Loading...
UTS Job 23418 Report 38 Compressive Strength Report - Concrete 09-09-2019 (004)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-09-2019Compressive Strength Report - Concrete Report No.38 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4" *No. Of Sets:2 62CUBIC YARDS: SET 1 LOCATION:Footing; Column lines 1 at J.1 - K, building 1 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type P030 4.00 x 8.00 12.57 Good 09/09/19 09/16/19 7 29,500 2,350 1 P031 4.00 x 8.00 12.57 Good 09/09/19 09/23/19 14 40,000 3,180 2 P032 4.00 x 8.00 12.57 Good 09/09/19 10/07/19 28 57,000 4,530 5 P033 4.00 x 8.00 12.57 Good 09/09/19 10/07/19 28 58,500 4,650 3 P034 4.00 x 8.00 12.57 Good 09/09/19 10/07/19 28 56,000 4,460 4 Slump (in.)5 Air Temp. (F.)70 Conc Temp (F)74 Truck No.238 Ticket No.1407 Time 1:00 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Footing; Column lines 1 at L - L.4, building 1 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type P035 4.00 x 8.00 12.57 Good 09/09/19 09/16/19 7 30,500 2,430 2 P036 4.00 x 8.00 12.57 Good 09/09/19 09/23/19 14 40,500 3,220 1 P037 4.00 x 8.00 12.57 Good 09/09/19 10/07/19 28 54,000 4,300 4 P038 4.00 x 8.00 12.57 Good 09/09/19 10/07/19 28 57,500 4,570 4 P039 4.00 x 8.00 12.57 Good 09/09/19 10/07/19 28 58,000 4,610 2 Slump (in.)5 Air Temp. (F.)70 Conc Temp (F)75 Truck No.233 Ticket No.1416 Time 4:30 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Amended report 9-18-19, added building location. Cylinders received on 09/11/19. *MRWR Inspector Premium Travel Name Time Hours Time Frank Toughill No Min Day 1 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-09-2019Compressive Strength Report - Concrete Report No.38 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-09-2019Compressive Strength Report - Concrete Report No.38 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan FIELD SUMMARY REPORT Total Pour:Footing; Column lines 1 at J.1 - K, building 1 Method of Placement:Pump Chute Discharge Bucket OtherXX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat None Other Slump Specification (in.)5 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-09-2019 Report No.38 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment