38 OCEAN AVE - BUILDING INSPECTION 3<s3h
The Commonwealth of Massachusetts FOR
Board of Building Regulations and Standards n Ito F r RL�IIDIft('IPj 1*
�o Massachusetts State Building Code,780 CMR,7h edition Lv USE
Revised
(yam Building Permit Application August, 2012
This Section For Official Use Only
Building Permit Number- Date Applied: l
v
Signature: '+
n Building Inspector V Date
SECTION 1:SITE INFORMATION
Residential Commercial ❑ Other Description:
1.1 P operty Address: I 1 1.2 Assessors Map&Parcel Numbers
3o(e-cAn cup— Sen
l.la Is this an accepted street? yes_ no Map Number Parcel Number
1.3 Zoning Information: 1.4 Property Dimensions:
Zoning District Proposed Use Lot Area(sq ft) Frontage(ft)
1.5 Building Setbacks(ft)
Front Yard Side Yards Rear Yard
Required Provided Required Provided Required Provided
1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System:
Public❑ Private❑ Zone: Outside Flood Zone?
Municipal E3 On site disposal system C3_
Commercial- Service Size Check if yes❑
SECTION 2: PROPERTY OWNERSHIP'
2.1 Owner of Record:
`tAc"r4 Moro}tJ 38 N-eCGY1 GtvL-
Name(Print) Address for Service:
con fru Ck 781-)76=-SI-)
ISI Signature Telephone E-Mail Address
SECTION 3:DESCRIPTION OF PROPOSED WORW(cheek all that apply)
New Construction❑ Existing Building❑ Owner-Occupied ❑ 1 Repairs(s) ❑ 1 Alteration(s) ❑ 1 Addition ❑
Demolition ❑ Accessory Bldg.❑ Number of Units_ Other Lpecify: �io10.(`
Brief Description of Proposed Work: urfcA. e,yl
Coyin GG1- 1-0 exi5h-nc,
SECTION 4:ESTIMATED CONSTRUCTION COSTS
Item Estimated Costs: Official Use Only
Labor and Materials
1.Building S iO , $8O 1. Building Permit Fee:$
2.Electrical $ ) O 2. Indicate how fee is determined:
❑Standard City/Town Application Fee
3.Plumbing S ❑Total Project Costs(Item 6)x multiplier x
4.Mechanical (HVAC) S 3. Other Fees: $
5.MechanicalS List: c i
Fire Suppression)
Total All Fees:$
6.Total Project Cost: S 3 a 0 C-)0 Check No._Check Amount: Cash Amount:_
rnaa � L-' C t(o
SECTION 5: CONSTRUCTION SERVICES
5.1 Licensed Construction Supervisor(CSL)
1062112 2J'&L+. 2018
SOScl h\ VLLC.Cd co License Number Expiration Date
Name of CS1,Fielder 1 �t V
Wo rj t\ny Si&c At/e,W;O (r')Mff List CSL
Address �� Type Description
V4(e-�y U Unrestricted(up to 35,000 Cu.Ft.
Signatuff R Restricted Ibt2 Family Dwelling
78I- 276-6S55- M Masonry Only
. . RC Residential Roofing Coveting
Telephone WS Residential Window and Siding
.�oe•Vox carOla,R2V01VSurl-C "1 SF Residential Solid Fuel Burning AppliariceInstallation
E-mail Address D Residential Demolition
5.2 Registered Home Ira rovement C ntractor HIC) 7S3 X37
Morth Wr u1te o
HICCoin Name or HIC Registrant ame Registration Number
I tdtafti4. iwL .Ske ra tc1 on MA 01803 iS MSR 201$
Address /
2e 7g('276'tsoSSs Expiration Date
Signalwf Telephone
Noe.Vc.cc.aen Revoklsvr\•&Y--%
E-mail Address
SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L,c.152.§ 25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide
this affidavit will result in the denial of the issuanc.94f the building permit.
Signed Affidavit Attached? Yes..........V No...........0
SECTION Tai OWNER AUTHORIZATION TO BE COMPLETED WHEN
OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
I, �,
"1 G(-� M V(- f 1-\y , as Owner of the subject property hereby
authorize f IV6rthf&si .Se rvi to f to act on my behalf,in all matters
relative to work authorized by this building permit application.
Ccon)Cue-�— 8/u /l�
Signature of Owner Date
SECTION 7b:OWNER'OR AUTHORIZED AGENT DECLARATION
I Jae vC c u ro as Owner ortt of gent hereby declare that
the statemennd infoj motion on the foregoing application are true and accurate,to the best of my knowledge and behalf.
Signore of Owner or Authorized Agent Datelf
(Signed under the pains and penalties of perjury)
NOTES:
I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor
(not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program
or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program and Construction
Supervisor Licensing(CSL)can be found in 780 CMR Regulations 110.116 and 110.115,respectively:
2. When substantial work is planned,provide the infonnation below:
Tota(floors area(Sq.Ft.) (including garage,finished basemenNattics,decks or porch)
Gross living area(Sq. Ft.) Habitable room count
Number of fireplaces Number of bedrooms
Number of bathrooms Number of hali7baths
Type of heating system Number of decks/porches
Type of cooling system Enclosed Open
The Cottrniotrtveol/h ofMassaelatsells
Depnt•Intent of herirrstrlal Aceldents
Of•/lee oflnvesilgntlons
' I Congress Sri-eel,Seise 100
Bosloti,MA 02114-2017
rvwrxlnnssgoP/din
Workers'Coinpeosation Insurance Aflidavit: Bulitters/Contractors/Electricians/Pinmbers
AuDlicaut Information Please Print Leeiblr
Name(au,tnesslorgenhalfo,Jlnd;vidual):Northeast Soler Services Inc
Address:i North Ave Suite A
Ci /State/Zi ;Burlington/MA/01803 Phone#:781.270-0865
Are you an employer?Ctreek the appropriate box: Type of project(required):
1. ✓❑ I an a employer with 12 4. ❑ 1 am a general contractor and t
employees(Rill and/or part-time).* have hired the sub-contractors 6. ❑Now construction
2.❑ 1 am a sole proprietor or partner• listed on the attached sheet. 7. ❑Remodeling
ship and have no employees Tlieso sub-contractors have 8. ❑Demolition
workingfor me in an capacity. employees and have workers'
Y M ty• t 9. []Building addilion
[No required.)
workers'comp.Insurance We are a corporation
l0 Electrical repairs or additions
required) S. ❑ We are a corporation and its ❑
3.❑ 1amahomeowner doing all tvork officers have exercised their I1.❑Plumbing repairs oradditions
myself.lNo workers'comp. right of exemption per MOL I2.❑Roof repairs
insurance required,)t c.152,¢1(4),and we have no So1af PV
employees,(No workers' 13.0 01her
comp.insurance require .
'Any applicant that checks box#I mustaiso rill out the sectlon belotvshowing Melt workers'eampamation policy btfonnalloa
t Homeonmers uvlw submil Ihh affidavit indkiling they me doingell mik end then hire culddg eontraetom must submit anew emdavil htdicaenssuch.
IContraetorsthat check Ads box must attached an additional suet showing the nate otdte sub•convaims and slate whetheror not sure entitles have
employee& Ifthe sub-contractors have employees,they must provide their vverkerecomp.polloymenber.
lrrrnnnenrployerUmNsp+cosidingrvorkers'cowpensnfloaLuurnaeejwwlyenyrloyees. BelorvJsOiepoacynndfoGalle
btfarnurflan.
Insurance Company Name:Federated Mutual Insurance Company
Policy H or Solt-ins.Lio.8;9804086 &piration Date: 12/31/2016
Job Site Address: -22 g 0Ceu n C1`0— Su tern , AA City/Slate/Lip: C-\C4-7 0
Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MOL o. 152 can lead to the imposition of criminal penalties of it
fine tip to$1,500.00 andlor one-year imprisonment,as well as civil penalties In the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for hnsurance coverage verification
I do he car! rirder/h sins mrd ennlNes ernry that the hitfonnadomproy1ded9bovi/s true And convcb
a2 accu f0Dat
G
Phone 0.781-270.4099
Ojpclnl rise ori(µ Do rrohvrlte hr nils area,fo be eourpleterl by alp or tela+ojJlcfnl
City or Town: Permll/Liceusc 0
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/rown Clerk 4.Rlecirleal Inspector S.Plumbing Inspector
6.'Otitcr " - -
Contact Persom Phare H:
CORL7" DA'em'"M l
1!., CERTIFICATE OF LIABILITY INSURANCE NMS/101S
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIOHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS
CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR
PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder H an ADDITIONAL INSURED,the policy(les)must be endorsed.If SUBROGATION IS WAIVED,s9bjact to the term
End conditions of the policy,certain policies may require an endorsement A statement on Oils certificate does not confer rights to the certificate holder
In fled of such endorsement
PRODUCER CONTACT
CLIENT CONTACT CENTER
FEDERATED MUTUAL INSURANCE COMPANY PRONE FAX
HOME OFFICE:P.O.BOX 328 No. Aro Im:5O7.446-0884
OWATONNA,MN 55060 E'o°UD
INSURERS AFFORDINO COVERAGE NATO If
INSURER A:FEDERATED MUTUAL INSURANCE COMPANY 13535
INeuR[D 297673.0 INSURER B:
NORTHEAST ELECTRICAL INC INSURER r.
1 NORTH AVE
BURLINGTON,MA 018M INSURER D:
INSURER F:
INSURER F:
COVERAGES CERTIFICATE NUMBER 0 REVISION NUMBER:0
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS
AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS,
INS TYPO OFINSURANCE POLIES/NUMBER POLICY EFR POLICY 6XP uLDre
GENIRALw BILWY SACMOOcURRmc9 s1,000,00(
X COMMIRCUILOENERALLWBST" WIVIIARMED, $IOOXKC
OWMSMAOE aOCWA MEDDIPPM.Perwo EXCLUDE[
A N N Saw" 12/31/2015 12/3112016 PERSONAL a ADV INJURY $1,000,00(
OENIRAL AOOREOAIE s2.000,00C
OEM AGOREOATE LIMM APPUH8PER: PROWCT6-COIIPlOPAOO $2,0M.000
X FouOY P C roc
AUTOMOBILE LIABILITY emu ED BINDLE Lear $1A00A0C
X ANY AUro BODILY INJURY(PV P..R)
A "OWED OCHEACTODULED N N 9864085 12/31/2015 12/3112016 eoonYINAJRYNerwamo
NIRBOAUTGO N0*0"E0 OP8 M1A08
AUTOS
JX UMBRELLA LIAR X OCCUR SACH OCCURRENCE $2,000,00C
A RXCISS Lwe cWMSHNOE N N 9684067 12/31/201S 12/31/2016 AODREDATB $2AOO,oOO
pgD I IRETE"ON �� p}X.
1NORNBRSCOMPBNSATION X TODASLIMnp�TTLLLL e SN
AND EMPLOYERS'LIABILITY
ANYPROPMETORIPARTNBRRDmCUTM CL rACX ACCI08NT 57,000,OOC
A OFRCSIUMEMBIR EXCLUDED? NIA N 9664066 72/3112015 12/31!2018 BL OISRASE•EA EMPLOYEE $1,000,00(
(MtMatoa e,NN)
N Ya aesane wear aL 0ISME.rou"Lear $1,000,00C
094OMPMU OF OPERATIONS Mbw
DESCMPn0N OPOPERATION3I LOCATIONS I VEHICLES LURtl1 ACORD 107.ABdlma Rememe OeMOae,Nelan W See h nWanR
THIS COPY IS NOT TO BE REPRODUCED FOR ISSUANCE OF CERTIFICATES.
CERTIFICATE HOLDER CANCELLATION
00 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORI
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED It
(/) ACCORDANCE WITH THE POLICY PROVISIONS.
' 1 / --
AUTXORMHD RCP0.E98N7ATNE
(D 19864010 ACORD CORPORATION.All rights reswVOm
ACORD 26(2010/OS) The ACORD name and logo are registered marks of ACORD '
Massachusetts Oepartment of Public Safety
Board of Building Regulations and Standards
License:CS462112
Construction Supervisor
qy
JOSEPH W VACCARO
16 SUNNYSIDE AVE..
WWNTHROP MA 02162
^^^ '✓L� Expiration.:
Commissioner 0112312018
O�C/ ac�urae�fd
(�ffir a nfCtinsllmer Affairs ne Raciness Re ig It rutin
10 Park Plaza- Suite 5170
Boston, Massachusetts 02116
Home Improvem�ractor Registration
Registration: 178137
Type: Supplement
NORTHEAST SOLAR SERVICES �^�— Ca`°Exp19h01 VIM=
JOE VACCARO Sir
1 NORTH AVE. '
BURLINGTON, MA 01803
—�� Update Address and return card..Mark reason for clang&
sea, a „ `— ❑Address p Renewal O Employment ❑Loss Card
el. .eoamedof
of Coommrr Affairs&Budu ss Bcgntadoo Litease or registration valid for individul me only
E IMPROVEMENT CONTRACTOR beforethe eapwAtion date. If fomd return to:
OM=ofComnmerAlTairs and Business Regulation _
Registratio FM Type: 10 Park Plaza-Suite 5170
�aQA MO8'4�-.N`ORfHEA3T Suppiemem Card Boston,MA 02116
• ON SO 1i mac.y
N�wp�.aV W.�'�rl�:rG;b C
REVOWSUN
JOE VACCARO•
1 NOFUM AVE. De GL�erO
SURUNGTON.MA 01803 Uodtrsmetary NotvalidwitboutsiVamore
r .
PROJECT DESCRIPTION: PROJECT MANAGER
Z 19427W ROOF MOUNTED SOLAR IANCUPEORD
PHOTOVOLTAIC MODULES
SYSTEM SIZE: 6.21 MY DC STC ARRAY LOCATION
EQUIPMENT SUMMARY REVISIONS
19 SUNPOWER'.SPR-E20-327
01 SOLAREDGE SE6000A-US(240)INVERTER
SHEETINDEX
PV-1 SITE PLAN IS VICINITY MAP
PV-2 ROOF PLAN&MODULES t
PV-3 MOUNTING DETAIL B POO DETAIL
PV4 ELECTRIC LINE DIAGRAM B REVOLU(SUN.
WIRING CALCULATIONS �
PV-5 LAYOUT MAP
PV-6 PLACARDS
PV-7 MODULE DATA SHEET
PV-6 INVERTER DATA SHEET
(10)SUNPOWERI PV-9 OPTIMIZER DATA SHEET CONTRACTORINFORMATION
SPR-E20-327 FV10RAIL DATA SHEET
ROOF#1 PV-11 ATTACHMENT DATA SHEET REvowsuu MUXls�n eHu�sETTs
(E)CHIMNEY,TYP
—67'-7"SIDE PROPERTY LINE
�. PROJECTNAME
MARRY MURPHY
38 OCEAN AVE
HOUSE HOUSE PHOTO SALEM,MA 01970
J HOUSE Z PHONE'.
SCALE:NTS EMAIL.
} JOB#:MA02 16-0226
LuAPN NO.:M'.33 L:0433
a a >
O O PROJECT DETAIL
QE w
Of I I Z Q PROJECT SITE 600 MAC
¢ I ¢ J
LL r \V ENGINEERING APPROVAL
o
— I -
y
1 + . e
EXISTING
DRIVEWAY I
T m-
-69'-7"SIDE PROPERTY LINE 1
(E)MAIN ROOF#1
SERVICE PANEL
(9)SUNPOWER:
SPR-E20-327 SHEET NAME
1 1
SITE SPECIFICATIONS SITE PLAN
OCCUPANCY CATEGORY'.II VICINITY MAP
DESIGN VIAND SPEED'.100 MPH IV'
EXPOSURE CATEGORY.C SHEET SIDE
GROUND SNOW LOAD:60 PSE ANSI B
GOVERNING CODES VICINITY MAP -----T
11 X 17
2014 NATIONAL ELECTRICAL CODE SHEET NumOER
1 SITE PLAN WITH ROOF PLAN 760 CMR.SIh TAEDITION SCALE NTS D
PV-1 SCALE:3132"=1'-0" UNDERWRITERS LABORATORIES(UL)STANDARDS PV-1
OSHA 29 CFR 7970.269
2x8 RAFTERS MODULE TYPE,DIMENSIONS&WEIGHT PROJECT MANAGER
@22'O.C. MODULE WE IGHT UNPOWER:SPR-E20-32] IAN CLIFFORD
z MODULE WEIGHT=41.0 LBS
23'-5" 17'-2° y y 91, MODULE DI MENSIONS=614"x412"=17.57 SF
IN)JUNCTION Box,TYP ROOF DESCRIPTION REVISIONS
CONDUIT RUN IN ATTIC ROOF TYPE-COMP SHINGLE ROOF
TOTAL ROOF AREA=1333.00
333.8311333 00=25%OF ROOF
li li 11 li li li ip FACE AREA COVERED BY ARRAY
1LD I I BL-
LOAD CALCULATION REVOLU(sUPL
TOTAL#OF PANELS 19
ROOF#2 li li
TILTIi 45 AREA COVERED(SO.FT) 333.83
O 1
A21 88' AVG.LOAD PER CONNECTION POINT(LBS) 3668
a
3? WEIGHT PER SO.FT.OF I SOL (PER)ARRAY PSF 2.86 COMRACTOR INFORMA➢ON
F TOTAL WEIGHT OF MODULES 779
EV MA-SACHUSETi-
I I I I I I I I I Z TOTAL WEIGHT OF OPTIMIZERS 39.9 11— —"m,ee`iu
li� 11 TOTAL WEIGHT OF RACKING COMPONENTS 134.65
11 LL TOTAL SYSTEM WEIGHT(LBS) 959.55
- —-
I TOTAL RAIL LENGTH(FT.) 98.5]
WDATE O&01rz016
_TIN It OF 11'UNIRAC RAILS(132 1 5 PROJECT NAME
#OF 14'UNIRAC RAILS 4 MARRY MURPHY
38 OCEAN AVE
I I i i II II II I I I II U II I U IiL� LJ i TOTAL RAIL LENGTH FIELD(FT) 111 6ALEM,MA 019]0
l #OF UNIRAC RAIL SPLICES 5 PHONE:
\J �
EMAIL:
Q i TOTAL#OF END-CLAMPS 15 JOB#:MA02_18-0226
- APN NO..M:33 L:0433
rn
TOTAL#OF MIU-CLAMPS 30
ROOF 91 I o TOTAL#OF L-FOOT ASSEMBLIES 26
WI TILT-45 I I � PROJECT OEfmL
IIAZIM=268°11 I 11 11 621 'n
i17 I al KWAC
it
ENGINEERING APPROVAL
\\�
I 11 I 11 11 II I � I I I I i (19)OPTIMIZER y412"
. �
li (ROOF41)
HRO SOLAR PANELS
I (ROOF#1) d,
I
MSP INV ATTACHMENT
AC M ATTACHMENT
ROOF#1)
23'-5" 17'-2" ! (N) ER
UNIRAC SUNP27
B SUNFRAME SHARED SPR-E2200-332]
RAIL TVP.
2x8 RAFTERS -HEFT NAME
SWCR (N)SOLAREDGE: ®22"O.C, ROOFPLANI,
SE6000A-US(240V) LEGEND MODULES
INVERTER
■ -JUNCTION BOX — — -RAFTERS
(E)200AMP MAINNEL ---EMT CONDUIT -HEFT 512E
HER UTILITY ET O -MAINUTILISERVICE
ANSI B
HE)UTILITY METER M6P -MAIN SERVICE PANEL ® -CHIMNEY ,�,�„x,17„
(N)AC DISCONNECT IIN,] -INVERTER A -ROOF OBSTRUCTION
1 ROOF PLAN &MODULES --E
AC DISCONNECT XTERIORCONDUIT SHEET NUMEER
Ac -
PV-2 SCALE.3/16"=1'-0” -SKYLIGHT PV-2
1 '
r
CONSTRUCTION NOTES PROJECT MANAGER
IAN CLIFFORD
1.) CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO
FLASHING INITIATING CONSTRUCTION.
2.) CONTRACTOR SHALL REVIEWALL MANUFACTURER INSTALLATION
DOCUMENTS PRIOR TO INITIATING CONSTRUCTION. REVISIONS
3.) ALL EQUIPMENT SHALL BE LISTED BY U.L.(OR EQUAL)AND LISTED FOR
Ii H ITS SPECIFIC APPLICATION.
- 18"MAX —X. 1 4.) ALL EQUIPMENT SHALL BE RATED FOR THE ENVIRONMENT IN WHICH IT
IS INSTALLED.
5.) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS. REVOI UN.
5'-6"MAX 6.) ACCESS TO ELECTRICAL COMPONENTS OVER 150 VOLTS TO GROUND - -
SHALL BE RESTRICTED TO QUALIFIED PERSONNEL.
T) ALL CONDUCTORS SHALL BE COPPER,RATED FOR 600 VOLTS AND
90°C WET ENVIRONMENT,UNLESS OTHERWISE NOTED.
8.) WHERE SIZES OF JUNCTION BOXES,RACEWAYS,AND CONDUITS ARE
NOT SPECIFIED,CONTRACTOR SHALL SIZE THEM ACCORDING TO coNmacTORwFOanuTlon
mAPPLICABLE CODES. gevoLusuN mnssAcnuseiis
9.) PV MODULE FRAMES SHALL BE BONDED TO RACKING RAIL OR BARE
COPPER G E.C.PER THE MODULE MANUFACTURER'S LISTED INSTRUCTION
SHEET.
10.) PV MODULE RACKING RAIL SHALL BE BONDED TO BARE COPPER
G.E.C.VIA WEEB LUG,ILSCO GBL-4DBT LAY-IN LUG,OR EQUIVLENT LISTED
LUG. GATE:asn�rzaie
11.) GROUNDING ELECTRODE CONDUCTOR(GEC)SHALL BE CONTINUOUS PaascT rvANE
AND/OR IRREVERSIBLY SPLICEDNVELDED. MARRY MURPHY
12.) ALL JUNCTION BOXES,COMBINER BOXES,AND DISCONNECTS SHALL
BE INSTALLED IN AN ACCESSIBLE LOCATION. SALECM,Mn 019)0
13.) ROOF ACCESS POINTS SHALL BE AT A STRONG POINT ON THE IPHONE:
}
BUILDING AND NOT REQUIRE THE PLACEMENT OF LADDERS OVER EXTERIO EMAIL:
•3'-5" % WALL OPENINGS. JOBp:MA02_tG0226
RACKING 14.) WORKING SPACE AROUND ELECTRIAL EQUIPMENT SHALL COMPLY WITH APN NO.:M:33 L:Od33
RAIL PV MODULE TYP. NEC 110.26
L-FOOT RAFTER PROJECT DETAIL
PV MODULE — 621 RVd STC
1 MOUNTING PLAN VIEW UNIRAC L-FOOT 600 KWAC
UNIRAC CAP STRIP —
PV-3 SCALE 314"=1'-0" ENGINEERING APPROVAL
UNIRAC
SUNFRAME
—� SHARED RAIL PV QUICKMOUNT
3 � � CLASSIC COMP
COUNT
5
(E)COMP —
SHINGLE ROOF E
$1pON FOOF
GOM,PO _
6�F1E0.5�z2^ ALUMINIUM SHEET�F
OQ'�P / FLASHING MOUNTING&
sX POC DETAIL
5/16"X35"SS LAG SCREW sneer SIZE
MIN 2-10THREAD PENETRATION ANSI B
SEALED W/CHEMUNK M I(OR EQUIV.) 11"X 1�"
2 MOUNTING METHOD 3 MOUNTING METHOD EE'N°NEER
PV-3 SCALE.11/2"=1'-0" PV-3 SCALE:3"=1'-0' PV'3
ARRAY CONFIGURATION PV MODULE SPECIFICATIONS INVERTER SPECIFICATIONS POWER OPTIMIZER SPECIFICATIONS WIRE ANO CONDUIT SCHEDULE AL SYSTEM SUMMARY PROJECT MANAGER
SYSTEM;621 KWSTO 660 KW AC Eoom rw.sous ND GRID UTHM� l CONDUIT
mgeI IAN CLIFFORD
AS INPUT FOWEP:aW IN G13 �0
CC ttID TOTAL PV MODULE Ott;19 SITEMEW GONER XURNS R NE MA PC M MA%VCI iAVN£X OSTC:U OUTPUT CU PPE NT:N 5A GC' CUE
INVERTER AC HTNEL RUC E VOCIOPENYREURSOLTAGD:e19V�R OUTPUT WLTAGE:SGV SANEREVISIONS
OC3WAF'MfP NXV.,s VEPR JRSNPR VOLTAGE)): 7V MIN.6TPING LENGXTMODULE TOTAL STY 19 sC ISNprt{NTPi C JRAGR IRR MA%.STRING LENGXT.ISINP MM-4CM.Ea cuaaEx0:5.95^ MA%.6TPING POM P:5I5CW AC2iXYMl y
PV SYSTEM MAXIMUM VOLTAGE CALCULATION PER NEC 6907(A) TEa
STRING XExGTN"e
_ OPEN CIRCUIT
a`TEssA REVOLU(SUN.
ALL SHORT CIRCUIT CURRENT HIS BILGE.EXT£RIORWAIL
OPECATINGSTURSENT 15
jINSIDE EASEMENT—�
STRING LE.-TH"S �—ON ROOFTOP: INVERTER:
MM OPEN CIRCUIT v°v^GE SEES ON
SE6000AUS CONTRACTOR INFORMATION
OUTPUT:240 VAC25A TO UTILITY GRID
LTAGC SA. 9EMA3R,DEC
WEIGWEI INTERNAL
REVOWSUNMASSACHUSETTS
ANG CRGNGUH.0 BRENT AS 1.11.OIL NEMA 3R,ULUSTED.INTERNALGFOI8 AFC1
j UNGROUNDED,TRANSFORMERLE55 rrs n5m5Fv
O BI-DIRECTIONAL ael�xuwwTa¢
j - UTILITYMETER nRRFo. p
1-PHASE.240 V
ti
xrAvaEraUcw.¢umF
STRINGN.(RPV ODLEPENOPTw¢Ea OC1 Lx u
ID'ORTIM¢ERSCOxuECTEOINSENEs
DL6 j INSIDE BASEMEN!— GATE:O6N1/1018
- -
JUNCTION BOX AC DISCONNECT: (E)MAIN SERVILE PRWECT NPME
V,NEAR, `— k
240 V,SCAMP PANEL,1-PH,3W,
VL usTEO NON FUSED AG2 CROUSE HINDS,20M RATEDGNEMA 3R.UL LISTED 24N.OF 380CEAN AVE
e
NE)RAN 6REN(ER SALEM,MA 019]0
Lt •! Lt HOUSE 2m V, PHONE'.
G G G - L2 a CAI
EMAIL'.
g ` N N JOBp:MAO2 16-022fi
o a
_ —
APN NO.:M:33 L:0433
I .j 4ppOP PROJECT DETAIL
GTRING2 In PV OXJL X56�" Dcz j j 621 KW STC
GROPFIMZER6CONNESTEn®
6,00 QIVAc
IE�� TI ENGINEERING APPROVAL
G _ EXISTING GROUNDING
T — s ELECTRODE SYSTEM
INTERCONNECTION
120%RULE-NEC 690641D)(2)
LONOVCTOR SPECIFICATIONS REQUIRED CONDUCTOR AMPAS AMPACITY LHELK.1 a mFE ILR RP E
CGRE
Cl CUT C CUT LE ^CITY® ¢ER EOF AN AX READING ]60A..-I.
ON AIR snxnnw U ,IS AN
Ux11 TRExT F 6me(NOlPARALLEL �0 SPENT xx mne16101 meIRNOP PEREx OCR
eU66 RAnxc.�0ot<
meI.I')T SHEET NAME
• 3000Px 10%"0^ ELECTRICAL LINE
STRING iIGxP PE AE I -NaAE < DIAGRAM
lJNCT.NACACOPPER T5 ^VTvg munPs SHEET ELSE
CONDUCTOR SPECIFICATIONS REQUIRED AMPACITY CALCULATIONED CONDUCTOR AMPACITY AMPACITY CHECK#1 OxDUi AMPACITY LHELHM ANSI B
I- CIRWIT CII GaIGIx DESTINATION iE P�>ER® °„PER X ' PER „,^ EpaEN R".E , FILLMRPEx 11"X 17"
a�R GNRE N°XnPAcm" ` ,G`r" ""PER `�M"P;�IT,°R
A.
o.1LE,A WESTERN NAND) ANLL u1 EES'S SRISHI1T mE9x&NfJIT
U _110'"Ps "I < T - aT50 < SHEETNUM6ER
PV-4
,
PROJECT MANAGER
AN CLIFFORD
REVISIONS
WARNING
ELECTRIC SHOCK HAZARD.
DO NOT TOUCH
TERMINTALSTERMAALS ON
BOTH THE LINE AND LOAD REVOLUOUN.
REQ'BY:NEC 690.17 n RED'BY:NEC 690.31 L)(3)_ REQ'BV:NEC 705.12(D)L41--E REQ'BY:NEC 705.12(D)(7) n REQ'BY NEC 690.14(C)2 5
APPLY TO: APPLY TO: u APPLY TO. APPLY TO: APPLY TO: coNTagcToa mrofiMaTloN
DISCONNECTS EXPOSED RACEWAYS,CABLE TRAYS MAIN SERVICE PANEL PV SYSTEM BREAKER PV SYSTEM AC DISCONNECTS
PV LOAD CENTERS COVERS OR ENCLOSURES OF JUNCTION BOXES REvoLnou�n M�assAc�NosEns
COMBINER BOXES CONDUIT BODY W/AVAILABLE CONDUIT OPENINGWARNING
oaTe:oemlrzoie
IF A GROUND FAULTS
PROJECT NAME
INDICATED,� THEUNDED �NORMALLY
MARRY MURPHY
3s OGEAN qVE
- SALEM,MA 019]0
PHONE:
EMAIL:
UCTORS
MAYBE ENERGIZED AND
UNGROUNDED
JOBN'.MA02 16-022fi
RED'BY:NEC 690.13(8) REQ'BY:NEC 690.5(C) 1- RED'BV:NEC 690.54 o APN NO.:M:33 L 0433
APPLY T0: a APPLY TO: APPLY T0:
PV SYSTEM DC DISCONNECTS INVERTER PV SYSTEM BREAKER PROJECT DETAIL
6.21 M STC
60MAC
ENGINEERING APPROVAL
REQ'BY:NEC 690.53 n REQ'BY:NEC 690.35(F) 10 REQ'BY:NEC 690.56(C) �,j
APPLY TO: APPLY TO: APPLY TO:
INVERTER JUNCTION BOXES,COMBINER BOXES PV SYSTEM DISCONNECT
DC DISCONNECTS,INVERTERS
sNEET NAME
SIGNAGE REQUIREMENTS PLACARDS
1.)RED BACKGROUND
2.)WHITE LETTERINGB.3/8"LETTER HEIGHT
3.)MIN.3/8 LETTERS HEIGHT SHEETSIZE
4.)ALL CAPITAL LETTERS ANSI B
5.)ARIAL OR SIMILAR FOM 1 1"X 17"
6.)WEATHER RESISTANT
MATERIAL,PER UL 969 sMEEr Num6ER
PV-5
PROJECT MPNAGER
IAN CLIFFORD
REVISIONS
REVOLU(UN.
OCONTRACTORINFORMATON
REVOLVSVN MASSPCHVSETLS
�xm x�l�aw cral
MTE 0&N12016
vRaJEcr NAME
MARRY MURPHY
38 OCEAN AVE
SALEM,MA 019]0
PHONE:
EMAIL
JOBN:MAOI 16-0338
APN NO.:M:33 L.0433
PROTECT DETAIL
6 Z1 KW STC
600 KW AC
ENGINEERING MPROVPL
O
SHEET NAME
LAYOUT
MAP
SHEET SIZE
ANSI B
11"X 17"
SHEET NUMBER
PV-6
PROJELi MANAGER
IPN LLIFFORO
E E POWER' REVISIONS
1] F-SERIES
SOLAR E A
s.. .
i.`_.
SURPOVIER
OFFERS THE BEST COM0ME0 POWER AND VROWCTBCD�W REVOLU(SUN"
_ �r HIGH PERFORMANCE&EXCELLENT DURABILITY
SERIES Cm LONTRAUN MAS CHUSETN
EV-UBV�NM 1-r USETrS
0 5 m, .5 e, 15 ° 5 m IS larnxLLi�xrzs�mrusw,
•20.4%dimeti hb.i'•:wamdp>vr VS%kr Aa sy ay Ad%/n.rot+m R.S.' Combl:mdil:m xlrb vmW m.��mn°m�� •••"a•,,•11e
Ideal lar rods where space a ara premmm or
where bum milanSlan might he needed. E20aVPANEL EIEC@ LOATA -OPERATING COIm lAND Wtii KLL Wi oATe aeiI.R
High m+an. mn, IM22, T.::p.eb. -ao•Pro.las+l-amclu.esc
R PMIa -- _ ___ _ PRQIELT NAME
oweren,.6nl nceln realworld N.nOdenoo.lPrmnl ERW GROW Se-50 It 540()Be
R6fkiln iadLbak
mrdmoas,wch m�g�pamNrey clwds HIGH EFFICIENCY' w.mr rd.m•. s/-0IL ,5/aE sm.112 It sdao ,uaLDnw I. MARRVMURPHY
and law lght.'''s Gerlemb more energy per sweet fool Aug,Pmml PRci.iy" 201% 1�_• i Exs:mN d.bl.52.0 W m/51 380CEANAVE
Pmm wlue ESeres rrnkrmal panels moven more sunLghi ro eleclocly plodecur,36% Real v.n�.MuEPI Sd.2V 5d.RV A avmA SALEM,MA 019]0
none er rel.'wd 60%more Pr uam fool arer 25 Rad ce.a 16,1 S.VBA Smile p.vv%• PHONE'.
,..IS dolum, vdenAa.,valpe E$erles POV+ PerW ergY Per s9 s.bc.E. HOMm:mpdiri Mmm e.:oc.6 EMAIL'.
poneh deliver the hoMres,value add lam" opeSCao:dl vomR..1 m.aA m0V Tmp.d(R® High Tmmaaim Tmq.d A:.iRJmlim JOOp:MA0216-022fi
pedwmolm For arry home. HIGH ENERGY PRODUCTION' ywKprRamN RO.IeA 6,24AIm.lim 0m Res Rod
Weimer.Spanv.1t, 481000V EC
Rodum more ellmgV pm mbd wa0 M•.nmm Se6fiu 20 A _ amalm1M cocooned,hJR.AAMA Be,
HIBh etu one pe fornecince deli'vem 7-9%more mer,pet med wad,'The Por-i.ry CwE R:ryyl -0RBY/Y WdaN A16.11 BidW PR01ECTDETV1
Ddanlage mwames osc0 Producing 20%more enery gaver Re first Veh� Temp ep cut M=I l)e.emv/C --- 621 KW SITE
25 Wain to meet Your rwi ICm.TmpC.F.let JSmA/'C1 1E5TS N0 a:RRiCAIgNs 6.00 KW AC
gam; GeAherm G.M3,FC61 ISO 0'.1001]]0
., clop/ lumaewm96ereaaRn..,mmmm.m. �.•p:a:LON, EMS CtIM T50FWI:ROOB OW
ENGINEERING MPROVPL
UE a '- mpOalbmr,IA.em9� - '
3 Ii°%___.._.........._..........._........ Moe E::.Or RM•lam ld5nb.ampvq:routs. Ens Ce:rylmu IEC 627HY316001:R001,Iwdfim,NCyd.
Go,
. IEC 61701
M..m•s.6 C.E.:Emd®mATI.R.. % ....._ 1sm,u T °p R�°y +°�*'°°�M1i101�':b°•"� _nAR,d.i E:w_mac>Er,EEMb co Mcs.rse i. 100CIK
0 MR¢aa Nen'- pmrmn EC 6R]Ib
weeirturt—M
E,,NRd b Entente m,dm0red b8uaRin, nJ l.:Py. SubS _
cop Po% oeum, . IaetY DY
E,Immmed I.W.of mind 6
Deei,ed to delNer.11lenL lroublehee W J0Y n..alwrmc m•mm•m..nm mRxwar....
energy wrcra very ling them. w% donaaum Pmcledl.nm.nlm:sma,ro Sn R.
nsox --_-- -. . seR::..m.m Amm..mm.de.ar lRPma.m.dmm•amuups -I-
De+glledhe&.hlhy a s to w� Is xo v p.sh.lal amp.i.a.R•m L:•.:mmdsl.d sou.
varns.
