28 St Peter Street asbestos abatement DEP advisement u'EGTAM
ENVIRONMENTAL SERVP RECEIVED
September 17,2019 SEP 2 3 2019
CITY OF SALEM
Board of Health Agent BOARD OF HEALTH
120 Washington Street,0 FL
Salem, MA 10970
Re: St.John the Ba tist 28 St.Peter Street—Second Floor
Dear Sir/Madam:
Please be advised that Dec-Tam Corporation will be performing an asbestos abatement project at
the above referenced location. This work has been scheduled for October lsr, 2019 through
October 15,2019.
All applicable local, state and federal agencies have been notified of this work.
Please let me know if you have any questions.
Sincerest regards,
?Zrr Ct� ex0x
Craig Starkman
Sales Estimator
CS/yb
Enclosure
50 Concord Street,North Reading,MA 01864 • P:978.470.2860 F:979.470.1017 • wwwdectam.com
• L7Massachusetts Department of Environmental Protection ;100316020
BWP A 04 ANF-001 L.__._
Asbestos Project#
Asbestos Notification Form F Project Revision
Project Cancellation
A. Asbestos Abatement Description
1.Facility Location:
S-T.JOHN THE BAPTIST 28 ST.PETER STREET
Instructions 1.All a.Name of Facility b.Street Address
sections of this form SALEiVI
must be completed in MA 01970 9787441278
order to comply with c.City/Town d.State e.Zip Code L Telephone
MassDEP notification SHAUN SIBLEY PROJECT MANAGER
requirements of 310
CMR 7.15 and g.Facility Contact Person Name h.Facility Contact Person Title
Department of Labor Worksite location: SECOND FLOOR
Standards(DLS)
notification i.Building Name,Wing,Floor,Room,etc.
requirements of 453 2, Is the facility occupied? F a.Yes W b.No
CMR 6.12
3. Is this a fee exempt notification (city, town,district, municipal housing authority, state facility, or
owner-occupied residential property of four units or less)? r- a.Yes ry b.No
MassDEP Use Only
4.Blanket Permit Project Approval,if applicable:
Date Received Approval ID#
5.Non-Traditional Asbestos Abatement Work Practice Approval,
if applicable: Approval ID#
6.Asbestos Contractor:
DEC-TAM CORPORATION 50 CONCORD ST
a.Name b.Address
NORTH READING MA 01864 9784702860
c.City/Town d.State e.Zip Code f.Telephone
AC000035 h.Contract Type: W 1.Written 2.Verbal
g.DLS License#
7. SCOTTAWRIGHT AS032177
a.Name of Contractor's On-Site Supervisor/Foreman b.DLS Certification#
8 lRC ENVIRONMENTAL CORPORATION AA000052
a.Name of Project Monitor b.DLS Certification#
9 TRCENMRONMENTALCORPORATION AA000052
a.Name of Asbestos Analytical Lab b.DLS Certification#
10.
10/1/2019 10/15/2019
a.Project Start Date(MM/DD/YYYY) b.End Date(MM/DD/YYYY)
7AM-5PM NIA
c.Work Hours-Monday Through Friday d.Work Hours-Saturday&Sunday
11.What type of project is this?
r a.Demolition 50- b.Renovation r c.Repair r d.Other-Please Specify:
Revised: 11/13/2013 t qo(o'50
I Page 1 of 4
Massachusetts Department of Environmental Protection 00316020
_ BWP AQ 04 (ANF-001) - -
... Asbestos Project#
Asbestos Notification Form
r"° Project Revision
r Project Cancellation
A.Asbestos Abatement Description: (cant.)
12.Abatement procedures(check all that apply):
W a.Glove Bag r b.Encapsulation r c.Enclosure r d.Disposal Only r- e.Cleanup
W f.Full Containment r g. Other-Please Specify:
13.Job is being conducted: W a.Indoors r b. Outdoors
14 a.Total amount of each type of asbestos Containing materials(ACM)to be removed,enclosed,or
encapsulated:
500 0
1.Linear Feet(Lin.Ft.) 2.Square Feet(Sq.Ft.)
b.Boiler,Breaching,Duct, c.Transite Pipe
Tank Surface Coatings 1.Lin.Ft. 2.Sq.Ft. 1.Lin.Ft. 2.Sq.Ft.
d.Pipe Insulation 500 e.Transite Shingles
1.Lin.Ft. 2.Sq.Ft. 1.Lin.Ft. 2.Sq.Ft.
f. Spray-On Fireproofing g.Transite Panels
1.Lin.Ft. 2.Sq.Ft. 1.Lin.Ft. 2.Sq.Ft.
h.Cloths,Woven Fabrics i.Other-Please Specify:
1.Lin.Ft. 2.Sq.Ft.
j.Insulating Cement
1.Lin.Ft. 2.Sq.Ft. 1.Lin.Ft. 2.Sq.Ft.
