Loading...
20 BARSTOW ST - BPA-15-1326 SOLAR �$f 15"o CK 1-1302 aThe Commonwealth of Massachusetts RECE"IVVbF II i Board of Building Regulations and Standards I N S P E C T 10bL4��`dIC S Massachusetts State Building Code,780 CMR Revised Blur 7011 CNJ Building Permit Application To Construct, Repair, Renovate Or Deirioli Ml 0 C _ p 12_ 11) One- or Two-Faindj;Dwelling _ This Section For Official Use Only ( Building Permit Number: Date Applied: ',n Building Official(Print Name) Signature Date SECTION I: SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map& Parcel Numbers L 20 Barstow Street 1 I.I a Is this an accepted street?yes x - no Map Number Parcel Number 1.3 Zoning Information: lA Property Dimensions: Zoning District Proposed Use Lot Area(sq R) Frontage(it) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.O.L c.40.§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Zane: Outside Flood Zone? Public❑ Private❑ Check if ves❑ Municipal ❑ On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Gail Owens Salem,MA 01970 Name(Print) Citi,State.ZIP 20 Barstow Street (Unit#1 &Unit#2)Same House 978-857-7022 No.and Street Telephone Email Address SECTION 3: DESCRIPTION OF PROPOSED WORK(check all that apply) New Construction ❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) ❑ Addition ❑ •� Demolition ❑ Accessory Bldg. ❑ Number of Units Other N(Specirv: Solar Brief Description of Proposed Work`: Install 7.52kw solar panels on roof.Will not exceed roof panel, but will add 6" to roof height.29 panels total. SECTION 4: ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials 1. Building $ 1800 1. Building Permit Fee: $ Indicate how fee is determined: El Standard City/Town Application Fee 3. Electrical $ 23,000 ❑Total Project Cost'(Item 6)x multiplier x 3. Plumbing $ 2. Other Fees: $ 4. Mechanical (HVAC) $ List: 5. Mechanical (Fire $ Su ression) Total All Fees: $ Check No. Check Amount: Cash Amount: 6.Total Project Cost: $ 25,000 0 Paid in Full 0 Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 103631 8/30117 Gregg LaCasse License Number Expiration Dale Name of CSL Holder List CSL"type(see below) U 20 Patterson Brook Rd. Unit 10 No.and Street Type Description U Unrestricted(Builditn s Lip to 35.000 cu. ft.) W. Wareham, MA 02576 R Restricted l&2 Famil D%ecllin City/Town,State.ZIP M Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances (508)291-0007 1 Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 770355 10/12/17 Tom Blumetti/Trinity Solar 111C Registration Number Expiration Date FIIC Company Name or HIC Registrant Name 20 Patterson Brook Rd. Unit 10 No.and Street Email address W.Wareham, MA 02576 (508)291-0007 Citv/Town,State,ZIP Tele hone SECTION 6: WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c 152. g 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ..........1( No...........0 SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT L as Owner of the subject property,hereby authorize Tom Blumetti to act on my behalf, in all matters relative to work authorized by this building permit application. Please see attached letter. 12/1/15 - Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNEW ORAUTHORIZED AGENT DECLARATION By entering my name below, I hereby att s the pains and penalties of perjury that all of the information contained in thispftlication is tr and a urate to th est of my knowledge and understanding. Tom Blumetti 12/1/15 Print Owner's or Authorized Ag It's ame(Elaclronic Signature) Date NOTES: I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program), will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at wwwdnass.aov/oca Information on the Construction Supervisor License can be found at www.mass.uov/dus 2. When substantial work is planned,provide the information below: Total floor area(sq. ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" Optimize Engineering Co., LLC P.O. Box 264•Farmville•VA 23901 Ph: 434.574.6138.E-mail: grichardpe@aol.com Richard B. Gordon, P.E. President November 20,2015 Salem Building Dept. Salem,MA Re: Solar Electric Panels Roof Structural Framing Support To Whom It May Concern: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure, roof loading, and proposed site location of installation: 1. Existing roof framing: Conventional framing 2x6 at 19"o.c.with 11'span (horizontal rafter projection). This existing structure is definitely capable to support all of the loads that are indicated below for this photovoltaic project after sister the rafters with a 2x6 using (2)10d nails V o.c. Use of (2)Guard DogT' FMGDO02 screws is approved, or equal shear strength of approx. 120 Ib, 1' o.c. at areas where little space is available only with remainder of member secured with (2)10d nails V o.c. If do not sister,then install a 2x4 @ 19"o.c. knee wall over an interior bearing wall to limit span of rafters between supports to 8'-11". 2. Roof Loading • 4.33 psf dead load (modules plus all mounting hardware) • 30 psf snow live load (50 psf ground snow live load reference) • 4.5 psf dead load roof materials • Exposure Category B, 115 mph wind uplift live load of 19.6 psf(wind resistance) 3. Address of proposed installation: Residence of Gail Owens, 20 Barstow St. Salem, MA This installation design is in general conformance to the manufacturer's specifications,and is in compliance with all applicable laws, codes, and ordinances,and specifically, International Residential Code/IRC 2009, 2014 NEC,and 2012 ICC Energy Code. The spacing and fastening of the Unirac mounting brackets is to have a maximum of 64" o.c.span along the rail between mounting brackets and secured using 5/16"x 3'/2' length corrosive resistant steel lag bolts. In order to evenly distribute the load across the roof rafters,there shall be a minimum of 2 mounting brackets per rafter&min. 2" penetration of lag bolt per bracket,which is adequate to resist all 115 mph wind live loads including wind shear. The mounting brackets shall alternate between adjacent rafters between rail rows for better distribution of roof load. Penetration of anchors for modules mounted within 18" of ridge and edges of roof is to be a minimum of 3". Rails may be attached to either of two mounting holes in the L-feet. Mounting in the lower hole for a low profile, more aesthetically pleasing installation or mount in the upper hole for a higher profile to maximize airflow under the modules to cool them more. Slide the 3,8-inch mounting bolts into the footing bolt slots.The rails will be attached to the footings with the flange nuts. Very truly yours, Optimize Engineeri g Co�LfLC OF Massachusetts sachuusettss P.E. cense No.49993 jH Ssgc O yG �T RICHARD B. in CIVIL, MECHANICAL, & ELECTRICAL ENGINEERING o CORDON O MECHANICAL N NO.49993 QQ- M1�F3lSTERFC�# �.;SIONA�. i >Yq�V`1