B-19-260 3RD FL ADDITION Commonwealth of Massachusetts
' City of Salem
r 120 Washington St,3rd Floor Salem,MA 01970 978 74,,-9'_95 x5641 = r
g { )
AF" ° Return card to Building Division for Certificate 0r Occupancy
Permit No. B-19-260 R M I T
FEE PAID: $1,870.00
PE TO BJI �� D
DATE ISSUED: 3/18/2019
This certifies that 71 BRIDGE STREET LLC
has permission to erect, alter, or dem)fish a building 67 BRIDGE STREET Map/Lot: 360339-0
as follows: Other Building Permit THIRD FLOOR ADDITION, INTERIOR REFRAMING, THREE CONDOS
Contractor Name: MICHAEL BUONFIGLIO
DBA: NORTH SHORE DEVELOPMENTS
Contractor License No: CS-112689
3/18/2019
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months afte issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documen's for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local z:,n,iig by-laws and codes.
This permit shall be displayed in a location clear!'visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued i ntil all applicable signatures by the Building and Fire Officials are provided on this I ermit.
HIC f#: "Persons contracting with unregistered contractors do not have access:o the guaranty fui'd"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWIIER.
co a- „�1
IL,,,-:: TI: U t r pity of aiem
‘A til
`.l
-,'a•,:; <�' ;' 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate cf Occupancy
• %" Structure CITY OF SALE
M BUILDING PERMIT
PERMIT TO BE POSTED IN THE WINDOW
Excavation - �
ti.�' A
Footing INSPECTION RECORD '�
Foundation
Framing
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber I
Final n lC t! , q )q ifq ,,l,, /9) p/ G5.51 a e. ociv eve d'.ieceCz' 7 6cs 1±C
3
Plumbing/Gas
I AlIi/rr�rh2,- ��s l=�t'��r� 4140C 6e it/4'MP #1,40
Rough:Plumbing��lr�/q , _/z_ j /f� �� i ( /�/� / lie)
Rough:Gas / I / �t, / , t 1 �G" l r n 5 S i^IJ�.I l�� (t7 f li
Final 97/9 / Q /Z �=
Li
Electrical Y ,:..� ( .4-- Reck 6,- C/�0c_--- 1 -N.- / 5 if---A __ Sp ri,..„ k.(cri_ "P4-s__S
!/�/�j.' '
Service
Rough
Final /71
7Fr e a ent Preliminary 3 )")
Cili
Final 1/ / r
He Ith Department
Preliminary
Final