Loading...
UTS Job 23418 Report 44 Compressive Strength Report - Concrete 09-25-2019 (002)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-25-2019Compressive Strength Report - Concrete Report No.44 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"No. Of Sets: 5 251CUBIC YARDS: SET 1 LOCATION:SOD; Level 2, Building 2: Column Line L at 3 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type V521 4.00 x 8.00 12.57 Good 09/25/19 10/02/19 7 32,000 2,550 3 V522 4.00 x 8.00 12.57 Good 09/25/19 10/09/19 14 53,000 4,220 5 V523 4 x 8 12.57 Good 09/25/19 10/23/19 28 V524 4 x 8 12.57 Good 09/25/19 10/23/19 28 V525 4 x 8 12.57 Good 09/25/19 10/23/19 28 Slump (in.)6 Air Temp. (F.)55 Conc Temp (F)75 Truck No.252 Ticket No.2161 Time 7:15 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:SOD; Level 2, Building 2: Column Line 11 at 6 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type V516 4.00 x 8.00 12.57 Good 09/25/19 10/02/19 7 34,000 2,700 3 V517 4.00 x 8.00 12.57 Good 09/25/19 10/09/19 14 49,000 3,900 2 V518 4 x 8 12.57 Good 09/25/19 10/23/19 28 V519 4 x 8 12.57 Good 09/25/19 10/23/19 28 V520 4 x 8 12.57 Good 09/25/19 10/23/19 28 Slump (in.)5 1/2 Air Temp. (F.)52 Conc Temp (F)74 Truck No.255 Ticket No.2169 Time 8:10 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:SOD; Level 2, Building 2: Column Line F at 12 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type V506 4.00 x 8.00 12.57 Good 09/25/19 10/02/19 7 30,000 2,390 1 V507 4.00 x 8.00 12.57 Good 09/25/19 10/09/19 14 51,000 4,060 4 V508 4 x 8 12.57 Good 09/25/19 10/23/19 28 V509 4 x 8 12.57 Good 09/25/19 10/23/19 28 V510 4 x 8 12.57 Good 09/25/19 10/23/19 28 Slump (in.)6 Air Temp. (F.)60 Conc Temp (F)74 Truck No.243 Ticket No.2178 Time 8:50 Unit Wt lbs/cu ft Air Content (%) SET 4 LOCATION:SOD; Level 2, Building 2: Column Line C at 17 Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-25-2019Compressive Strength Report - Concrete Report No.44 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type V511 4.00 x 8.00 12.57 Good 09/25/19 10/02/19 7 33,000 2,630 2 V512 4.00 x 8.00 12.57 Good 09/25/19 10/09/19 14 55,000 4,380 5 V513 4 x 8 12.57 Good 09/25/19 10/23/19 28 V514 4 x 8 12.57 Good 09/25/19 10/23/19 28 V515 4 x 8 12.57 Good 09/25/19 10/23/19 28 Slump (in.)6 1/2 Air Temp. (F.)63 Conc Temp (F)72 Truck No.253 Ticket No.2186 Time 10:10 Unit Wt lbs/cu ft Air Content (%) SET 5 LOCATION:SOD; Level 2, Building 2: Column Line F at 18.1 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type V501 4.00 x 8.00 12.57 Good 09/25/19 10/02/19 7 36,000 2,860 2 V502 4.00 x 8.00 12.57 Good 09/25/19 10/09/19 14 53,000 4,220 3 V503 4 x 8 12.57 Good 09/25/19 10/23/19 28 V504 4 x 8 12.57 Good 09/25/19 10/23/19 28 V505 4 x 8 12.57 Good 09/25/19 10/23/19 28 Slump (in.)6 1/2 Air Temp. (F.)65 Conc Temp (F)72 Truck No.243 Ticket No.2194 Time 11:10 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders Received 9-27-19. Early Morning Rate: 6:00-7:00AM Inspector Premium Travel Name Time Hours Time D. Montello No Max Day 1 Hr(s) Reggie Cavarretta No Max Day 1 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-25-2019Compressive Strength Report - Concrete Report No.44 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-25-2019Compressive Strength Report - Concrete Report No.44 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan FIELD SUMMARY REPORT Total Pour:SOD; Level 2, Building 2: Column Line A-L at 1-20 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat None OtherX Slump Specification (in.)4-7 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 5 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-25-2019 Report No.44 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment UTS of Massachusetts, Inc. Page 6 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-25-2019 Report No.44 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment