S/O BP-17-1219 & C/O ROOFTOP BAR, LARK HOTEL/HOTEL SALEM Certificate Number: B-17-1219 Permit Number: B-17-1219
Commonwealth of Massachusetts
City of Salem
This is to Certify that the Gen Office Building located at
Building Type
203 ESSEX STREET in the City of Salem
Address Town/City Name
IS HEREBY GRANTED A TEMPORARY CERTIFICATE OF OCCUPANCY
Roof Top Bar / Area
LARK HOTEL/HOTEL SALEM
This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and
expires Sunday, July 08, 2018 unless sooner suspended or revoked.
Expiration Date
r4c4A44::-'
Issued On: Friday, June 08, 2018
"D` Commonwealth of Massachusetts ,.
3' 1` City of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
'ermit No. B-17-1219
PERMIT TO BUILD
PAID:�EE $0.00
)ATE ISSUED: 12/18/2017
This certifies that HOTEL SALEM REAL ESTATE HOLDINGS, LLC
has permission to erect, alter, or demolish a building 203 ESSEX STREET Map/Lot: 350240-0
as follows: Other Building Permit BUILD RESTAURANT & BAR ON ROOF WITH WORKING KITCHEN @
HOTEL SALEM on 209 Essex St.
(Fees paid on original permit)
Contractor Name: BRIAN BOCHES
DBA: COASTLINE CONSTRUCTION
Contractor License No: CS-045576 a kJ/3z:-
12/18/2017
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
HIC #: 106095 Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
4e,"D'T'yd Commonwealth of Massachusetts .M r 1 ,0-Ndetio
City v of Salem
Y �
c° 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
bi ne
Return card to Building Division for Certificate of Occupancy
Structure CITY OF SALEM BUILDING PERMIT
PERMIT TO BE POSTED IN THE WINDOW
Excavation
Footing INSPECTION RECORD
Foundation
Framing
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber
Final
Plumbing/Gas
Rough:Plumbing
Rough:Gas Final5/9 / 7 datree
Electrical
Service
Rough / /jj�J
Final c5kg P�����yt v>�
ire ment p 414- ‘7��11
•
I
Prelimin
Final fiD
Sa 1 'l Poext-61 i/e4Pei
Health Department JQ;' $
Preliminary71,4,2A45720.1.
Final