Loading...
UTS Job 23418 Report 59 Soil Inspection Report 09-25-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-25-2019Soil Inspection Report Report No.59 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 60-70° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Pavement sub grade prep continued @ the WSW side of building 2 near the construction trailer. A full depth pavement sub grade cut was performed at this location. The area was cut to an approximate depth of 15" below FG. The exposed sub grade stratum was proof compacted employing several passes of coverage utilizing the IR 10 ton drum roller exhibiting stable/firm conditions. A 12" thick layer of imported reprocessed gravel from the Caruso pit was placed and graded. The gravel was compacted utilizing the IR drum roller exhibiting stable/firm conditions. The Material was moisture conditioned as necessary to facilitate compaction efforts. The material generated from the sub grade cut at this location was transported to pavement sub grade fill locations at the north side of building 1. This material is select bank gravel type onsite soil generally consisting of F - C sand, some gravel, trace silt. A 12 - 16" thick lift was placed and graded utilizing the Deere bulldozer. This soil was supplemented with some onsite generated urban fill (common fill). The fill was compacted utilizing the IR 10 ton roller exhibiting stable/firm conditions. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-25-2019Soil Inspection Report Report No.59 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-25-2019 Report No.59 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-25-2019 Report No.59 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment