UTS Job 23418 Report 52 Soil Inspection Report 09-16-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-16-2019Soil Inspection Report
Report No.52
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Partly cloudy 60-70°
TIME:7:00 AM
CONTACT:Bob Levesque of Fulcrum Associates
PURPOSE:Observe earthwork construction
EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate
Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum
Roller
TEST METHOD:Sand Cone Nuclear Densometer
TITLE:Inspector Staff Engineer Engineer
OBSERVATIONS:
This report follows a site visit to observe/test the earthwork for: Footing trench excavation.
Footing trench excavation continued for the elevator pit within the SSW limits of proposed
building #1 (see sketch). The trench was excavated to design elevation utilizing the Deere 450
excavator equipped with a flat cutting edge (flared teeth) to minimize sub grade disturbance. Ground
improvements were previously completed in this area by installing GCC deep foundation elements. The
elements were previously excavated to design cutoff elevation. The area was over excavated a minimum 6"
below design BOF elevation to provide a cushion/base of material between the elements and the footing.
All GCC elements were carefully located and exposed during excavation. The sub grade soil in this area
is tannin bark. A layer of mirafi 160 filter fabric was placed atop the sub grade. A 6 - 12" thick
layer of ¾" crushed stone was placed and graded. The surface of the stone was compacted utilizing the
heavy plate compactor exhibiting stable/firm conditions.
Excavation was performed for water main utility connection @ Mason street. The 12" diameter cast
iron main was located and exposed. The connection is scheduled to take place tomorrow. The excavation
was temporarily plated until work continued tomorrow.
Inspector Premium Travel
Name Time Hours Time
M. Chace No Max Day 1 Hr(s)
REVIEWED BY:Chuck Fraser
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-16-2019Soil Inspection Report
Report No.52
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
DSF Flint Salem LLC Dimitri Kourtis
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-16-2019
Report No.52
Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MAAttachment