The Sunpw+eP AMuon Solar Cell s The ony •{' +s-°.mwm.mras.^^rmrba.rae.
cell bnII.D a soled copper Famldmlm.VNe.11, 10Y � .� las:agar..l::�:me.ms....us.x..:rol.¢"rvua.a.rw to1.mn
-.n ememneu Rm.0-roofs. k113n]
impertarSla the cwrmlm Griot cm2urg that s% r wenm .._. I.„ llfmy.ddm..:memmW.mmap..LAti u,oaEamlrmm.ni
do,rode Coommonel Paneh.'t
3' p�"0ym a5 �+xo= I]'vAaiaCm(+m 11®wM'Pmi,r c.iS,y"9 SHEET NAME
pl Ranked Tn For hoder dlrabTlity le N.10 $ 6° _- we..emm..ma::....ar....amemse:.a:dm. deem
100%poemmaikueduI 25' % .. . .ORO �0°rb Id BIMI 150Wnm MODULE
mnprdemrve INDl Wmbitiy last" a sm.,ml�Pm a -- dB1'^Ind SPECIFICATION
w
15 ..__. ...... N,RB.fvmm[u •_. 3m - ban.nh:.wi.bvmrm":_`
8 °F MXAehai.e GWx M6Mva.vM.uvarpw.gpwc.nnu: __ ..n.Rmlwgmaimlmim uanum.hibmubPev rmM SHEET SIZE
- ..r.......�.°.:.....�_w:..:...:.m. ....... ...m.. a��wm.ar•p.'<am ANSI B
sunpowrcarp.<am e1°•�° "rt°" 11 X 17"
SHEET NUMBER
PV-7
PROJECT MANAGER
AN CLIFFORD
REVISIONS
solar' • a o Single Phase Inverters for North America m mm PN a N
solar SE3000A US/SE38DOA-US I SE5000A-US I SE5000A-US I
ISE760OA-US/SE100DOA-US/SE11400A-US
stal I ss1M. ISE6emAU9 sE]amr.Ys s,Ol lDl I sF1ImxAL9
OUTP
SolarEdge Single Phase Inverters aooP'
NSM. 3ma REVOLU SUN.
......................._.._.........................._uw.....�'.e'at ..._.mm.._. ....."°°......iouo�}ares.....I,.m........Y".....
aGA AC Por,Coma 33n1 P50 I3� Ye
For North America _..............�ss.er9.m ................... ........}W�.@}�t..............................
..........................
Na W
Nal-IRI
MiF+P Wn.Nan.Meu° J J
SE3000A-US/SE3800A-US/SE5000A-US/SE6000A-US/ ....._.._................._....._......__.___................................. ..........................,.....__............_......_.....................
M W6N Wn+P Wn.Nm.M1bam
I]I�xm�xM Vrt
J J J J
SE7600A-US/SEt0000A-US/SE11400A-US ...._.........................................._........_........................., ..........................,.onPE...........,__............................. coNTRACTOR INPORMAnoN
Krr.Dolsm.A.A:"'......... �x4@MV mxl mamY......".:.f°..:°Pie@.�.........................."!..,..
..........................................
MU CmYiw.IVpW Grmnl V'S A REVu SIINMAS'su.ETTS
. ... .., 13@iaW a .3 .1,Px9PY a].. ...
6mlmIm �.imam:wwr a.m
. ._ ... .. a.Er.na.xa
um xl.° .im;n.iar N mrsmw. . .. r ... wmxArErwEl auwlro.w.
INPUT
..'acus'—pm ImU slm 61so Mm lUxsU ., Sn P, vnxv. J.
m
i r Hry uryw°am yn
Y ,tm oC4q 191Yp ®]OSV/35o xaOa Nk MTE:o&VNA IS
• .. .. ...
AU
W 4q C mN 95 ( 3 1165@x1I ASI
PS ed PROJECT NAME
. ......... .. .. . . .. Ri@4 .... .. sRS@Elm' . ... .
MUIryN snmanuncxeP.?....................................................... .........10........_..........._................................. up "3d EAN APE
.. . .. 360CEAN AVE
M . .. 9s .m w .. SALEPHO E01970
dN,E®,1 y 9 5 99 ]s® 9]5 9]5 9 1x11
.....9lS RP APY. EMAIL:
St.n
MA02 16-0226
- - -- - � A°dmoxu Runars _. "- - APN L:0433
Poso. m�.a�.,uw,m,.n,a ........ awes M2¢sm•mP�aeea..IR?a"'R... . ........
sa GramW 4�y .
O w ... ."In
Sn, eke arwmswrFAw d
..
. .. PRICIEST DETAIL
STANDARD COMKIANCE VinuuVALSR zxx 2
Due seuiW... .. 8.00 KW AS
................,, . ..........................
NOC s m
U.STALLATUmul"AuRCARSOPPI ENGINEERING APPROVAL
@ mw• (,u Ayre.. Ir
ocnwm,a,aa�w lad A"Pi 'bla o4ons-/ z P/
va MMvn/xx O/166AV.L
® _y AgmmL .a. SIke. .. � 5}125'1.5/.. „/ ..
., 335.135 ]x/Tx5 315 IM
'^•`" UAW1191I?i 54}SAEW.. . .pqn ..
'pro nn s.rnyswnn .... ....mn ee A(NI
• xnw
Cons, wmq cmwrum a.iwnttnw Nmmlr.,aLk
Nn1u
The best choice for SolarEdge enabled systems ...........................................................................3s...............................e9na.wad............_.._..........................
w a ...
-Into raMd arc fault rection a for NEc 2011690.11 cam Ilance ........ .....................................................................................................................................................
6 Pro (Type I P �uniay.opa:ii ei:°m..w�, .I3b.Im/151°.m Now.mr,mmmwh .. ..
SuPerloreflldenN 198%1 ..w9p.._................................u ..........................................................,....
....,..........................._.............................
.....Rmxtlm PaN.A.............................................................................NEMA3R...................................................................
-Smalli mospula-loht st easytoinstall on Provided bradet •�,,,,y,•,i�••���•
— em¢-m modmo-level momaunmg
- Internet Connection through Etbemet or Wireless 'e�rm,,r,'✓mr°�11• vs+amaa.-•axo�a.r
-OuW.,.cd Indoor lnstallabon '— r_.o "' — """ SHEET NAME
Fiend spite,msoNe,IDC/AC Consortium on[, INVERTER
- Pre assembled safety switch for raster menaoahan SPECIFICATION
—Optional—revenue grade data,ANSI C12.1_ _s...... • a SHEET SIZE
USA-GERMANY-ITALY FRANCE-JAPAN-CHINA-AUSTRALIA-THE NETHERLANDS ISRAEL www.solaredg.Lui ANSI B
1_011 _110 ININI'll-iiii ww Ill 01111, PEI I-- 1"X 17"
NUMBER
PV-8
i I
PROJECTM
IPN CIIFFORDORO
REVISIONS
solar ' solar= s s z SolarEdge Power Optimizer
Module Add-On for North America
P300/ P350/ P400! P405
SolarEdge Polder Optimizer REVOLU(sun,.
vaa vaso PGW v4m
U+aammmw+l Innes mewl.b Iawmeimu+l la.mnsiemeem+l
Module Add 0n For North America 'INPUT
q.k kP aPo da ab P M as w
....... ......
Ammum MaI Ppl vanaee
48 60 90 ]35 Wt cONTRACTORINFORMATION
P300 / P350 / P400 / P405 ,v«xkwe,.t P< ' ! —... —.. .
_ Maamum shoo_MMaPrP•.IrmDuOmenO•.CllnI E_qeIUiRwnC[ne,evm oe l•lss.•.l. ' ' 9 15.10 .c
......... �
.... REV�OvLpworUrtrS
....• ... D .................................
... Pd onVnn�=NvslwEsmMmwoAtmrn$ml
sereln
nnmeumrvsrcuumr
sw
E.
rgs
� Nadmum fMn.�T......... ................99.5, .................� iawwuw
._....e..... ry ..................................................... ..................................... ...... w:evwasnnx
Wel Metl Ffitien 908 M
OUTPUTeURING II
i OUTPUT DURING OPERATION(POWER OPTIMRFR[ONNEREO TOOPEflATING INVERTER)
GATE 0&➢1(1018
Maximum DulpulC t
.. ........... � ............ ...... PROJECTNAME
MWmum OWp Vhye������������
O OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) MARRY MURPHY
Safety output Voneee par Pp Opllmlui 1 Vtl< 3R OCEAN AVE
STANDARD COMPLIANCE SALEM,MA 019]0
Patl15CUu01E610[O6E IECO1DYl63 PHONE:
kY 5i kryl uu]ex ......... . .... JOB#:MAOIIL1 S__.
Rolis
INSTALLATION SPECIFICATIONS APN N.
M:33 L'.0433
M (mum Nl etl 5y51 Vollege., .......,.....,..., IW] We
DI IW L M) 141 1II 405/S55 834 159 /I PROJECTOETAIL
W ILM1LII dud18 bl / 9W 8.21 KWSTC
/E1 EF/Ip
gM1< <tl .... ...................MC4/gmPM /iµy MG
OIpN WIaT)'P[/C MaMbll WIdA pM fi00KWAC
OutpN Wlml gM1 095/3A 13/3.9
.... ......_ .. ..... .. ._... _. ..._.......
ENGINEERING APPROVAL
' .00entlnEiemGeMu2 ganF..........................................................'a.•.:KS/„AO:q85............._.........................-6/1.i:. ....
PrUeLtlan RaHn6P65/NEUM
• ................_....................._..........................................................I........_........_.._..___...._...__.._..........
gelaMeNumWllY 0"1W M
PV SYSTEM DESIGN USING SINGLE PHASE THREE PHASE EOBV THREE PHASE d00V
A SOLAREDGF INVERTERIa
Ml,Y omSiring tewh g TO 18
(Power OpNnittrs)
... .......... .............. ..._...... ....__......_._ ... ......_,.. ...,......
SI
PV poweropiimizarl at the module-revel IPoweropnmlaem�DB ss zs so
. .. . ..... ...2 . .... ...... ..,.. ......
+Upth36mOrem HgY Mavlmum Pp p Ade ,, szW 6Goo
IEE`A w
-`sUP.I .aeffitleAaT•:1985^61 Parelkl snmeam Dwuem IenpBa Y.
'MldgRes all typ[5 de5of madulemlzmatM losses irnA'inanuhFtunrgtoJeianretpprpal sllatli3O or Odenlapons
..___... ......._. .._......
. ..............
%eJtlb ery5fem �l famaYfmum`{sceuh lxelfm m srvTI Z
ME
Fast msBla on wmh a 4nWebol; OPTIMIZER
NextgelelSGm mantenancewrth mpdulcle:d monitD9lg SPECIFICATION
r + MoiLlelLvtlwl[age dluxdownforl seal ndfirA�+hta`suy SHEET SIZE
ANSI
USA - GEIIIApNY IT. � FRMNCE IAI6N [NINA ISgAEL- AVSTRAVA WWW.soleredge.us 11 X 17
SHEET NVMBER
e PV-9
PROJECT MANAGER
AN CUFGORD
REVISIONS
SUNFRAME
RAIL
REVOLU(UN.
coNrRAcroR wroRMAnoN
{\ EVOLUSUN MASSALNUSETrS
M\ vcx�wre�mom Tai.
L FOOT
onre mmlrzoie
PROJECT NAME
® MARRV MURPHY
380CEAN AVE
SALEM,MA 019]0
PHONE'.
EMAIL'.
JOB#:MA02 16-022fi
APN NO.:M'.33 LB433
PROJECTDETAIL
fi 21 HWSTC
3/8-16 X 3/4 6DK AC
HEX HEAD BOLT
3/8-16 ENGINEERINGAPPRCV
FLANGE NUT
00
o
O❑On �n n�� SH RAIL
OE 11v11 'uI\�fV' W Installation Detail RAIL
Qsme uxm�c.xc. SPECIFICATION
SunFrame Rail
1411 �Y a4D YE SHEETSIZE
YJYw . "'m m4 L-Foot Connection
PN3a eosz4ze.+� ANSI B
uxw cmu
URASSY-0007 ''I X 17°
Lmt Yoflfled OB B 8SHEETNUMBER
PV-10
I
PROJECT MANAGER
AN CLIFFORD
Classic Composition Mount I AMSC
E
MS EWE ICWAhDS -1 RPCYNGCPNfdNEM$ REJ
250 - POOL RIWE n BJ ✓—R.INCLUDED
5
6
B
5 REVOLU(SUN.
4
2.n
3
11.50 CONTRACTOR INFORMATION
2
.3.00 PEV01-US
JNMPSSPCXUSETTS
' CESOtIPIgN OP,I RASHWG.I Y%IT'XDVT IWV},MILL I
w amnm
12.W� 2 OfiICCK Cl0.\9G Alb.]CAR AL MIN I I IWPi iw.
3 HANGER BOLL.PLAN CENTER,SO1.1,I BE SS I
r
1U d 1VAHW.SEA:NG.3/16'DX3/d'OD.@oM WNC®55 DATE BBNI/1Btfi
PROJECT NAME
5 NEEKK 9
WI110NC-R.IBBSS ]
b WXHER.FLAT. vmd'ID+vLa'OLD.I V FEW I MARRY MURPHY
1.30 i wuXEJi.LENDER.WI b"ID X I'OD.ISA. I 380CEAN AVE
SALEM,MA 019]0
I. 9 wASNERSRR-L0..F.ylb'IS.18855 I PHONE:
3.00- Quick Mount W doea.mn zl�is-ozzs
IME: --
_ i AMSC:CLASSIC COMPOSITION APN No:M:aa L:aaaa
MOUNT
AVAILABLE IN MILL CLEAR ANODRED, PROJECT DETAIL
AND BRONZE ANODIZED FINBXE9. --TSPS 6 21 M STC
REV
1 A mm9 6 e00IMAC
ENGINEERING APPROVAL
' LBO BdI Sped&Otlali
so.[wcmn I nww0'o,Ieea+e w.Oees
r��rv,van
EngYnann Sl+u[a L4ggNe Pne MY11W016AVJierr 1M
[3 Bb
@INONI
..,P
STu.Pie Fu1Ea3nwmplewt{fe[pewdMSRmal.al
SWucMMan Wad(artR MS hq;➢tle11}0.113]A _
ReNs SHEET NAME
ATTACHMENT
SPECIFICATION
Quick Mount PVS ANSI B
RESPECT THE ROOF .I.I ii y 17"
B1 7.23-7 Apr2014,Rev SKEET NUMBER
PV-11
ECTOR
E n e I n E E R S
Project Number: U1883-0045-151
December 21,2015
RevoluSun
I North Avenue
Burlington,MA 01803
ATTENTION: Ryan Stair
REFERENCE: Murphy Residence:38 Ocean Ave,Salem,MA 01970
Solar Panel Installation
Dear Mr.Stair:
Per your request, we have reviewed the layout and photos relating to the installation of solar panels at the above-
referenced site.The following materials and components are proposed in the installation of the solar panels.
Roof Structure:2x8 rafters at 22"O.C.
Roof Material: Composition Shingles
Based upon our review, it is our conclusion that the installation of solar panels on this existing roof will not adversely
affect the structure of this house. The design of solar panel supporting members and connections is by the
manufacturer and/or installer. The adopted building code in this jurisdiction is the 2009 International Building Code
and ASCE 7-05. Appropriate design parameters which must be used in the design of the supporting members and
connections are listed below:
Ground snow load:45 psf per Massachusetts amendments to the IBC(verify with local building department)
Design wind speed for risk category 11 structures: 110 mph(3-sec gust)
Wind exposure:Category C
Our conclusion regarding the adequacy of the existing roof is based on the fact that the additional weight related to the
solar panels is less than 3.5 pounds per square foot. In the area of the solar panels,no 20 psf live loads will be present.
Regarding snow loads, it is our conclusion that since the panels are slippery and dark,effective snow loads will likely
be reduced in the areas of the panels.Solar panels will be Flush-mounted,parallel to and no more than 6"above the roof
surface. Regarding wind loads, we conclude that any additional forces will be negligible due to the low profile of the
Rush-mounted panel system. It is our conclusion that any additional seismic loadings related to the addition of these
solar panels is negligible.
During design and installation, particular attention must be paid to the maximum allowable spacing of attachments and
the location of solar panels relative to roof edges. The use of solar panel support span tables provided by the
manufacturer is allowed only where the building type, site conditions, and solar panel configuration match the
description of the span tables.Attachments to existing roof joist or rafters must be staggered so as not to over load any
existing structural member. Waterproofing around the roof penetration is the responsibility of others. All work
perforated must be in accordance with accepted industry-wide methods and applicable safety standards. Vector
Structural Engineering assumes no responsibility for improper installation of the solar panels.
Please note a representative of Vector Structural Engineering has not physically observed the roof framing. Our
conclusions are based upon the assumption that all structural roof components and other supporting elements are in
good condition,free of damage and deterioration,and are sized and spaced such that they can resist standard roof loads.
Very truly yours,
VECTOR STRUCTURAL ENGINEERING,LLCaDrC
Roger T. Alworth,S.E.Principal 21, 2015
RTA/amw
9138 S. State St., Suite 101 I Sandy, UT 84070/T(801) 990-1775/ F (801) 990-1776 1 www.vectorse.com
ECTOR
E n O I n E E R 3
Project Number: U1883-0045-151
December 21,2015
RevoluSun
1 North Avenue
Burlington,MA 01803
ATTENTION: Ryan Stair
REFERENCE: Murphy Residence:38 Ocean Ave,Salem,MA 01970
Solar Panel Installation
Dear Mr.Stair:
Per your request, we have reviewed the layout and photos relating to the installation of solar panels at the above-
referenced site.The following materials and components are proposed in the installation of the solar panels.
Roof Structure:2x8 rafters at 22"O.C.
Roof Material:Composition Shingles
Based upon our review, it is our conclusion that the installation of solar panels on this existing roof will not adversely
affect the structure of this house. The design of solar panel supporting members and connections is by the
manufacturer and/or installer. The adopted building code in this jurisdiction is the 2009 International Building Code
and ASCE 7-05. Appropriate design parameters which must be used in the design of the supporting members and
connections are listed below:
Ground snow load:45 psf per Massachusetts amendments to the IBC(verify with local building department)
Design wind speed for risk category 11 structures: 110 mph(3-sec gust)
Wind exposure:Category C
Our conclusion regarding the adequacy of the existing roof is based on the fact that the additional weight related to the
solar panels is less than 3.5 pounds per square foot. In the area of the solar panels,no 20 psf live loads will be present.
Regarding snow loads, it is our conclusion that since the panels are slippery and dark,effective snow loads will likely
be reduced in the areas of the panels.Solar panels will be flush-mounted,parallel to and no more than 6"above the roof
surface. Regarding wind loads, we conclude that any additional forces will be negligible due to the low profile of the
flush-mounted panel system. It is our conclusion that any additional seismic loadings related to the addition of these
solar panels is negligible.
During design and installation,particular attention must be paid to the maximum allowable spacing of attachments and
the location of solar panels relative to roof edges. The use of solar panel support span tables provided by the
manufacturer is allowed only where the building type, site conditions, and solar panel configuration match the
description of the span tables. Attachments to existing roofjoist or rafters must be staggered so as not to over load any
existing structural member. Waterproofing around the roof penetration is the responsibility of others. All work
performed must be in accordance with accepted industry-wide methods and applicable safety standards. Vector
Structural Engineering assumes no responsibility for improper installation of the solar panels.
Please note a representative of Vector Structural Engineering has not physically observed the roof framing. Our
conclusions are based upon the assumption that all structural roof components and other supporting elements are in
good condition,free of damage and deterioration,and are sized and spaced such that they can resist standard roof loads.
Very truly yours,
VECTOR STRUCTURAL ENGINEERING,LLCM OF
R ER T.
A
IVI
.a
Roger T. Alworth,S.E. $/ONAL.'
Principal
DEC 21, 2015
RTA/amw
9138 S. State St., Suite 101 /Sandy, UT 84070 1 T (801) 990-1775/F (801) 990-1776/www.vectorse.com
REVOLU(SUN
THIS HOME IMPROVEMENT SOLAR ENERGY CONTRACT(this"Contract")IS BETWEEN:Mary(Terry)Murphy("Clientl located at 38 Ccean Ave
Salem,MA 01970("Client's Property')
-AND-
Northeast Solar Services,Inc.®("Contractorl of 1 North Ave Suite A Burlington,MA 01803.with Home Improvement Contractor Reg.No.178137,which
expires on March 17,2016,and Federal Employer ID 46 0569853.Contractors sales person for this contract is Brian Sadler.
The parties to this Agreement agree as follows:
1.SCOPE OF WORK
A.Installation of PV System-The above Client(s)has engaged Contractor to perform the following residential contracting work(the"Work")in connection
with the installation of the following photovoltaic solar energy system(the"PV System'J:
19 SunPower-SunPower 327 watt modules(or equivalent) with 1 Solar Edge-Solar Edge SE 5000A inverters(or equivalent)and all mounting,
disconnects,and all other PV System components necessary for a National Electric Code compliant PV System,totaling 6.213kW,located at Client's
Property.
B.Other Inclusions The Work shall further include:
•Installation of the PV System in accordance with all Stale of Massachusetts interconnection standards.
•All reasonable engineering and permitting costs.
•The following building permits are required and will be secured by Contractor as Client's agent:Building and Electrical Permit.
•Following the Installation,Client will receive a PV System orientation and a PV System Client's manual.
Notice: It shall be the obligation of the Contractor to obtain all permits related to the Work. Clients who secure their own permits will be excluded from
the guaranty fund provisions of Chapter 142A of the Massachusetts General Laws.
II.COMPENSATION AND SCHEDULE
A.Contract Priya For Contractors performance of the Work under this Contract.Client will pay Contractor a total of:
$31,977.82(THIRTY ONE THOUSAND NINE HUNDRED SEVENTY SEVEN AND 821100)DOLLARS USD(the"Contract Price").
B.Payment Schedule The Contract Price will be payable in accordance with the fallowing payment schedule:
Date Paid:
S 15.988.91 Initial Payment-50% (Due upon Contract signing,which Is an amount less than the cost of the materials and equipment
which must be specialty ordered in advance of commencement of PV System installation)
S14.390.01 Progress Payment-45% (Due upon Substantial Completion)
S 1598.90 Final Payment-5% (Due upon Final Completion)
C.Schedule The"Start Date"of this Contract is the date Contractor receives the full amount of Client's initial payment of 50%of the Contract Price.
Subject to adjustment for any Force Majeure reason stated in Section IV.J.,the Work Is estimated to begin within 12-16 weeks from the Start Date of this
Contract.The parties agree that this date shall be automatically extended to the date of delivery of all materials and equipment which mut be specially
ordered.
Substantial Completion Is estimated to occur within 16-20 weeks from the Start Date of this Contract,but the parties agree that this date shall be
automatically shortened or extended to the date on which all racking and electrical work are complete and the PV System Is
capable of generating power and ready and available for use subject to final government and utility approval.
Final Completion is defined as the date on which all punch list Items are complete,all permits are dosed,all other government and utility
approvals are obtained and the Work Is complete to the satisfaction of Contractor and Client.
Client acknowledges and agrees that the Work Involves permits,Inspections and approvals from vadous government agencies and utilities,and
therefore the timing of the Work may vary and Is not within Contractors control. Client further agrees that Contractor shall not be liable for any losses,
- costs or damages related to any delays for reasons beyond Contractors control,including all causes noted in the Force Majeure section of this
Contract below.
1 Northeast Solar
1 North Ave Suite A
Burlington,MA 01803
Revo I u S u n.cora 781.240.6555
12]i®5 WIS� CN3B4015
REVOLU %UN3
Ill.IMPORTANT NOTICES
A.Contractor's Registration: All home improvement contractors and subcontractors engaged in home improvement contracting,unless specifically
exempt from registration by provisions of Chapter 142A of the Massachusetts General Laws,must be registered with the Commonwealth of
Massachusetts. Inquiries about registration and status should be made to the Director of the following state agency:
Office of Consumer Affairs and Business Regulation
Home Improvement Contractor Registration
Ten Park Plaza,Room 5170
Boston,MA 02116
(617)973-8700
B.Client's Cancellation Marts: Client may cancel this Contract,without penalty or obligation,within three business days following the date on which
Client signs this Contract. A Notice of Cancellation Is attached hereto for Client's convenience.
C.Warranties:For a period of ten(10)years from Substantial Completion,Contractor warrants that the PV System has been designed and installed in a
good,workmanlike and substantial manner in accordance with all applicable building codes.
In the event Contractor is required to penetrate the roof of the Client's property In the course of Installation,and causes damage to the roof within a three
(3)Inch radius of a penetration,Contractor will repair such roof damage for a period of twenty(20)years from Substantial Completion or the remaining
term of the roofs existing installation warranty,whichever is shorter,to prevent any water,rain or other moisture leak,seepage or entry directly caused
by such penetration.These warranties are for normal use and conditions only.All warranty coverage to equipment and workmanship installed by
Contractor will be VOID if any alterations or repairs are performed by any person or persons not expressly authorized,in writing,by Contractor.THIS
WARRANTY DOES NOT COVER:(a)Damage caused by external forces such as,but not limited to,vandalism,theft,terrorism,fire or act of God;(b)
Damage caused by weather effects exceeding manufacturer tolerances;(c)Normal wear and tear or aging of a PV System;(d)Any implied warranties:
(e)Electric bills,water damages or any other consequential damages;or(1)Damage to the PV System or its efficiency due to adjustment,moving,or
tampering with the PV System or any of its components by individuals not approved by Contractor.
D.Change Orders: Any alteration or deviation from above specifications involving extra costs must be subject to a written change order signed by both
parties,which shall be incorporated into this Contract,and Client shall be liable for any additional costs resulting from each change order. By initialing the
space below,Client hereby specifically agrees to execute a change order,and pay the additional costs,if it becomes necessary for Contractor to repair or
replace un-approved or non-code compliant electrical work in order to Complete the PV System installation and satisfy code requirements.
Client's Initials:1W
Client's Initials:
ARBITRATION: CONTRACTOR AND CLIENT HEREBY MUTUALLY AGREE IN ADVANCE THAT IN THE EVENT CONTRACTOR HAS A DISPUTE
CONCERNING THIS CONTRACT,THE CONTRACTOR MAY SUBMIT SUCH DISPUTE TO A PRIVATE ARBITRATION SERVICE WHICH HAS BEEN
APPROVED BY THE DIRECTOR OF THE EXECUTIVE OFFICE OF CONSUMER AFFAIRS AND BUSINESS REGULATIONS AND CLIENT SHALL BE
REQUIRED TO SUBMITTOSUCH�ARBIITRATION AS PROVIDED IN M.G.L.c.142A.
Client:��_ ✓1n1& by Date:_
Clienb\� Date:
Contractor: i Date: It ,ikw !
NOTICE: The signatures of the parties above apply only to the agreement of the parties to alternate dispute resolution initiated by Contractor. Client may
initiate alternate dispute resolution even where this section is not separately signed by the parties.
E.Incentive Guarantee: By Client's initials below,Client acknowledges and agrees that Contractor has not and does not guarantee Clients qualification
for, receipt of or amount of any tax credit,rebate,solar renewable energy credit(SREC)or other incentive amount in connection with the PV System,and
any estimates of Incentives(wither In a PV System proposal or otherwise)are not guaranteed to be accurate or available. Client is responsible for
determining Client's and/or the PV System's eligibility for any Incentives and should consult with tax,legal and other advisors regarding availability and
possible tax consequences of claiming the same.
Client's Initials: 4Q21 1—/M
Client's Initials:
2 Northeast Solar
1 North Ave Suite A
Burlington,MA 01803
R evol u Su n.com 781.240.6555
105318 W+smo censaom
REVOLU(SSUN,
IV.OTHER TERMS AND CONDITIONS
A.Access: To enable Contractor to perform its Work hereunder,Client shall grant during daylight hours adequate space on Client's property,as mutually
designated by Contractor and Client,for the complete and proper installation,operation,maintenance and repair of the PV System as well as rights of
ingress and egress to,through and from such property and the space designated for the PV System.
B.Scarcity of Materials Rights of Termination: The PV System components to be obtained under this Contract are scarce commodities.In order to meet
the performance requirements of the PV System described in this Contract,Contractor may substitute the specified brand of solar module or inverter for a
similar brand of module or inverter that allows for more timely completion of the installation. Such substitution,If necessary,shall be of UL approved
devices,with aggregate performance criteria the same as equipment specified. The governing body for determining performance criteria shall be the CEC
(California Energy Commission)that rates all UL approved modules. The key module statistic used for performance criteria will be the DC STC rating of
the sum of the modules. The key inverter statistic used for performance criteria will be the AC output of the device.
If,due to code requirements,equipment substitution,final engineering,space availability,etc.,the size of a PV System decreases,Contractor shall re-
calculate the Contract Price using its standard pricing method and the Contract Price shall be automatically reduced.Client shall be credited by the
reduced amount. If due to substitution the DC STC size of the PV System Increases slightly,then Client shall not have to pay Contractor similarly.
Contractor shall make every reasonable effort to ensure that PV System size does not decrease from the specifications. If the DC STC size of the PV
System decreases more than 15%from the Contract's specification amount for any of the reasons stated in this paragraph,Client shall have the right to
terminale this Contract within ten(10)days of Contractors written notification to Client of such decrease,and Contractor shall then refund in full all funds
paid to date under[his Contract,but shall have no other liability to Client.
Contractor reserves the right to unilaterally terminate this Contract within 45 days of its approval without any liability to Client if any of the PV System
components required for the completion of Contractor's Work in a timely manner are not available. in the event of such termination,Contractor shall
refund all monies paid by Client to Contractor as of the dale of termination.
C.Limitation of Liability:In no event shall Contractor be liable in an amount exceeding the compensation paid by Client to Contractor under this Contract.
Contractor shall not be liable for any Incidental,consequential or special damages or for economic loss or expense of for loss or profits or Income of
Client,or Client's consultants or agents or employees,or any of them,including but not limited to any electricity costs Incurred should Installation of the PV
System be delayed beyond the commencement or completion schedule set forth above.
O.Zoning:Client shall pay for all variances,special permits,or other costs related to zoning,including without limitation any fees or costs related to
attorneys or engineers.
E.Client's Property:Client agrees to remove or to protect any of Client's personal property,inside or out,which may interfere with or obstruct the Work,
Including but not limited to landscaping,and Contractor shall not be held responsible for damage to such property. Client understands and acknowledges
that proper operation of the PV System purchased hereunder is dependent on Client's existing roof and equipment and Contractor shall have no obligation
or liability for the condition thereof,or any other part of Client's improvements or equipment not purchased hereunder. Client expressly represents that the
roof of the property upon which the PV System will be installed is in good condition,with no known water Infiltration problems or other structural defects.
F.Insurance:Client must carry all fire,casualty,hurricane,earthquake,theft,and other insurance related to Client's real and personal property.
G.Cancellation of Contract: If Client cancels or breaches this Contract after the opportunity to execute three(3)day rescission has passed but before
commencement of construction,Client shall pay Contractor the amount of expenses Incurred to that date plus 20%of the Contract Price. If Client fails to
pay said amounts within thirty(30)days of Contractor's demand for payment and Contractor files suit.Contractor shall be entitled to recover all of its
damages including its loss of net profits and attorneys'fees and costs if Contractor is the prevailing party.
H.Costs of Collection: If Client fails to pay any amounts owed to Contractor when due,Client shall be liable for all costs of collection,including
reasonable attorneys'fees,plus 18%interest per annum on the unpaid balance. Contractor also shall have option of removing all or part of the PV
System from Client's premises in addition to receiving payment equal to the value of the unpaid balance to cover all or a portion of Contractor's
consequential damages.
1.Ligm:Contractor,any subcontractor(s)and any other persons or entities supplying labor and materials to Client under this Contract,have the right
under applicable law to impose a lien on Client's real property for the value of the labor or materials provided. Upon Client's payment of all amounts due
under this Contract.Contractor will provide,upon Client's request,a release and waiver of any liens.
J.Force Maieure:Contractor shall not be liable for any delay in matedal and/or equipment delivery or for failure to deliver or failure to perform the Work
which results from any cause beyond the Contractor's control. Such causes include but shall not be limited to:an act of God or of the public enemy;an
act(or failure to act)of any government or utility;a fire,Flood or epidemic;quarantine,restriction,strike,freight embargo,terrorism,theft or unusually
severe weather,Contractor's inability to obtain necessary materials,labor or transportation;custom permitting caused by Client's site conditions;
homeowner association review or approval;building or other code requirements relating to Client's existing electrical system or building characteristics;
and any other impediments to the installation of the PV System arising from Client's acts or omissions and/or the condition of Client's property.
3 Northeast Solar
1 North Ave Suite A
Burlington,MA 01803
~ ReVOluSuft.001T1 781.240.6555
ioa37a wvs.mg ovivm15
REVOLU(SSUN.
K.Legal Compliance and Severability:Contractor and Client acknowledge that the form,substance,content and notices contained in this Contract are
intended to comply with Chapter 142A of the Massachusetts General Laws,and regulations promulgated thereunder. In the event of any instance of non-
compliance,only such portion shall be invalid and the remainder of this Contract shall be in full force and effect. In addition,any such portion not in
compliance shall be read and interpreted so as to have its intended meaning to the maximum extent allowed under such law and applicable regulations.
L.Entire Contract:No Waiver Unless In Writing:This Contract constitutes the entire contract between the parties;there is no representation,warranty,
collateral contract or condition affecting this Contract except as expressed in it. No provisions of this Contract shall be changed or modified,nor shall this
Contract be discharged or waived,in whole or part,except in writing signed by both parties.This Contract shall not be effective until fully executed by
Client and an Authorized Representative of Contractor.
M.Client's Reoresentation of Authority:If this Contract is signed by less than all of the persons or entities who own the subject property,then Client who
signs this Contract(or any of the provisions hereof)represents to Contractor that he,she or it has full legal authority to bind the other persons and/or
entities.
N.Governing Law:The laws of the Commonwealth of Massachusetts shall govern any proceeding or dispute related to this Contract.
O:Production Gap Guarantee:This production guarantee covers 90%of estimated production in year 1 and decreases at.5%each year for a total term of ten
(10)years.This guarantee is determined on an accrual basis and payments are made when the aggregate system production falls below total production
estimated on the schedule above.Payments will be made at the end of each anniversary of the system's in service dale of interconnection.Production Gap
Garranty is void if site conditions and solar access change after the date of interconnection.
Client's Initials: 44.7/I7n.
Client's Initials:
P.3rd party Financing:Should the client obtain financing from a 3rd party which is approved by the Contractor,the payment terms of the lender will apply.
Client: f Contractor: i T—
Name: ���� 1 Ct✓��
Date: Title:
Date:
4 Northeast Solar
1 North Ave Suite A
Burlington,MA 01803
R evol u S u n.com 761.240.6555
roeme wr sam avkveme
REVOLU(SUN.
NOTICE OF CANCELLATION
If you decide that you do not want the goods or services described above,you may cancel this Contract by mailing or delivering a signed and dated copy
of the cancellation notice,or any other similar written notice,to Contractor at the address set forth above no later than midnight of the third business day
following the date on which you signed this Contract.
If you cancel by the date and time indicated,any payment made by you under this Contract will be returned within ten(10)business days following
receipt of your cancellation by Contractor,and any security Interest arising out of the transaction will be released.
If you cancel,you must make available to Contractor,at your residence,in substantially as good condition as when you received,any goods delivered to
you under this Contract;or you may,if you wish,comply with Contractors written instructions regarding the return shipment of the goods at Contractor's
risk and expense. If you fail to make the goods available to Contractor,or if you agree to return the goods to Contractor and fail to do so,then you remain
liable for performance of all obligations under this Contract.
If we do not pick up,or attempt to pick up,the goods within 20 days of the dale of your notice of cancellation,you may retain or dispose of them without
further obligation.
I HEREBY CANCEL THIS TRANSACTION:
DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES.
Client's Signature(sign here only if you wish to Date
cancel this transaction)
utent s Signature sign Hem QM it YOU Wish o Date
cancel this transaction)
dCLIENT',ACKNOWL=EDGESpRECEIPdTf,O.P z
ORIGINAL�OF,,THIS CANCELLATION'•,FORM:
r y
f"Si a reN � , 'y ' ` °Datet
G!
Signature.".` ''Date '
(Client Initials):0771'71Zn
5 Northeast Solar
1 North Ave Suite A
Burlington,IvA 01803
Revol u S u n.com 781.240.0555
108378 w1.301g wily is