15.Describe the decontamination system(s)to be used:
REMOTE
16.Describe the containerization/disposal methods to comply with 310 CMR 7.15 and 453 CMR 6.14(2)
(g):
2X 6-MIL POLY BAGS W/ASBESTOS&WASTE GENERATOR LABELS
17.For Emergency Asbestos Operations,the MassDEP and DLS officials who evaluated the emergency:
a.Name of MassDEP Official b.Title of MassDEP Official
c.Date of Authorization(MM/DD/YYYY) d.Waiver#
e.Name of DLS Official f.Title of DLS Official
g.Date of Authorization(MM/DD/YYYY) h.Waiver#
18.Do prevailing wage rates as per M.G.L.c. 149, §26,27 or 27A—F apply to this r a.Yes W b.No
project?
Revised: 11/13/2013 Page 2 of 4
Massachusetts Department of Environmental Protection 1100316020 � p
BWP AQ 04 (ANF-001)
}.. Asbestos Project#
Asbestos Notification Form
(" Project Revision
r Project Cancellation
B.Facility Description
1.Current or prior use of facility: CHURCH
2.Is the facility owner-occupied residential with 4 units or less? Tv a.Yes W b.No
3 ARCHDIOCESE OF BOSTON 66 BROOKS DRIVE
a.Facility Owner Name b.Address
BRAINTREE MA 02184 8,178019463
c.City/Town d.State e.Zip Code f.Telephone
4.SHAUN SIBLEY 66 BROOKS DRIVE
a.Name of Facility Owner's On-Site Manager b.Address
BRArTTREE MA 02184 6178019463
c.City/Town d.State e.Zip Code f.Telephone
5 DEC-TAM CORPORATION 50 CONCORD STREET
a.Name of General Contractor b.Address
NORTH READING MA 01864 9784702860
c.City/Town d.State e.Zip Code f.Telephone
STATE NATIONAL INSURANCE COMPANY
g.Contractor's Worker's Compensation Insurer
NFA0857332 12/28/2019
h.Policy# i.Expiration Date(MM/DD/YYYY)
6. What is the size of this facility? 30000 3
a.Square Feet b.#of Floors
Note:Temporary storage of Asbestos C. Asbestos Transportation & Disposal
containing waste 1.Transporter of asbestos-containing waste material from site of generation:
material is only
allowed at the place a.Directly to Landfill or r b.To Temporary Storage Location/Transfer Station
of business of a DLS
licensed Asbestos
contractor or a transfer DEC-TAM CORPORATION 50 CONCORD STREET
station that is c.Name of Transporter d.Address
permitted by
MassDEP and NORTH READING MA 01864 9784702860
operated in compliance with Solid e.City/Town f.State g.Zip Code h.Telephone
Waste Regulations
310 CMR 19.000 2.If a temporary storage location/transfer station is used,list name of transporter of asbestos containing
waste material from temporary storage location/transfer station to final disposal site:
RED TECHNOLOGIES 173 PICKERING STREET
a.Name of Transporter b.Address
' PORTLAND CI" 06480 8608944605
c.CitylTown d.State ;T.-Zip Code f.Telephone
Revised: 11/13/2013 Page 3 of 4
Massachusetts Department of Environmental Protection 1�p(-316fl2Q
BWP AQ 04 (ANF-001) Asbestos Project#
Asbestos Notification Form
(" Project Revision
r Project Cancellation
C.Asbestos Transportation&Disposal: (cunt.)
3.Name and address of temporary storage location/transfer station for the asbestos containing waste
material:
DEC-rAM CORPOR PION 50 CONCORD STREET
a.Temporary Storage Location Name b.Address
NOfffH READING MA 01860 9784702860
c.City/Town d.State a.Zip Code f.Telephone
4.Name and location of final disposal site(asbestos landfill):
MINERVA LANDFILL SRUCE SULLNAN
a.Final Disposal Site Name b.Final Disposal Site Owner Name
9000 MINERVA ROAD
c.Address
WAYNESBURG CH 44688 3308663435
d.City/Town e.State f.Zip Code g.Telephone
Note:Contractor must
sign this form for DLS
notification purposes ACertification
CRAIG STARKMAN CRAIG STARKMAN
"I certify that I have personally 1.Name 2.Authorized Signature
examined the foregoing and am SALES 9/16/2019
familiar with the information 3.PosMon>Ttle 4.Date(MM/DD/YYYY)
contained in this document and
all attachments and that,based 9784702860 DEC-TAM CORPORATION
on my inquiry of those 5.Telephone 6.Representing
individuals immediately 50 CONCORD STREET NORTH READING
responsible for obtaining the 7.Address 8.City/Town
information,I believe that the MA 01864
information is true,accurate,and
complete. I am aware that there 9.State 10.Zip Code
are significant penalties for
submitting false information,
including possible fines and
imprisonment.The undersigned
hereby states that I have read the
Commonwealth of
Massachusetts regulations
governing asbestos abatement
(453 CMR 6.00 promulgated by
the Department of Labor
Standards and 310 CMR 7.15
promulgated by the Department
of Environmental Protection),
and that I am aware that this
permit application or notification
shall not be deemed valid
unless payment of the
applicable fee is made."
Revised: 11/13/2013 Page 4 of 4