UTS Job 23418 Report 48 Soil Inspection Report 09-11-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-11-2019Soil Inspection Report
Report No.48
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Partly cloudy 70-80°
TIME:7:00 AM
CONTACT:Bob Levesque of Fulcrum Associates
PURPOSE:Observe earthwork construction
EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate
Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum
Roller
TEST METHOD:Sand Cone Nuclear Densometer
TITLE:Inspector Staff Engineer EngineerX
OBSERVATIONS:
This report follows a site visit to observe/test the earthwork for: Footing trench excavation.
Interior foundation backfilling was performed within the Northern limits of building 2. The
backfill material used is onsite reprocessed 2" minus crushed material. Backfilling focused on the
stairwell, closet and trash room. 12 - 18" thick lifts were placed and graded utilizing the Deere 450
excavator. The areas were filled to finished slab base course elevation (5" below FFE). Each lift was
compacted employing several passes of coverage utilizing the Wacker DPU 6555 plate compactor exhibiting
stable/firm conditions.
Installation of water main utilities was performed within the SW project limits near the Flint
street entrance. The 8" diameter class 52 CLDI piping was installed and bedded in clean imported
bedding sand. All appropriate bends and solid sleeves were installed as necessary. Boulders were used
as thrust blocks. The trench was backfilled using the same processed gravel generated during
excavation. Two 18 - 24" thick lifts were placed and graded. The fill was compacted utilizing the
Wacker ½ ton plate compactor and/or IR 10 ton drum roller exhibiting stable/firm conditions.
Inspector Premium Travel
Name Time Hours Time
M. Chace No 8.00 1 Hr(s)
REVIEWED BY:Chuck Fraser
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-11-2019Soil Inspection Report
Report No.48
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
DSF Flint Salem LLC Dimitri Kourtis
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-11-2019
Report No.48
Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MAAttachment
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-11-2019
Report No.48
Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MAAttachment