Loading...
UTS Job 23418 Report 48 Soil Inspection Report 09-11-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-11-2019Soil Inspection Report Report No.48 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 70-80° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Interior foundation backfilling was performed within the Northern limits of building 2. The backfill material used is onsite reprocessed 2" minus crushed material. Backfilling focused on the stairwell, closet and trash room. 12 - 18" thick lifts were placed and graded utilizing the Deere 450 excavator. The areas were filled to finished slab base course elevation (5" below FFE). Each lift was compacted employing several passes of coverage utilizing the Wacker DPU 6555 plate compactor exhibiting stable/firm conditions. Installation of water main utilities was performed within the SW project limits near the Flint street entrance. The 8" diameter class 52 CLDI piping was installed and bedded in clean imported bedding sand. All appropriate bends and solid sleeves were installed as necessary. Boulders were used as thrust blocks. The trench was backfilled using the same processed gravel generated during excavation. Two 18 - 24" thick lifts were placed and graded. The fill was compacted utilizing the Wacker ½ ton plate compactor and/or IR 10 ton drum roller exhibiting stable/firm conditions. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-11-2019Soil Inspection Report Report No.48 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-11-2019 Report No.48 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-11-2019 Report No.48 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment