UTS Job 23418 Report 61 Soil Inspection Report 09-27-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-27-2019Soil Inspection Report Report No.61 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 60-70° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Pavement base course preparation was performed @ the west side of building 2. Sub grade elevation (15" below FG) was previously achieved. A layer of geogrid was placed over the sub grade. The pavement base course gravel used is 1 1/2" reprocessed material from the Caruso pit in Revere, MA. A 12" thick lift was placed and graded utilizing the Deere bulldozer. The gravel was compacted utilizing the IR drum roller exhibiting stable/firm conditions Installation of gas main utilities continued. The trench was carried down to design elevation utilizing the Deere excavator. A base of clean imported sand was placed at the bottom of the excavation. The fused plastic gas piping and tracer were installed by national grid. The piping was bedded and covered in clean imported sand. Tape was used over the sand. The shallow trench was backfilled using the same gravel generated during excavation. The surface of the trench was compacted utilizing the Wacker plate compactor exhibiting stable/firm conditions. Footing trench excavation was performed for a small section of foundation near the elevator pit of building 1. The trench was excavated to design elevation utilizing the Deere 450 excavator equipped with a flat cutting edge (flared teeth) to minimize sub grade disturbance. Ground improvements were previously completed in this area by installing GCC deep foundation elements. The elements were previously excavated to design cutoff elevation. The area was over excavated a minimum 6" below design BOF elevation to provide a cushion/base of material between the elements and the footing. All GCC elements were carefully located and exposed during excavation. The sub grade soil in this area is either compacted structural fill or urban fill containing wood, ash, brick, slag etc. A 6 - 12" thick Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-27-2019Soil Inspection Report Report No.61 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates layer of ¾" crushed stone was placed and graded. The sub grade and surface of the stone was compacted utilizing the heavy plate compactor exhibiting stable/firm conditions. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY: Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-27-2019 Report No.61 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-27-2019 Report No.61 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment