as your usage and utility rates change over • You may renew this agreement for up to two time. successive five-year terms at the end of the original . Trinity Solar will complete the design and 25-year term. engineering drawings for your system, • If you choose not to renew the agreement at the end and Sunnova will review the final design to ensure of your 25-year term,Sunnova will remove the it meets our high-quality standards. system at no cost to you. . Your system activation may experience delays as a • You will receive a 10%discount each month when you result of the process for obtaining the necessary set up automatic payments from your checking or building permits and utility approval for net savings account(pricing above already reflects metering and interconnection of your system. discount). Once your system is installed, it must still pass • Your agreement is transferable to the new utility inspection before you can turn it on. homeowner if you sell your home. • Once your system is turned on and operating,you will receive two monthly electricity bills:one from • Your Solar Service Agreement includes your down your utility and one from Sunnova. payment of$0.00. . When the electric grid goes down,your solar power system will not work. I have reviewed,understand and agree with the above agreement terms and process. The pricing provided in this PPA-EZ agreement is valid Homeowner's Initials Homeowner's Initial until September 27, 2016 D.P. R. © 2016.Sunnova Energy Corp.All rights reserved. Agreement ID: NS001139146 DocuSign Envelope ID:A515C825-29964A3F-A222-B5CDAOED3917 -20 East Grcent+gay Plaza Ste 475,Houston.TX 77046 sun on va 'r ?81.955.9900 wew.sunnova.com the previous calendar month unless it is not a by more than 110%of the Estimated Annual business day, in which event,the Monthly Payment Production for the first Year. for such month will be due on the first business day after the seventeenth calendar day of such month. (d) payment Reconciliation. 1f(i)the System is off line Any payments due upon installation are due for more than seven(7)full twenty-tour(24)hour immediately prior to commencement of installation. days cumulatively during the Term(for example, You will not make a Monthly Payment if you fully you remove the System to do renovations to your prepay this PPA as provided in Section 4(j I. Home); or(ii)you take some action that significantly reduces the output of the System; or(iii)you don't (c) Yearly Adjustment to Monthly Pavment(s)& trim your bushes or trees to their appearance-when Estimated Annual Production. You will have regular VOL) signed this PPA to avoid foliage growth from access to information on the System's actual output shading the Systenn, then Sunnova will reasonably via your SUnnoya online account. The actual kWh estimate the amount of power that would have been output per Year(`Actual Annual Production")may delivered to you during such outages or reduced vary R-om the Estimated Annual Production due to production periods and shall neat this reasonable weather and other conditions. You agree that the estimate as part of the Actual Annual Production for exclusive means to monitor and measure the Actual that Year for purposes of this paragraph. You will Annual Production is via the System's meter; not be charged for the System being off line due to provided, however, if the System's meter Sunnova's fault,or if it's due to grid failure or power malfunctions or becomes inoperable, Sunnova will outages caused by someone other than you. reasonably estimate the amount of power that would have been delivered to you during the period in which the System's meter was malfunctioning or inoperable and shall treat this reasonable estimate as 4. Power Purchase Agreement Obligations. part of the Actual Annual Production for that Year for purposes of this paragraph. Your Monthly (a) System,Home and Property Maintenance Payment may adjust each Year if(i)there is a price You agree to: per kWh annual increase during the Term as set forth in Schedule A and/or(ii)Actual Annual Production (i) only have the System repaired pursuant to varies from the Estimated Annual Production as set the Limited Warranty and reasonably forth on Schedule A. After the end of each Year cooperate when repairs are being made; during the Term, Sunnova will notify 3 o of the Actual Annual Production for the previous Year and (i1) keep trees,bushes and hedges trimmed so of any adjustment to the Estimated Annual that the System receives as much sunlight as Production and Monthly Payments for the current it did when Sunnova initially installed the Year and thereafter. if the Actual Annual Production System; is less than the Estimated Annual Production for the previous Year,Sunnova(i)will pay you an amount (iii) keep the panels clean,pursuant to the equal to the difference between the Estimated Limited Warranty:and the Guide(as such Annual Production and the Actual Annual term is defined in Exhibit 1); Production("Overestimate of Production") multiplied by the annual price per kWh for that Year (iv) not modify your Home in a way that shades (including;any annual kWh price percentage increase the System; previously agreed upon as provided in Schedule A) and(it) may,at its option, decrease the Estimated _ (v) be responsible for any conditions at your Annual Production and the Monthly Payments for Home that affect the installation(e.g., the current Year. If the Actual Annual Production is blocking access to the roof, or removing a more than the Estimated Annual Production for the tree that is in the way,prior work you have previous Year, Sunnova may, at its option,(i)apply done on your home that was not permitted); the difference between the Actual Annual Production and the Estimated Annual Production to an (vi) not remove any markings or identification Overestimate of Production for the current Year or a tags on the System; subsequent Year and/or(ii)increase the Estimated Annual Production and the Monthly Payments for (vii) permit Sunnova,after we give,you the current Year and thereafter. In no event shall reasonable notice,to inspect the System for Sunnova increase the Estimated Annual Production Contract ID: NS001139146 2 20os-2ol i Sunno DocuSign Envelope IU A515C625-29964A3F-A222-B5CDAOED3917 10 Fast Greenway Pluzn Ste 4-5. Houston. Tk 71046 S U I{�1 nt/'�va i 381,985.9900 tvtvn'sunnuva.cum proper operation as we reasonably (vi) insure the System against all damage or loss determine necessary; unless(A) that damage or loss is caused by your negligence; of(B)you intentionally (viii) use the System primarily for personal, damage the System; $unity or household purposes,but not to heat a swimming pool, and not to provide (vii) repair the System pursuant to the Limited power to any property outside of your Warranty and reasonably cooperate with Home; you when scheduling repairs; (ix) not do anything, permit or allow to exist any (viii) create a priority stream of operation and condition or circumstance that would cause maintenance payments to provide enough the System not to operate as intended at the tush flow in our financing transactions to Property; pay for the Limited Warranty obligations and the repair and maintenance of the (x) notify Sunnova if you think the System is System in accordance with this PPA even if damaged or appears Unsafe; if the System is Sunnova ceases to operate; stolen;and prior to changing your power supplier; (ix) not put alien on your Home or Property; and (xi) have anyone who has an ownership interest in your Home sign this Power Purchase (x) install,operate and maintain the System in Agreement; and accordance with applicable net metering and interconnection laws. (xii) return any documents we send you for signature(like incentive claim forms) (c) Home Renovations or Repairs within seven(7)days of receiving them; and If you want to make any repairs or improvements w the Property that could interfere with the System (xiiiJ authorize Sunnova to make inquiries (such as repairing the roof where the System is concerning your credit history and standing located),you may only remove and replace the System pursuant to the Limited Warranty. from time to time. (d) Automatic Pavmcnt,Fees;Late Charges In addition to the other amounts you agree to pay in (b) System Construction,Repair,Insurance andthis Power Purchase Agreement, yon agree to pay the Sunnova's obligations: following: Sunnova agrees to cause our contractors to: (i) Automatic Payment Distoma: All prices include a ten percent('10'%)monthly (1) schedule the installation of the System at a discount for using automatic payment. You mutually convenient date and time: will not receive a ten percent(10%) monthly discount if you do not make (if) construct the System according to written automatic Monthly Payments through your plans you review; checking or savings account; (iii) provide you with a meter to nCeUratcly (ii) Late Payments: accrue interest at the measure the amount of power the System lesser of twelve percent(120/4)annually delivers to you; or the maximum allowable rate by applicable law beginning on the sixteenth (tv) notify you if the System design has to be (16th)day after the date the payment was materially changed so that you can review due and continuing until paid in full: and any such changes; (iii) Returned Check Fee: S25.00(or such lower amount as required by law)for any check or (v) cleanup ager ourselves during the withdrawal right that is returned or refused construction of the System; em; by your bank and. Contract ID: NSOO 11391.46 3 200-2015 Sunnova Nawrk�v Corporation.All Rightx Reaeroul. DocuSign Envelope ID:A515C825-2996-4A3F-A222-65CDAOED3917 20 East Greenway PIA/.a Ste 475,Houston.TN 77046 S U n nt JVa r 281.98.5.9900www.sunnova.com (iv) Product Change Fee: if after you si-n this days atter this Power Purchase Agreement Power Purchase Agreement, but before we expires to provide Sunnova with time to begin installation, you decide you would remove the System at the end of the Power prefer an alternative Sunnova product you Purchase Agreement. Sunnova shall will pay a 5250 change fee. provide you with reasonable notice of its need to access the Property whenever (e) Estimated faxes commercially reasonable. You agree to pay any applicable sales or use taxes on (ii) During the time that Sunnova has access the Monthly Payments(or prepayment,as rights you shall ensure that its access rights applicable)clue under this PPA If this PPA contains are preserved and shall not interfere with or a purchase option, you agree to pay any applicable permit any third patty to interfere with such tax on the purchase price for the System. You also rights or access. You agree that the System agree to pay as invoiced any applicable personal is not a fixture,but Sunnova has the right to property taxes on the System that your local file any UCC-I Financing statement or jurisdiction may levy. The total estimated amount fixture tiling that confirms its interest in the you will pay for taxes over the Tenn is$0.00 System. assuming that tax rates stay the same as they are on the date of this PPA. In the event the tax rates (h) Indemnity change during the Temt that amount will change. To the fullest extent permitted by law,you shall (t) No Alterations indenmify,defend, protect, save and hold harndess Sunnova,its employees,officers, directors,agents, You agree that you will not make or al low any other successors and assigns from any and all third party patty to make any modifications,improvements, claims,actions,costs,expenses(including attorneys' revisions or additions to the System or take any other fees and expenses'),damages, liabilities,penalties, action that could void the Limited Warranty on the losses,obligations,injuries,demands and liens of System without Sunnova's prior written consent. If any kind or nature arising out of,connected with, you make or allow any other party to make any relating to or resulting from your negligence or modifications, improvements,revisions or additions willful misconduct; provided, that nothing herein to the System,they will become part of the System shall require you to indemnify Sunnova for its own and shall be Sunnova's property. negligence or willttd misconduct. The provisions of this paragraph shall survive termination or expiration (el Access to the System of this Power Purchase Agreement. (i) You grant to Sunnova and its employees, agents and contractors the right to (i) Payments reasonably access all of the Property as necessary for the purposes of(A) installing, Schedule A describes your payment obligations constructing,operating,owning,repairing, under this PPA. SUBJECT TO SECTION 3(b) removing and replacing the System or ABOVE,YOU AGREE THAT THE OBLIGATION making any additions to the System or TO PAY ALL PAYMENTS AND ALL OTHER installing complementary technologies on AMOUNTS DUE UNDER THIS PPA SHALL BE or about the location of the System;(B) ABSOLUTE AND UNCONDITIONAL UNDER enforcing Sunnova's rights as to this Power ALL CIRCUMSTANCES AND SHALL NOT BE Purchase Agreement and the System;(C) SUBJECT TO ANY ABATEMENT,DEFENSE, installing, using and maintaining electric COUNTERCLAIM, SETOFF,RECOUPMENT OR lines and inverters and meters,necessary to REDUCTION FOR ANY REASON interconnect the System to your electric WHATSOEVER,PI BEING THE EXPRESS system at the Property and/or to the utility's INTENT OF THE PARTIES THAT ALL electric distribution system;or(D)taking AMOUNTS PAYABLE BY YOU HEREUNDER any other action reasonably necessary in SHALL BE, AND CONTINUE TO BE,PAYABLE connection with the construction. IN ALL EVENTS INCLUDING BY YOUR HEIRS installation,operation, maintenance, AND ESTATE AND. EXCEPT AS SET FORTH removal or repair of the System. This access BELOW IN SECTIONS a AND 25, YOU HEREBY right shall continue for up to ninety(90) WAIVE ALL RIGH I'S YOU MAY HAVE TO REJECT OR CANCEL THIS PPA,TO REVOKE Contract ID: NS001139146 4 c'2003-2011 Sunno%a Corporacion.All Rlghts Rcxervad. DocuSign Envelope ID:A515C825-29964A3F-A222-B5CDAOED3917 /'� 20 East Grecuway Plaza Ste 975, Houston. TX 77046 SU nt Iva r ?R L9A.S9900 wwvvsunnovm.com ACCEPTANCE OF THE SYSTEM,OR TO than the Actual Post-Prepayment Production,you GRANT A SECURITY INTEREST IN THE will owe nothing to Sunnova. SYSTEM- Option YSTEM. O non to Prepay all Payments Remaining on the 5. Conditions Prior to Installation of the System; Chance G) P � P' y PPA Orders. You may prepay all payments remaining on this PPA (a) Sunnova's obligation to install the System and sell at any time provided you notify Sunnova of your you the power it produces is conditioned on the desire to prepay. The amount you prepay will be following items having been completed to its based on the following:(i)all accrued but unpaid reasonable satisfaction: Monthly Payments, taxes,Irate charges, penalties, interest and all or any other sums then accrued or due (I) completion of(A)the engineering site audit and owing,plus(ii)the amount set forth on Schedule (a thorough physical inspection of the A in the column titled`Prepay Option,"which Property. including,if applicable, amount may be adjusted at the time of prepayment to geotechnical work), (B)the final System reflect Sunnova's estimate of the kWh output per design,and(C) real estate due diligence to Year from the time of prepayment to the end of the confirm the suitability of the Property for Tenn("Estimated Post-Prepayment Production")and the construction, installation and operation discounted to present value at 5%per annum,plus of the System; (iii) reasonable compensation,on a net after tax basis assuming a tax rate of 35%, for the loss or recapture (I i) approval of this Power Purchase Agreement of(.A) the investment tax credit equal to thirty by Stumova's financing sources: percent(30%)of the System cost, including installation;and(B)accelet,7ted depreciation over (iii) your meeting Sunnova's credit underwriting five (5)years equal to eighty five percent(85%)of criteria then in effect; the System cost, including installation, and for the loss of any anticipated benefits pursuant to Section 8 (iv) confirmation of rebate, tax credit and of this PPA(Sunnova shall furnish you with a detailed calculation of such compensation if such a renewable energy credit payment availability in the amount used to calculate claim is made). After you notify Sunnova of your the Monthly Payments set forth in this desire to prepay,Sunnova will provide a notice to Power Purchase Agreement you(`Prepayment Notice")informing you of the Estimated Post-Prepayment Production and the amount you need to pay to prepay the PPA(the (v) confirmation that Sunnova will obtain all "Prepayment Amount)". The Prepayment Amount is applicable benefits referred to in Section 3; due within fifteen(15)days h-o n the date of the Prepayment Notice. After you timely pay the (vi) receipt of all necessary zoning, land use and Prepayment Amount in full, you will not make any building permits;and further Monthly Payments. At the end of the Term, Sunnova will notify you of the actual kWh output per (vii) completion of any renovations; Year from the date of your prepayment to the end of improvements or changes reasonably the Term("Actual Post-Prepayment Production'). required at your Home or on the Property If, at the end of the Term.the Estimated Post- (e.g.,removal of a tree or necessary roof Prepayment Production is greater than the Actual repairs to enable us to safely install the Post-Prepayment Production, Sunnova will pay),ou, System). the homeowner who prepaid this PPA,within sixty (60)days after the end of the Term an arnount equal Sunnova may terminate this Power Purchase to the difference, if any,between the Actual Post- Agreement without liability if, in its judgment,any Prepayment Production and the Estimated of the above listed conditions will not be satisfied for Prepayment Production multiplied by the price per any reasons. Once Sunnova starts installation., kWh at the endof the'I erm(a "Prepayment however. it may not terminate this Power Purchase Rebate"). Sunnova will send the Prepayment Rebate Agreement for your failn7e to satisfy the above listed to the last address we have for you in our tile and it conditions. is your responsibility to notify Sunnova if you move. If the Estimated Post-Prepayment Production is less (b) Amendments. Your Right to Terminate For Material Changes Before Installation. Contract ID: NS001139146 5 K 2068-2611.Jn1010W Energy Corportmon.All Rii}a=Reserved. DocuSign Envelope ID:A515C825-2996-4A3F-A222-B5CDAGED3917 - 10 East Grecimay Plaza Ste 475,Houston, TX 77046 Sun tit Iva 't .8L9bi,9900wwnvsum,�oca.com Both parties will have the right to terminate this generated from the System. You shall at all times keep the PPA,without penalty or Yee, if Sunnova determines System free and clear of all liens, claims, levies and legal after the engineering site audit of your Home that it processes not created by Sunnova,and shall at your expense has misestimated the System's annual production by protect and defend Sunnova against the same. more than ten percent(10%). Such termination right will expire at the earlier of(i)one(I)week prior to YOU UNDERSTAND AND AGREE THAT ANY AND the scheduled System installation date and(ii)one ALL(i)TAX CREDITS(ii)TAX INCENTIVES,(iii) (1)month after we inform you in writing of the RENEWABLE ENERGY CREDITS, GREEN TAGS,OR revised production estimate. If neither pany CARBON OFFSET CREDITS,(iv)UTILITY REBATES, exercises their right to terminate this PPA following OR(v)ANY OTHER NON-POWER ATTRIBUTES OF a ten percent(104,oj change in the System's THE SYSTEM ARE THE PROPERTY OF AND FOR production,then any changes to the System will be THE BENEFIT OF SUNNOVA, USABLE AT ITS SOLE documented in an amendment to this PPA. You DISCRETION. SUNNOVA SHALL,HAVE THE authorize Sunnova to make corrections to the utility EXCLUSIVE RIGHT TO ENJOY AND USE ALL SUCH paperwork to conform to this PPA or any BENEFITS,WHETHER SUCH BENEFITS EXIST NOW amendments to this PPA we both sign. OR IN THE FUTURE. YOU AGREE TO REFRAIN FROM ENTERING INTO ANY AGREEMENI WITH 6. Warrantv. YOUR UTILITY THAT WOULD ENTITLE YOUR YOU UNDERSTAND THAT THE SYSTEM IS UTILITY TO CLAIM ANY SUCH BENEFITS RETAINED BY SUNNOVA. YOU AGREE TO WARRANTED SOLELY UNDER THE LIMITED WARRANTY ATTACHED AS EXHIBIT E AND THAT REASONABLY COOPERATE AX C EDITS.SUNNOASO THERE ARE NO OTHER REPRESENTATIONS OR THAT Cl'MAY CLAIM ANY TAX CREDITS. RENEWABLE ENERGY WARRANTIES. EXPRESS OR IMPLIED,AS TO THE CREDITS, REBATES, MERCHANTABILITY, FITNESS FOR ANY PURPOSE, CARBON OFFSET CREDITS TS OOR ANY OTHER CONDITION, DESIGN, CAPACITY, SUITABILITY OR TO THE CS FROM THE SYSTEM. THIS MAY INCLUDE PERFORMANCE OF THE SYSTEM OR ITS IN THE EXTENT ALLOWABLE BY LAW,ENTERING IN INSTALLATION.THE WARRANTY SET FORTH TO NET METERING AGRL'LMENTS, HEREIN REPRESENTS THE SOLE AND EXCLUSIVE INTERCONNECTION AGREEMENTS,AND FILING REMEDY"YOU HAVE AGAINST SUNN'OVA RENEWABLE ENERGY/CARBON OFFSET CREDIT RELATING TO THE SYSTEM OR THE POWER REGISTRATIONS AND/OR .APPLICATIONS FOR PURCHASED THEREUNDER. REBATES FROM THE FEDERAL, STATE OR LOCAL GOVERNMENT OR A LOCAL UTILITY AND GIVING THESE TAX CREDITS, RENEWABLE 7. Transfer. ENERGY/CARBON CREDITS, REBATES OR OTHER BENEFITS TO SUNNOVA. Sunnova works with banks,companies and other financing parties to finance the System. As a result. Sunnova may g Purchasing the Svstem Prior to the End of the Term. assign this PPA to one of its financing parties. In addition, Sunnova may assign this PPA to its affiliates or a third in addition to purchasing the System at the end of the Term party that purchases the PPA. You agree that Sunnova may (see Schedule A),you have the option to purchase the pledge,assign, sell or transfer the System and this Power System prior to the end of the Tenn. To exercise this Purchase Agreement,or any part of this Power Purchase option you must be in good standing under this Power Agreement or the exhibits,without your consent. Purchase Agreement and you need to give us at least one Assignment,sale or transfer_generally means that Sunnova (1)month's, but not more than three (3)months' prior would transfer all or a portion of its rights and certain of its t%ritten notice. You can purchase this System: obligations under this Power Purchase Agreement to (i) on the five(5)year anniversary of the another party. beginning of the Tenn and every annual anniversary alter the five(5)year anniversary;and 8. Ownership of the System;Tax Credits and Rebates. (it) at any time after the five(5)year antiI ersary of the beginning of the Tenn, You agree that the System is and shall remain Sunnova's when you sell your Home:and exclusive personal proparty under the Uniform Commercial (iii) if Sunnova ever ceases its operations. Code or otherwise. YOU understand and agree that this PPA In each of i , it and (iii above., the rice ou will a for is not a contract to sell or lease the System to you. Sunnova O O ) P y pay the System will be the greater of the System's Cain market owns the System for all purposes. including any data value("FMV")and the amount shown on Schedule A. The Contract ID: NS0011-19146 6 ('2008-2015 Sunn,,,a Energy C'orpornm,n.All Right,Reserved. DocuSign Envelope ID.A515C825-2996-4A3F-A222-65CDAOED3917 20 Fast Greenway Plaza Stc 475, Houston. TX 77046 S U n nt/'�1va T 381.985.9900 wtu_Vc_sunnova.com interests of any financing party shall not be taken into obligations under this Potver Purchase account when determining the FMV;a third party Agreement. independent appraiser will be retained to compute true System's FMV. Sunnova's maintenance and repair (ii) Move the System to Your New Hume obligations will end when you purchase the System unless you enter into a net,maintenance and repair agreement If you are moving to a new home in the same with Sunnova,provided that VOL)will have no less than a utility district, where permitted by the local ten(10)year warranty on the System beginning oro the utility,the System can be moved to your new Interconnection Date that guarantees that the System will be home pursuant to the Limited Warranty.You tree from defects in workmanship or defects in,or will need to Puy all costs associated with breakdown of materials or components. relocating the System,execute and provide the same access and ownership rights to Sunnova 10. Renewal. as provided for in this PPA and provide any third party consents or releases required by Ifyou are in compliance with your PPA,you have the Sunnova in connection with the substitute option to renew your PPA for up to ten(10)years in two(2) premises. consecutive five(S)year renewal periods. We will send you renewal forms at least ninety(90)dgvs prior to the (iii) Prepay this Power Purchase Agreement expiration of the Term, which forms shall set forth the new and Transfer only the Use of the System rates per kwh applie•able for the renewal term as well as the rates applicable in the event the PPA is renewed for one(1) )'on can prepay this Power Purchase year as provided for herein. The renewal forms will give Agreement as set forth in Section 4(J).The you the option to.(a)elect to renew the PPA for an Person haying your Home wi I I only need to additional five(5)year term at the rotes specified in the sign a transfer agreement to assume your renewal notice,or(b)elect not to renew the PPA. You must rights and non-Monthly Payment obligations make your election whether to renew or not at least thirty under this PPA in substantially the same form (30)days prior to the end of the then current term of the as Exhibit 3 to this PPA (a"Transfer PPA. In the event Char you affirmatively elect not to renew AgreemenC'). this PPA as provided for in pail(h) above this PPA shall expire by its terms on the expiration office then current (b) You agree to give Sunnova at least fitteea(15)days term. If you don't send us anything in writing you will be but not more than three(3) months' prior written deemed to have renewed for an additional one(1)year term notice if you want someone to assume your PPA at a rate which equals the rate per kwh applicable at the obligations. In connection with this assumption. expiration of the then current term plus bvo point nine you, your approved buyer and Sunnova shall execute percent(2.9%)and this PPA shall continue to renew for a Transfer Agreement. Unless we have released you additional one(1)year terms on the above described rate from your obligations in writing,you are still terms until(i) you give us notice at least thirty(30)days responsible for performing under this PPA. If your prior to the expiration of the then current term thatyou do buyer defaults on this PPA and we have not yet not wish to renew,or(ii) we send you a notice terminating signed theTTansfer Agreement,you will be the PPA at least thirty(30)dr{vs prior to the expiration of responsible for their default. We will release you the then current term. front your obligations under this PPA in writing once we have a signed Transfer Agreement with the 11. SCIIIn2 Your Home. person buying your Home(provided such person has been approved as a transferee by Sunnova in (a) If you sell your Home you can: wTiting). (i) Transfer this Power Purchase Agreement (c) If you sell}'our Home and can't comply with.any of and the Monthly Payments the options in subsection(a)above, you will be in default under this Power Purchase Agreement. If the person buying your Home meets Section I I(a)includes a Home sale by your estate or Sunnova's credit requirements,then where heirs. permitted by the local utility,the person (d) EXCEPT ASSET FORTH IN THIS SECTION, buying your Home ran sign a transfer agreement assuming all of your rights and YOU WILL NOT ASSIGN, SELL, PLEDGE OR IN ANY OTHER WAY TRANSFER YOUR Contract ID: NSOO 11391.46 1 2008-2015 Suauo�a Fimgy Corporation_,All Right,Reserved. DocuSign Envelope ID.A515CB25-2996-4A3F-A222-BSCDAOED3917 °0 East Greenway Plaza Sic 475, Houston. TX 77046 S U n of/�Iva '1 281..985.9900 w«tivsunnova.com INTEREST IN THE SYSTEM OR THIS PPA (a) you fail to make any payment when it is due and WITHOUT OUR PRIOR WRITTEN CONSENT, such failure continues for a period of ten(10)days; WHICH SHALL NOT BE UNREASONABLY WITHHELD AS LONG AS YOU AND THE (b) you Fail to perform any material obligation that you PROPOSED TRANSFEREE MEET THE OTHER. have undertaken in this PPA(which includes doing REQUIREMENTS SET FORTH HEREIN. something you have agreed nor to do, like alter(lie System)and such failure continues fora period of fourteen(14)days after written notice; 12. Loss or Damage. (c) you or your guarantor have provided any false or Unless you are negligent or you intentionally damage misleading financial or other information to obtain the System, Sunnova will bear all of the risk of loss, this Power Purchase Agreement, damage, theft,destruction or similar occurrence to any or all of the System. (d) you assign, transter,encumber, sublet or sell this PPA or any part of the System without Sunnova's In the event you are negligent or intentionally prior written consent:or damage the System you shall be liable to pay Sunnova the greater of(a)the actual damages (e) you or any guarantor makes an assignment for the suffered by Sunnova;or(b)the amount determined benefit of creditors,admits iii writing its insolvency; in Section 40). Except as expressly provided in this files or there is filed against you or it a voluntary PPA,no loss, damage, theft or destruction will petition in bankruptcy, is adjudicated bankrupt or excuse you from your obligation's under this PPA, insolvent or undertakes or experiences any including Monthly Payments. substantially similar activity. 13. Limitation of Liability. 15. Remedies in Case of Default. (a) No Consequential Damages If this Power Purchase Agreement is in default,we may take any one or more of the following actions. if the law SUNNOVA'S LIABILITY TO YOU UNDER THIS requites us to do so, we will give you notice and wait any POWER PURCHASE AGREEMENT SHALL BE period of time required before taking any of these actions. LIMITED TO DIRECT, ACTUAL DAMAGES We may: ONLY. YOU AGREE THAT IN NO EVENT SHALL EITHER PARTY BE LIABLE TO THE (a) terminate this PPA: OTHER FOR CONSEQUENTIAL, INCIDENTAL, PUNITIVE,EXEMPLARY,SPECIAL OR (b) take any reasonable action to correct your default or INDIRECT DAMAGES. to prevent our toss;any amount the pay will be added to the amount you owe us and will be immediately (ti) Actual Damages due; EXCEPT FOR CLAIMS UNDER SECTION 4(H), (c) require you,at your expense, to return the System or NEITHER PARTY'S LIABILITY TO THE OTHER make it available to us in a reasonable manner; WILL EXCEED AN AMOUNT EQUAL TO THE MAXIMUM AMOUNT THAT COULD BE (d) proceed,by appropriate court action,to enforce PAYABLE BY YOU UNDER SECTION 15(H). performance of this PPA and to recover damages for DAMAGES TO YOUR HOME, BELONGINGS OR your breach; PROPERTY RESULTING FROM THE INSTALLATION OR OPERATION OF THE (e) disconnect, turn off or take back the System by legal SYSTEM ARE COVERED IN THE LIMITED process or self-help, but we may not disturb the WARRANTY. peace or violate the law; 14. Default. (t) report such non-operational status of the System to your utility.informing them that you are no longer You will be in default under this Power Purchase net metering; Agreement if any one of the following occurs: Contract ID: NS001139146 $ C 2008-2013 SU11110�Rl E.nogv Corpornfipn,All Righty ReServcA DocuSign Envelope ID:A515CB25-2996-4A3F-A222-B5CDAOED3917 -20 Gast Grevnwav Plai.a Stu 475, Houston-Tk 77046 S U m n v a 'r 28L985.9900ww1vsunnova.com (g) charge you a reasonable reconnection fee for The laws of the state where your Homc is located,without reconnecting the System to your utility or turning the giving effect to conflict of laws principles. shall govern this " System back on after we disconnect or turn off the PPA,except the Federal Arbitration Act.9 U.S.C. § I,et SyStem due to your default; seq., shall govern interpretation,en forcement and proceedings under Section 18,and not the arbitration acts, (h) recover from you(i)all accrued but unpaid Monthly statutes or rules of any otherjurisdiction. Payments, taxes,late charges, penalties,interest and all or any other sums then accrued or due and owim,. 18. Arbitration. plus(ii)the estimated amount of future Monthly PLEASE READ THIS SECTION CAREFULLY. Payment,each payment discounted to present value at 505.per annum, plus(iii)reasonable compensation, ARBITRATION REPLACES'IFCE RIGHT TOGO TO on a net after tax basis assumine a tax rate of 35'56, COURT, INCLUDING THE RIGHT TO A JURY TRIAL for the loss or recapture of(A)the investment tax AND THE RIGHT TO PARTICIPATE IN A CLASS credit equal to thirty percent (30%)of the System ACTION OR SIMILAR PROCEEDING. IN cost, including installation; and(B)accelerated ARBITRATION,A DISPUTE IS RESOLVED BY AN depreciation over five(5)years equal to eighty five percent(85%)of the System cost, including ARBITRATOR INSTEAD OF A JUDGE OR JURY. installation, and for the loss of any anticipated In this Section,the words"you"and"your'mean any benefits pursuant to Section 8 of this PPA (Sunnova shall furnish you with a detailed calculation of such person signing this Agreement as a Buyer or Co-Buyer. compensation if such a claim is made);or Unless the context requires otherwise,the words`we,""us" and`bur"mean the Contractor named above and any (i) use any other remedy available to us in this,PPA or assignee of this Agreement. by law. The laws of the state where your Home is located shall We may submit to credit reporting agencies-(credit govern this Agreement without giving effect to conflict of bureaus) negative credit reports that would be reflected on laws principles. If you are in default under this Agreement, your credit record if you do not pay any amounts due under Sunnova may elect,at its sole discretion,remedies available this PPA as required. under the terms of this Lease,at law, or in equity. We agree You agree to repay us for any reasonable amounts we incur that any other dispute,claim or disagreement between us(a to correct or cover your default and to enforce our rights "Dispute")shall be resolved exclusively by arbitration under this PPA including,but not limited to,attorney's fees except as specifically provided below. and court costs. You also agree to reimburse urs fin any costs and expenses nye incur relating to the System's return The arbitration,including the selecting of the arbitrator,will resulting from early termination.By choosing any one or be administered by JAMS,under its Streamlined Arbitration more of these remedies,Sunnova does not give up its right Rules(the"Rules"')by a single neutral arbitrator agreed on to use another remedy. By deciding not to use any remedy by the parties widuin thirty(30) days of the commencement should this Power Purchase Agreement be in default. Sunnova does not give up our right to use that remedy in of the arbitration. The arbitration will be governed by the case of a subsequent default. Federal Arbitration Act(Title 9 of the U.S. Code) and not anv state law. Either party may initiate the arbitration 16. System Removal; Return. process by tiling the necessary forms with J ANIS. To learn At the end of the Term or the termination of this PPA, if more about arbitration,you can call any JAMS office or you have not renewed this PPA or exercised your purchase review the materials at www jamsadr.com. The arbitration option (if any) and you have not defaulted;then within shall be held in the location that is most convenient to your ninety(90) days,von agree to call.Sunnova at the telephone Home. [f a JAMS office does not exist in the county where number'listed in Exhibit 1,or any other number we notify you of in the future,to schedule a convenient time for you live,then we will use another accredited arbitration Sunnova to remove the System from your Home at no cost provider with offices close to your I-tome. to you unless the termination was due to your default which is addressed in Section 15. If you initiate the arbitration, you will be required to pay the first S 125 of any filing fee. We will pay any filing fees in 17. Applicable Law. excess of$125 and we will pay all of the arbitration fees and costs. If we initiate the arbitration, we will pay all of rhe Contract ID: NS001139146 9 S 1008-2o14 1unn,rvn Energy r'orporatiotiAll Rights Reserved. DocuSign Envelope ID:A515C825-2996-4A3F-A222-B5CDAOED3917 /� ^-0 Fast Greenway Plaza Ste 475, Houston, TX 770+6 sunn3 Iva 'r 28L985.9900 www.sunnova.com tiling fees and all of the arbitration fees and costs. We will PROCEEDING IN CONNECTION WITH ANY SUCH each bear all of our own respective attorney's fees,witness DISPUTE. fees,and costs unless the arbitrator decides otherwise. BECAUSE YOU AND WE HAVE AGREED TO The arbitrator shall have the authority to award any legal or ARBITRATE ALL DISPUTES EXCEPT AS equitable remedy or relief that a.court could order or grant SPECIFICALLY PROVIDED IN THE LAST under this Agreement. The arbitrator.however, is not PARAGRAPH OF THIS SECTION, YOU AND WE WILL authorized to change or alter the tenns of this Aereement or NOT HAVE THE RIGHT TO LITIGATE THAT DISPUTE to make any award that would extend to any transaction IN COURT,OR TO HAVE A JURY"TRIAL ON THAT other than yours. All statutes of limitation that are DISPUTE,OR ENGAGE IN DISCOVERY EXCEPT AS applicable to any Dispute shall apply to any arbitration PROVIDED FOR INTHE RULES, FURTHER,YOU between you and us. ''lie arbitrator will issue a decision or WILL NOT HAVE THE RIGHT TO PARTICIPATE AS A award in writing. briefly stating the essential findings of tact REPRESENTATIVE OR MEMBER OF ANY CLASS and conclusions of law. PERTAINING TO ANY DISPUTE.,. THE Only Disputes involving you and us may be addressed in the ARBITRATOR'S DECISION WILL BE FINAL AND BINDING ON THE PARTIES AND MAY BE ENTERED arbitralion. Disputes mus[be brought in the name of an AND ENFORCED IN ANY COURTHAVING individual person or entity and must proceed on ail individual(non-class. non-representative)basis. The JURISDICTION,EXCEPT TO THE EXTENT IT IS arbitrator will not award relief for or against anyone who is SUBJECT TO REVIEW IN ACCORDANCE WITH not a party to the Dispute, if you and we arbitrate a Dispute, APPLICABLE FEDERAL LAW GOVERNING ARBITRATION AWARDS OTHER RIGHTS TL-IAT none of you r us, nor any other person, may pursue the on Dispute in arbitration usias a class action,class arbitration, YOU OR WE WOULD HAVE IN COURT MAY ALSO NOT BE AVAILABLE IN ARBLTR ATION. private attorney general action or other representative action,nor may any such Dispute be pursued on your or our NOTWITHSTANDING THE FOREGONG,NOTHING behalf in any litigation in any court except as specifically HEREIN CON'I'A1NED SHALL BAR YOU OR US provided below. Claims regarding any Dispute and FROM:(I)OBTAINING INJUNCTIVE RELIEF FROM A remedies sought as part of a class action,class arbitration, COURT AGAINST THREATENED CONDUCT THAT private attorney general or other representative action are COULD CAUSE IRRE.PARA13L'E HARM, LOSS OR subject to arbitration only on an individual(non-class,non- DAMAGE. UNDER FELL USUAL EQUITY RULES. representative)basis,and the arbitrator may award relief INCLUDING THE APPLICABLE RULES FOR only on an individual(non-class,non-representative)basis. OBTAINING RESTRAINING ORDERS AND This means that the arbitration may not address disputes PRELIMINARY INJUNCTIONS;OR(II)OBTAINING A involving other persons with disputes similar to the Disputes JUDGMENT FROM A COURT HAVING JURISDICTION between you and us. If any part of this paragraph of this CONFIRMING THE AWARD OF THE ARBI'LRATOR; Section is found to be unenforceable by an arbitrator ora OR(III)OBTAINING RESOLUTION OF A DISPUTE IN court having jurisdiction over aDispute, then this entire A SMALL CLAIMS COURT IF THE DISPUTE FALLS Section(except for this sentence and the following sentence) WITHIN THE JURISDICTION OF THE SMALL CLAIMS shall be automatically inapplicable to that Dispute. COURT(PROVIDED,HOWEVER,THAT NO ATTEMPT IS MADE TO TRANSFER RESOLUTION OF SUCH A EVEN IF ANY PART OF THIS SECTION IS FOUND TO DISPUTE FROM A SMALL CLAIMS COURT TO A BE UNENFORCEABLE AS DESCRIBED ABOVE,YOU COURT OF GENERAL JURISDICTION). AND WE EACH AGREE TO WARE THE RIGHT TO A TRIAL BY JURY IN CONNECTION WITH ANY BY SIGNING BELOW. YOU AGREE IN ADVANCE"CO SUBMIT DISPUTES TO ARBITI3A'IION WITH AN DISPUTE THAT DIGHT ARISE BETWEEN OR ARBITRATION FIRM APPROVED BY STATE INVOLVING YOU AND US, AND THE RIGHT TO REGULATORS,TO THE EXTENT REQUIRED. PARTICIPATE IN A CLASS ACTION OR SIMILAR Contract ID; NS001139146 10 CC 2008-201.5 Sunno%a Energy Corporation.All Rights Reseivul. DocuSign Envelope ID:A515C625-2996-4A3F-A222-B5CDAOED3917 20 East Greenway Pla/a Sic V5, Houston,TX 77046 S U n or T 28I.9A�.9900 vnvw'smmovacom 19. Waiver. or PDF signature page containing the signature(electronic, Any delay or failure of a party to enforce any of the faxed, PDF or original) is binding upon the parties, provisions of this PPA,including but not limited to any remedies listed in this PPA,or to require performance by the other party of any of the provisions of this PPA,shall 24. Further Assurances. not be construed to(i)be a waiver of such provisions or a You will cooperate frilly with us to effect the intent and party's right to enforce that provision;or(it)affect the provisions of this PPA and, from time to tune,to execute validity of this PPA. and deliver any and all other agreements,documents or 20. Notices. instruments,and to take such other actions, as Sunnova may determine to be reasonably necessary or desirable to effect All notices under this PPA shall be in writing and shall be the intent and provisions of this PPA. by personal delivery, facsimile transmission,electronic mail,overnight courier,or certified or registered mail, REST OF PAGE INTENTIONALLY LEFT BLANK return receipt requested,and deemed received upon personal delivery,acknowledgment of receipt of electronic transmission, the promised delivery date after deposit with overnight courier,or five(i)days after deposit in the mail. Notices shall be sent to the person identified in this PPA at the addresses set forth in this PPA or such other address as either party may specify in writing. Each party shall deem a document faxed to it as an original document. 21. Entire Aareement: Chances. This PPA contains the parties' entire agreement regarding the sale and purchase of power generated by the System. There are no other agreements regarding this PPA,either written or oral. Any change to this PPA must be in writing and signed by both parties. If any portion of this PPA is determined to be unenforceable,the remaining provisions shall be enforced in accordance with their terns or shall be interpreted or re-written so as to make them enforceable. 22 . Publicitv. Sunnova will not publicly use or display any images of the System unless you initial the space below. If you initial the space below,you give us permission to take pictures of the System as installed on your Home to show to other customary or Lis ay on our website. Ilnmcowner's Initials 23. Counterparts. This PPA may be executed simultaneously in any number of counterparts. Each counterpart shall be deemed to be an original, and all such counterparts shall constitute one and the same instrument. The parties agree that this PPA and signature pages may be signed electronically and transmitted behveen them by facsimile or by electronic mail and that electronic, faxed and PDF signatures shall constitute original signatures and that an electronic, faxad Contract ID: NSDD 1139146 11 f 2008-201'Sutmo.=a Encrg;i'orporation.All Hight"kesorvcA. DocuSign Envelope ID:A515C825-2996-4A3F-A222-85CDAOED3917 20 East Greenway Plaza Sic 475;Houston.TX 77046 S U n nnva T 281,985.9900 wv ..aunnova.com 25. NOTICE OF RIGHT TO CANCEL. AFTER THE DATE OF THIS TRANSACTION. SEE YOU,'PHE OWNER, MAY CANCEL'fHIS EXHIBIT 41 THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION TRANSACTION AT .ANY TIME PRIOR TO OF THIS RIGHT. MIDNIGHT OF THE SEVENTH CALENDAR DAY I liave read this Power Purchase Agreement and the Exhibits in their entirety and I acknowledge that[have received a complete copy of this Power Purchase Agreement. DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES. Owner's Name: David P Richard M4Q Signature: &,&. Date: 9/l/2016 Co-Owner's Name(if any): Signature: Date: Sunnova Energy Corporation: ynda Attaway SVP Operations Sunnova Energy Corporation Date: Contract ID: NS001 139146 12 i' 2008-2115 Smmova Energy Corporation_NI Rights Reserved. DocuSign Envelope tD:tkA515C825-2996-4A3F-A222-B5CDAOED3917 S u n nava 20 East eenwav Plaza Ste-175. t IOnstUti.T.X 77046 'i 28I.985.9900 wu°w,sunnova.com Schedule A: Value Statement Estimated Solar Energy Production Estimated First Year Annual Production: 6,399 kWh Estimated Initial Tenn Total Production: 150,743 kWh Payment Terms Amount Due at Contract Signing: S0,00 Installation Fee: 50.00 Annual Increase of Solar Energy Rate: 2.9 %/year First Year Solar Energy Rate, if paid by ACH: 50.1391 kWh First Year Solar Energy Rate, if not paid by ACH: $0.153/kWh Monthly Bill in First Year, if paid by ACH: $74.13/month Monthly Bill in Fust Year, if not paid by ACH: 581.59/month / H men Li''uls By your initials here you acknowledge that you have reviewed this Schedule A: D Pre av Option Purchase Option End of Annual Price per kWh Annual Price per kWh Estimated kWh Estimated Price to Minimum Cash Year (assuming payment by (assuming payment by per year Prepay the Remainder of Purchase Price' Credit Card) ACH) the Initial Tenn' 1 $0.153 $0.139 6.399 $16,237.44 $0.00 2 $0.157 $0.143 6367 516,113.93 $0.00 3 $0.162 $0.147 6,336 $15,961.93 $0.00 4 S0.167 $0.151 6304 515,781.71 $0.00 5 S4171 $0.156 6,272 515,566.86 $0.00 6 SO.176 $0.160 6,241 $15,317.32 $20,830.76 7 SO.182 $0.165 6,210 $15,030.78 $19,779.13 8 $0.187 $0.170 6,179 $14,706.91 $18,650.54 9 $0.192 $0.175 6,148 $14,339.04 $17,434.33 10 $0.198 $0.180 6.117 $13.926.46 $16,127.93 I1 SO.203 $0.185 6,087 $13,466.31 $14,725.72 12 S0309 $0.190 6,056 $12,957.44 S14.159.03 13 $0215 $0.196 6,026 $12,393.01 $13,533.76 14 $0.222 $0.202 5,996 S11,771.43 512,848.36 15 $0.228 $0.207 5,966 S11,089.16 $12,099-11 16 $0.235 $0.213 5,936 $10,344.01 511.283.78 17 $0.^_42 $0.220 5,906 $9,52902 $10,394.88 18 $0.249 $0.226 5,877 $8,641.50 $9.429.68 19 $0.256 $0233 5,847 $7,67706 $8,383.54 20 $0.263 $0.239 ;.818 S6,632.15 S7,252.80 21 $0271. $0.246 5,789 55,499.83 $6,030.01 22 $0.279 $0.253 5,760 $4,275.97 $4,710.89 23 $0.287 $0261 5,731 $2,955.16 $3,289.75 24 $0.295 $0.268 5,703 $1,53209 S1,76L02 25 $0.304 $0.276 5.674 1 $0.00 1 $0.00 1) Per Section 9,the price you will pay to purchase the System will be the greater of the System's fair market value("FM V") and the amount shown above on Schedule A. 2)Per Section 4(j)of the PPA,the prepayment amounts shown above reflect a 5%present value discount rate. f' 2oOa 2015 Sunno,,anergy Corp...ation.All RiehtS Resc,,ed DocuSign Envelope ID:A515C825-2996-4A3F-A222-85CDAOED3917 20 East Greenway Plaza Ste 475, 1louston.TX 7?046 su n nt/'�1va T "S l.985.9900www.sunnova.com EXHIBIT 1 LIMITED WARRANTY 1. INTRODUCTION This Limited Warranty(this"Limited Warranty")is Sunnova's agreement to provide you warranties on the System you are hosting pursuant to our PPA. The System will be professionally installed by a contractor acting on Sunnova's behalf at the address you listed in the PPA. We will refer to the installation location as your"Property or your`Home." This Limited Warranty begins when our contractor starts installing the Systemat your Home. We look forward to helping you produce clean,renewable solar power at your Home.To the extent that you prepay the PPA or purchase the S%stein during the Term of the PPA,this Exhibit 1 shall continue to apply and be enforceable until what would have been the end of the original Term. For purposes of this Limited Warranty the term"Sunnova"means Sunnova Energy Corporation or its successors and assigns. 2. LIMITED WARR4N1TEs (a) Limited Warranties Sunnova warrants the System as follows: (i) System Warranty During the entire Power Purchase Agreement Tenn,under normal use and service conditions. the System will be free from defects in workmanship or detects in,or a breakdown of, materials or components(the"System Warranty"):, (ii) Roof Warranty When our contractors penetrate your roof during- a System installation we will warrant roof damage caused by our contractors due to our roof penetrations. This roof warranty will run the longer of(A)one(1)year following the completion of the System installation; and(B)the length of any existing installation warranty or new home builder performance standard for your roof(the"Roof Warrantv Period");and (iii) Repair Promise During the entire Power Purchase Agreement Term.Sunnova will honor the System Warranty and will repair or replace any defective part,material or component or correct any defective workmanship,at no cost or expense to you (including all Tabor costs),when you submit a valid claim to its under this Limited Warranty. If our contractors damage your Home,your belongings or your Property we will cause our connectors to repair the damage they cause or pay you for the damage as described in Section 6.Sunnova may use new or reconditioned parts when making repairs or replacements. Sunnova may also,at no additional cost to you, upgrade or add to any part of the System as it deems advisable in its discretion. Cosmetic repairs that do not involve safety or performance shall be made at Sunnova's discretion. (b) Warranty Length (i) The warranties in Sections 2(a)(i)and 2(a)(iii)above will start when our contractors begin installing the System at your Home and continue through the entire Power Purchase Agreement Term but never less than ten(10)years. Thus,for as long as you host the System from Sunnova under a PPA, you will have a System Warranty and our Repair Protruse. (ii) The Roof Warranty Period may be shorter than the System Warranty,as described in Section'_'(a)(ii)above. (iii) lfyuu have assumed an existing PPA in accordance with the terns and conditions of the PPA,then this Limited Warranty will cover you for the remaining balance of the existing Power Purchase Agreement Term. Contract ID: NS001139146 5.200E-'_'OTS Sunnma Fnerw Corporation,-U1 Right,Re3en ed_ DocuSign Envelope ID:A515C825-2996-4A3F-A222-B5CDAOED3917 sun ���^ 20 East (ireurway Plaza Ste 475. Houston, 'CX 77046 Gill T 23 L985.9900 wwwsunnova.corn (c) Maintenance and Operation General When the System is installed Sunnova will provide you with a copy ol'its Solar Operation and Maintenance Guide.This Guide provides you with System operation and maintenance instructions,answers to frequently asked questions, troubleshooting tips and service information. (ii) Power Monitor 'rhe Power Monitor requires access to cellular networks in order to operate. If cellular service is not available then(A)we will not be able to monitor the System; and(B)you will be required to provide Sunnova with annual production information from your inverter or(C)Sunnova,in its sole discretion,will estimate production. In connection with such any such estimateti production by Sumiova,Sunnova will make commercially reasonable methods to estimate the missing kWh based on available information and such estimate will be included in the calculations under Exhibit A for such period. In the event that no such information is reasonably accessible,SU1111Oya will make the adjustment based on the original kWh expectation attributable to such period. (d) Making a Claim;Transferring this Warranty (i) Claims Process You can make a claim by: A. emailing us at the email address in Section 7 below; B. as iting us a letter and sending it overnight mail with a well-known service; C. sending us a fax at the number in Section 7 below;or D. creating a claim through our online customer portal(,as more particularly set forth in the Solar Operation and Maintenance Guide when the System is insialled). (it) Transferable Limited Warranty Sunnova will accept and honor any valid and properly submitted Warranty claim made during any Tenn by any person who either purchases the System from you or to whom you property transfer the PPA in accordance with the terms and conditions contained in the PPA. (e) Exclusions and Disclaimer 'I he limited warranties provided in this Limited Warranty do not apply to any lost power production or any repair, replacement or correction required due to the following: (i) someone other than Smmova or its approved service providers installed,removed, re-installed or repaired the System: (it) destruction or damage to the System or its ability to safely produce power not caused by Sunnova or its approved service providers while servicing the System(e.g., if a nee falls on die System we will replace the System per the Power Purchase Agreement,but we will not repay you for power it did not produce); (iii) your failure to perform,or breach of,your obligations under the Power Purchase Agreement(e.g.,you modify or alter the System); (iv) your breach of this Limited Warranty, including your being unavailable to provide access or assistance to as or our contractors in diagnosing or repairing a problem,or your failing to maintain the System as stated in the Solar Operation and Maintenance Guide; (v) any Force Majeure Event(as defined below); Contract ID: NS001139146 2110E 2015 Sunnova Energy Corpo,ation.All Right,Reaei�ed. DocuSign Envelope ID:A515C825-2996AA3F-A222-B5CDAOED3917 ���^ 20 hast Greenway Plaza Sle 475- Houston,l;Y 77046 sunC`.AI T 23193990P wwwsunnovucom (vi) shading from foliage that is new growth or is not kept rritmned to its appearance on the date the System was installed; (vii) any system failure or lost production not caused by a System defect(e.g.,the System is not producing power because it has been removed to make roof repairs or you have required its to locate the inverter in a non-shaded area);and (viii) theft of the System(e.g.,if the System is stolen we will replace the System per the Power Purchase Agreement,butwe will not repay you for the power it did not produce). (ix) a power or voltage surge caused by someone other than Sunnova or the Installer, including a grid supply voltage outside of the standard ranee specified by the local utility or the System speci ficat ions or as a result of a local power outage or curtailment;and (x) a change in usage of the Property or any buildings at m near such Property that may affect insolation without Sunnova's prior written.approval. This Limited Warranty gives you specific rights,and you may also have other rights which vary from state to state.This Limited Warranty does not warrant any specific electrical performance of the System. THE LIMITED WARRANTIES DESCRIBED IN SECTION 2(1)ABOVE ARE THE ONLY WARRANTIES MADE BY SUNNOVA WITH RESPECT TO THE SYSTEM. SUNNOVA HEREBY DISCLAIMS, AND ANY BENEFICIARY OF THIS LIMITED WARRANTY HEREBY WAIVES, ANY WARRANTY WITH RESPECT TO ANY COST SAVINGS FROM USING THE SYSTEM. WITHOUT LIMITING TILE FOREGOING"ri-IERE ARE NO OTHER REPRESENTATIONS OR WARRANTIES,EXPRESS OR IMPLIED,AS TO THE MERCHANTABILITY,FITNESS FOR ANY PURPOSE,CONDITION,DESIGN;CAPACITY;SUITABILITY OR PERFORMANCE OF THE SYSTEM OR ITS INSTALLATION. 3. SUNNOVA'S STANDARDS For the purpose of this Limited Warranty the standards for our performance will be(i)normal professional standards of performance within the solar photovoltaic power generation industry in the relevant market;and(ii) Prudent Electrical Practices. "Pnrdent Electrical Practices"means those practices,as changed from time to time,that are engaged in or approved by a significant portion of the solar power electrical generation industry operating in the United States to operate electric equipment lawfully and with reasonable safety,dependability,efficiency and economy. 4. SYSTEM RFIPAIR,1tELOCA'I'ION OR REMOVAL ('a) You agree that if(i)the System needs any repairs that are not the responsibility of Sunnova under this Limited Warranty,(ii) the system needs to be removed and reinstalled to facilitate remodeling of your Home or(iii)the system is being relocated to another home you own pursuant to the Power Purchase Agreement,you will have Sunnova,or another qualified service provider we approve,at your expense,perform such repairs,removal and reinstallation,or relocation on a time and materials basis. (b) If you want to return the System to Sunnova under Section 16 of the Power Purchase Agreement then Sunnova will cause our contractors to remove the System at no cost to you. Sunnova will cause our contractors to remove the posts,waterproof the post area and return the roof as close as is reasonably possible to its original condition betore the System was installed(e.g. ordinary wear and tear and color variances due to manufacturing changes are excepted). Sunnova will warrant the waterproofing for one(1)year atter it removes the System. You agree to reasonably cooperate with Sunnova or its contractors in removing the System including providing necessary splice,access and storage,and we or our contractors will reasonably cooperate with you to schedule removal in a time and manner that minimizes inconvenience to you. 5. FORCE MAJECRE If Sunnova is unable to perform all or some of its obligations under this Limited Warranty because of Force Majeure Event, Sunnova will be excused from whatever performance is affected by the Force Majeure Event.provided that: Contract ID: NS001139146 •rS 20OS-201i Sunnova Energy Cwpor cion.All Right Resal'�ed- DocuSign Envelope ID:A515C825-2996-4A3F-A222-B5CDAOED3917 sun ��` ,^ 20 -as( Grm;nway Plaza Sic 475,Houston, LY 77046 V a T 281.985.9900 wwwsunoova.eool . (a) Sunnova,as soon as is reasonably practical, s2ives you notice describing the Force Majeure Event; (b) Sunnova's suspension of its obligations is of no greater scope and of no longer duration than is required by the Force Majeure Event(i.e., when a Force Majeure Event is over,we will make repairs);and (c) No Sunnova obligation that arose before the Force Majeure Event that could and should have been fully performed before such Force Majeure Event is excused as a result orsuch Force Majeure Event. "Force Majeure Event"means any event,condition or circumstance beyond the control of and not caused by Sunnova's fault or negligence. It shall include. without limitation, failwe o-interruption of tile production,delivery or acceptance of power due to:an act of god; war(declared or undeclarekl);sabotage;riot;insm-reetion:civil unrest or disturbance:military or guerilla action;terwrisnn; economic sanction or embargo;civil strike,work stoppage,slow-down,orlock-out:explosion;tire:earthquake;abnormal weather condition or actions of the elements:hurricane; flood;lightning; wind;drought;the binding order of any governmental authority (provided that such order has been resisted in good faith by all reasonable legal means);the Failure to act on the part orally governmental authority(provided that such action has been timely requested and diligently pursued):unavailability of power from the utility grid,equipment,supplies or products that not to the extent that any such availability of any of the foregoing results from Sunnova's failure to have exercised reasonable diligence);power or voltage surge caused by someone other than Sunnova including a grid supply voltage outside of the standard range specified by your utility;and failure of equipment not utilized by Sunnova or under its control. 6. LIMTFA1IONS ON LIABILITY (a) No Consequential Damages IN NO EVENT SHALL SUNNOVA OR ITS AGENTS OR CONTRACTORS BE LIABLE TO YOU OR YOUR ASSIGNS FOR SPECIAL,1NDDLECT,PUNITIVE, EXEMPLARY,INCIDENTAL OR CONSEQUENTIAL DAMAGES OF ANY NATURE. SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES,SO THE ABOVE LIMITATIONMAY NOT APPLY TO YOU. (b) Limitation of Duration of Implied Warranties IN THE EVENT THAT ANY IMPLIED WARRANTIES,INCLUDING THE IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE AND MERCHANTABILITY ARISING UNDER STATE LAW THAT CANNOT BE WAIVED,SUCH WARRANTIES SHALL IN NO EVENT EXTEND PAST THE EXPIRATION OF ANY WARP—ANTY" PERIOD IN THIS LIMITED WARRANTY. SOME STATES DO NOT ALLOW LIMITATIONS ON HOW LONG AN IMPLIED WARRANTY LASTS,SO TL-IE ABOVE LIMITATION MAY NOT APPLY TO YOU. (c) Limit of Liability Notwithstanding any other provision of this Limited Warranty to the contrary.Sunnova's total liability arising out of or relating to this Limited Warranty shall in no event: (i) For Svstera Replacement:the original cost of the System;and (ii) For damages to your Hone,Belongings and Property: exceed five hundred thousand dollars($500.000). 7. NOTICES All notices under this Limited Warranty shall be made in the same manner as set forth in the Power Purchase Agreement to the addresses listed below: TO SUNNOVA: Sunnova Energy Corporation P.O.Box 56229 Houston,TX 77256-6229 Attention: Warranty Claims Telephone: 281.98 5.9900 Contract ID: N S001 13914620oA-'_01 S Sunno.Yi Brer�ry Co�pomrion.:ll ftwhts Reser.ed. DocuSign Envelope ID:A515C825-29964A3F-A222-B5CDAOED3917 30 East (itecnway Plaza Ste 4-'5. Houston, I X 77046 S U n nI/'� va T 281.989.9900 WW w.SLloa0Vae0n1 Facsimile: 28 1-985.9907 Email: customerservicefn2sunnova.com TO YOU: At the billine address in the Power Purchase Agreement or any subsequent billing address you give us. 8. ASSIGNII[ENT AND TRANSFER OF THIS LIMITED WARRANTY Sunnova may assign its rights or obligations under this Limited Warranty to a third patty without your consent,provided that ally assignment of Sunnova's obligations tinder this Limited Warranty shall be to a party professionally and financially qualified to perfonn such obligation. This Limited Warranty protects only the person who hosts the System. Your rights and obligations under this Limited Warranty will be automatically transferred to any person who purchases the System from you or to whom you properly transfer the Power Purchase Agreement in accordance with the terms and conditions contained in the PPA.This Limited Warranty contains the parties' entire agreement regarding the limited warranty ofthe System. Contract ID: NS001139t46 20oS 201 i Suon %a Energy Corpoiation—All Rights lteseraed. DocuSign Envelope ID:A515C825-299611A3F-A222-B5CDAOED3917 sunnw 20 East Greenway Plaza Ste 475.J loT )vaustun, X 77046 ( T 2B LyB5.9900 unrw.vunnovacom - (CUSTOMER COPY) NOTICE OF CANCELLATION STATUTORILY-REQUIRED LANGUAGE Date of Transaction: You may cancel this transaction, without any penalty or obligation. within three business days from the above date. If you cancel. any property traded in,any payments made by you under the contract or sale and any negotiable instrument executed by you will be returned within 10 days following receipt by the seller(Sunnova Energy Corporation)of your cancellation notice, and any security interest arising out of the transaction NN ill be canceled. If you cancel,you must make available to the seller(Sunnova Energy Corporation) at your residence,in substantially as good condition as when received, any goods delivered to you under this contract or sale.or you may, if you wish,comply with the instructions of the seller(Sunnova Energy Corporation)regarding the return shipment of the goods at the seller's(Sunnova Energy Corporation's)expense and risk. if you do make the goods available to the seller (Sunnova Energy Corporation)and the sellar(Sunnova Energy Corporation)does not pick them up within 20 days of the date of your notice of cancellation,you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller(Sunnova Energy Corporation),or if you agree to return the goods to the seller(Sunnova Energy Corporation)and fail to do so, then you remain liable for performance of all obligations under the contract. To cancel this transaction,mail or deliver a signed and dated copy of this cancellation notice,or any other written notice, or send a telegram to Sunnova Energy Corporation, 20 East Greenway Plaza Ste 475.Houston,TX 77046 not later than midnight of the date that is 3 business days from the date you signed the Lease. I hereby C:\NCEURESCIND this transaction on [Cancellation Datel. Owner's Signature: David Richard Co-Owner's Signature: Installation Address: 1 VICTORY RD SALEM, All 01970-5629 Contract ID: NSOO 1139146 S2008=015 Sunnova Frier Copp ration.All Kighls Reserved. DocuSign Envelope ID:A515CB25-2996-4A3F-A222-B5CDAOED3917 ^` ,^ 20 East Greenway Plaza Ste 475. Houston,TX 7704b sunn( ,V a ' T 23 L985 990(1 wwwsunnovs.com (SUNNOVA COPD NOTICE OF C kNCELLATION STATUTORILY-REQUIRED LANGUAGE Date of Transaction: You may cancel this transaction, without any penalty or obligation. within three business days from the above date. if you cancel.any property traded in, any payments made by you under the contract or sale and any negotiable instrument executed by you wilt be returned within 10 days Following receipt by the seller(Sunnova Energy Corporation)of your cancellation notice,and any security interest arising out of the transaction will be canceled. If you cancel,you must make available to the seller(Sunnova Energy Corporation)at your residence,in substantially as goad condition as when received,any goods delivered to you under this contract or sale,or you may,if you wish,comply with the instructions Of the seller(Sunnova Energy Corporation)regarding the return shipment of the goods at the seller's(Sunnova Energy Corporation's)expense and risk. If you do make the goods available to the seller (Sunnova Energy Corporation)and the seller(Sunnova Energy Corporation)does not pick them up within 20 days of the date of your notice of cancellation,you may retain or dispose of the goods without any further obligation. If you ficil to make the goods available to the seller(Sunnova Energy Corporation),or if you agree to return the_Pods to the seller(Sunnova Energy Corporation) and fail to do so, then you remain liable for performance of all obligations under the contract. 'Po cancel this transaction,mail or deliver a signed and dated copy of this cancellation notice,or any other written notice, or send a telegram to Sunnova Energy Corporation,20 East Greenway Plaza Ste 475,Houston,TX 77046 not later than midnight of the date that is 3 business days from the date you signed the Lease. 1 hereby CANCELBESCIND this transaction on )Cancellation Datel. Owner's Signature: David Richard Co-Owner's Signature: Installation Address: 1 VICTORV RD SALEM,MA 01970-5629 - Contract ID: NS001139146 r-2005201s Sunuoca Fner_y Corporation-All Kighis Reservni. DocuSign Envelope ID:A515C825-29964A3F-A222-65CDAOED3917 E STATE SPECIFIC EXCEPTIONS,TERMS AND CONDITIONS Massachusetts The following provisions are hereby agreed to by Sunnova and you Anticipated Start and Completion dates of the construction of the System: The time between evaluation of your home for it System,and your completed System generating power,will vary depending on a number of factors—some outside the control of Sunnova and any contractors. These factors include the process f6i obtainine the necessary building permits and utility approval for net metering and interconnection of your System. While the timeline will vary depending on these and other factors,the estimated time for completion of a System is between 60 and 210 days. Resistration: All home improvement contractors and subcontractors shalt be registered. Any inquiries about a contractor or subcontractor relating to a registration should be directed to: Office of Consumer Affairs and Business Regulation Ten Park Plaza,Suite 5170 Boston,MA 02116 Phone: (617)973-8700 Permits: Contractor shall obtain any and all necessary construction-related permits. Owners who secure their own construction-related permits or deal with unregistered contractors shall be excluded from access to the Guarantee Fund. Arbihation: The signatures of the parties to the arbitration provision apply only to the agreement of the parties to alternate dispute resolution initiated by the contractor. The owner may initiate alternative dispute resolution even where the arbitration section is not signed separately by the parties. ,O 2009-'-015 Sunnma Pnergy Cgin...anon,All 16gas lieserncd_ DocuSign Envelope ID:A515C825-2996-4A3F-A222-85CDAOED3917 E.XHI`BIT 3 TRANSFER AGREEMENT KNOW ALL MEN BY THESE PRESENTS: , an individual ("Transferor") hereby, TRANSFERS, ASSIGNS and CONVEYS unto an individual ("Transferee"),all of his/her right,, title and interest (including any warranties) in and to that certain Power Purchase Agreement dated _. 20 ,for the System located at as the same may have been amended from time to time ('collectively, the"Power Purchase Agreement"). As evidenced by its execution hereof,Transferee hereby accepts the transfer of the Power Purchase Agreement and hereby assumes all duties obligation and liabilities of every kind and character, including entering into net metering and interconnection agreements, of the'fransferorLinder the Power Purchase Agreement. This Transfer may be executed simultaneously in any number of counterparts. Each counterpart shall be deemed to be an original, and all such counterparts shall constitute one and the same instrument. The parties agree that this Transfer may be signed electronically and transmitted between them by Facsimile or by electronic mail and that electronic,taxed and PDF signatures shall constitute original signatures and that an electronic, faxed or PDF signature is binding upon the parties. Capitalized terms not defined herein shalt have the meaning set Forth in the Power Purchase Agreement. IN WITNESS WHEREOF,the parties have executed this instrument to be effective —, 20—. TRANSFEROR: TRANSFEREE: [NAME] [NAME] AGREED AND ACCEPTED, the undersigned consents to the transfer provided herein. SUNNOVA ENERGY CORPORATION By: Name: Title: rc�2008-201�S.nno�a Energy Crnpornhion.All Rights Rrsvvvi Commonwealth of Massachusetts / P 9 V itv of Salem I , 1 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 / Return card to Building Division for Certificate of Occupancy �\ - Permit No. B-16-1125 PERMIT TO BUILD FEE PAID: $140.00 DATE ISSUED: 10/6/2016 , This certifies that RICHARD DAVID has permission to erect, alter, or demolish a building _ _1-VICTORY,ROAD .. Map/Lot: 420056-0 as follows: Solar Panels INSTALLATION OF ROOF MOUNTED PHOTOVOLTAIC SOLAR SYSTEM (19 PANELS @ 5.415kW) A Note: Trinity Letter dated 10/19/16 decreases panels & kW to 14 panels @ 3.99kW. Letter w/permit ap & st. file. -- - 1 Contractor Name: GREGG LACASSE l 1 DBA: TRINITY HEATING &AIR, INC. Jl Contractor License No: 103631 J 10/6/2016 t Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. 1 All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. 1 , All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. f The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. HIC#: 170335 "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. ��➢N➢LTA Commonwealth of Massachusetts / f Citv of Salem C 9 a 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 1. Return card to Building Division for Certificate of Occupancy Structure CITY OF SALEM BUILDING PERMIT PERMIT TO BE POSTED IN THE WINDOW ` Excavation Footing INSPECTION RECORD Foundation Framing Mechanical Insulation INSPECTION: BY DATE Chimney/Smoke Chamber ` Final � Plumbing/Gas r Rough:Plumbing Rough:Gas Final AF Z Electrical Service Rough Final Fire Department Preliminary f t r Final Health Department Preliminary Final ` ", ... S 161bOCT 21 A1D21 SOLAR October 19, 2016 Salem Building Department 120 Washington St. 3`d floor Salem, MA 01970 To Whom It May Concern: I am writing to you in regards to the building and electrical permits we recently received for the solar installation at 1 Victory Rd. The permits were issued for a 5.415kW solar system with 19 panels. The homeowner has opted for a smaller system—a decrease of 15 panels. The new system being installed is 3.99kW, 14 panels. Thankyou, Brittany Nunes Permitting Specialist Trinity Solar 20 Patterson Brook Rd. Unit 1 Wareham, MA 02576 (508) 291-0007 x1225 brittany.nunes@trinitysolarsystems.com