UTS Job 23418 Report 18 Reinforcing Steel Report 08-23-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 08-23-2019Reinforcing Steel Report
Report No.18
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
CONTACT:Bob Levesque
TIME OF INSPECTION:12:30 PM
TIME OF CONCRETE PLACEMENT:2:20PM
SPECIFICATION:ASTM A615 Grade 40 Grade 60 x Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:S4.1
REVISION NUMBER:DATED:02-10-19
SHOP DRAWING(S):
PROJECT SPECIFICATIONS:03300
OTHER:
xDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Wall; North Side of Building: Column Line 20 at C-D, 20 at D-E
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )x x x x x
Clearance x
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)x
Bar Supports x
Bar Spacing x
Bar Quantity x
Placement and tying x
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Joe Souza No Min Day 1 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 08-23-2019Reinforcing Steel Report
Report No.18
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace