UTS Job 23418 Report 59 Soil Inspection Report 09-25-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-25-2019Soil Inspection Report
Report No.59
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Partly cloudy 60-70°
TIME:7:00 AM
CONTACT:Bob Levesque of Fulcrum Associates
PURPOSE:Observe earthwork construction
EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate
Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller
TEST METHOD:Sand Cone Nuclear Densometer
TITLE:Inspector Staff Engineer EngineerX
OBSERVATIONS:
This report follows a site visit to observe/test the earthwork for: Footing trench excavation.
Pavement sub grade prep continued @ the WSW side of building 2 near the construction trailer. A
full depth pavement sub grade cut was performed at this location. The area was cut to an approximate
depth of 15" below FG. The exposed sub grade stratum was proof compacted employing several passes of
coverage utilizing the IR 10 ton drum roller exhibiting stable/firm conditions. A 12" thick layer of
imported reprocessed gravel from the Caruso pit was placed and graded. The gravel was compacted
utilizing the IR drum roller exhibiting stable/firm conditions. The Material was moisture conditioned
as necessary to facilitate compaction efforts. The material generated from the sub grade cut at this
location was transported to pavement sub grade fill locations at the north side of building 1. This
material is select bank gravel type onsite soil generally consisting of F - C sand, some gravel, trace
silt. A 12 - 16" thick lift was placed and graded utilizing the Deere bulldozer. This soil was
supplemented with some onsite generated urban fill (common fill). The fill was compacted utilizing the
IR 10 ton roller exhibiting stable/firm conditions.
Inspector Premium Travel
Name Time Hours Time
M. Chace No 8.00 1 Hr(s)
REVIEWED BY:Chuck Fraser
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-25-2019Soil Inspection Report
Report No.59
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
DSF Flint Salem LLC Dimitri Kourtis
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-25-2019
Report No.59
Job Number 23418
Project Halstead Salem Station, 72 Flint Stree
Salem, MAAttachment
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-25-2019
Report No.59
Job Number 23418
Project Halstead Salem Station, 72 Flint Stree
Salem, MAAttachment