Loading...
UTS Job 23418 Report 51 Soil Inspection Report 09-09-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-09-2019Soil Inspection Report Report No.51 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Sunny, 68° TIME:11:30 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:To observe earthwork construction and perform field density testing EQUIPMENT:Excavator and plate compactor TEST METHOD:Sand Cone Nuclear DensometerX TITLE:Inspector Staff Engineer Engineer OBSERVATIONS: This report follows a site visit to test the earthwork for footing base. The writer observed the contractor excavate ~6" below bottom of footing, exposing the top of the concrete piers. Filter fabric was placed and then ~6" of 3/4" stone was compacted by four to six overlapping passes of the plate compactor. The work area consisted of line 1 at D-J and 6 at I-H at building 1. These observations results were reported to Mr. Levesque during this visit. Inspector Premium Travel Name Time Hours Time M. Hashem No Min Day 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis UTS of Massachusetts, Inc. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 09-09-2019 Report No.51 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment