Loading...
UTS Job 23418 Report 52 Soil Inspection Report 09-16-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-16-2019Soil Inspection Report Report No.52 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 60-70° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer Engineer OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Footing trench excavation continued for the elevator pit within the SSW limits of proposed building #1 (see sketch). The trench was excavated to design elevation utilizing the Deere 450 excavator equipped with a flat cutting edge (flared teeth) to minimize sub grade disturbance. Ground improvements were previously completed in this area by installing GCC deep foundation elements. The elements were previously excavated to design cutoff elevation. The area was over excavated a minimum 6" below design BOF elevation to provide a cushion/base of material between the elements and the footing. All GCC elements were carefully located and exposed during excavation. The sub grade soil in this area is tannin bark. A layer of mirafi 160 filter fabric was placed atop the sub grade. A 6 - 12" thick layer of ¾" crushed stone was placed and graded. The surface of the stone was compacted utilizing the heavy plate compactor exhibiting stable/firm conditions. Excavation was performed for water main utility connection @ Mason street. The 12" diameter cast iron main was located and exposed. The connection is scheduled to take place tomorrow. The excavation was temporarily plated until work continued tomorrow. Inspector Premium Travel Name Time Hours Time M. Chace No Max Day 1 Hr(s) REVIEWED BY:Chuck Fraser Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-16-2019Soil Inspection Report Report No.52 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-16-2019 Report No.52 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment