Loading...
B-18-1104 BUILD 2 UNIT CONDO Commonwealth of Massachusetts City of Salem 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 Mixa:DD Return card to Building Division for Certificate of Occupancy Permit No. B-18-1104 FEE PAID: PERMIT TO BUILD $2,240.00 DATE ISSUED: 10/18/2018 This certifies that HARTS HILL LLC has permission to erect, alter, or demolish a building 111 HIGHLAND AVENUE Map/Lot: 140199-0 as follows: Other Building Permit BUILD A TWO-UNIT CONDOMINIUM Contractor Name: RYAN HERRICK DBA: Contractor License No: CS-111773 10/18/2018 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. HIC#: 168022 "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. coNDsr;,, Commonwealth of Massachusetts . ., fi t - � City of Salem ,,' .„, °•-'" :r 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 Return card to Building Division for Certificate of Occupancy 4: Structure CITY OF SALEM BUILDING PERMIT ��` PERMIT TO BE POSTED IN THE WINDOW g� il Excavation Footing INSPECTION RECORD Foundation QA Framing a_; 1 1 9 '. ._ Mechanical Insulation INSPECTION: BY DATE Chimney/Smoke Cl}amb Final )( ..1 J j�)1� a/ / / 9/ �_ P��6 Lc r_.‘t/V On]Y, scrd -444 +I41111Plumbing/Gas lj/,A/ AA �`T✓�� ryLtJ�k n/c Ss 4�/I�/eJ .A� /rw bt v�_ / / � 'Rough:Plumbin9/ 1/4 Rough:Gas 3 i/ b Final I/l J/f //f i Electrical iiiiil Service Rough "? , A l'V` ; , Final .,73,0,1 De artment Preliminary /aG, /() Final CD. ac +t Health Department Preliminary Final 1