UTS Job 23418 Report 51 Soil Inspection Report 09-09-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-09-2019Soil Inspection Report
Report No.51
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Sunny, 68°
TIME:11:30 AM
CONTACT:Bob Levesque of Fulcrum Associates
PURPOSE:To observe earthwork construction and perform field density testing
EQUIPMENT:Excavator and plate compactor
TEST METHOD:Sand Cone Nuclear DensometerX
TITLE:Inspector Staff Engineer Engineer
OBSERVATIONS:
This report follows a site visit to test the earthwork for footing base. The writer observed the
contractor excavate ~6" below bottom of footing, exposing the top of the concrete piers. Filter fabric
was placed and then ~6" of 3/4" stone was compacted by four to six overlapping passes of the plate
compactor. The work area consisted of line 1 at D-J and 6 at I-H at building 1. These observations
results were reported to Mr. Levesque during this visit.
Inspector Premium Travel
Name Time Hours Time
M. Hashem No Min Day 1 Hr(s)
REVIEWED BY:Chuck Fraser
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
DSF Flint Salem LLC Dimitri Kourtis
UTS of Massachusetts, Inc. Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-09-2019
Report No.51
Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MAAttachment