UTS Job 23418 Report 34 Compressive Strength Report - Concrete 08-23-2019 (002)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-23-2019Compressive Strength Report - Concrete Report No.34 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4" *No. Of Sets:1 8CUBIC YARDS: SET 1 LOCATION:Wall: Column Line 20 at C.3 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type I121 4.00 x 8.00 12.57 Good 08/23/19 08/28/19 5 29,000 2,310 2 I122 4.00 x 8.00 12.57 Good 08/23/19 08/29/19 6 31,000 2,470 1 I123 4 x 8 12.57 Good 08/23/19 08/30/19 7 I124 4 x 8 12.57 Good 08/23/19 09/06/19 14 I125 4 x 8 12.57 Good 08/23/19 09/20/19 28 I126 4 x 8 12.57 Good 08/23/19 09/20/19 28 I127 4 x 8 12.57 Good 08/23/19 09/20/19 28 I128 4 x 8 12.57 Good 08/23/19 09/20/19 28 Slump (in.)6 Air Temp. (F.)77 Conc Temp (F)84 Truck No.254 Ticket No.0641 Time 2:30 Unit Wt lbs/cu ft Air Content (%)5.3 GENERAL REMARKS:*MRWR. Cylinders Received 8-28-19 Inspector Premium Travel Name Time Hours Time Joe Souza No REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-23-2019Compressive Strength Report - Concrete Report No.34 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-23-2019Compressive Strength Report - Concrete Report No.34 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. MacLellan FIELD SUMMARY REPORT Total Pour:Walls; North Side of Building: Column Line 20 at C-D, 20 at D.2-E Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)5-7 Number of slumps out of specification reported to If rejected Approved by Remarks:The superintendent, Bob Levesque of Fulcrum, approved a 6" slump because they were having a hard time getting down chutes. Superintendent was also notified of truck going over 90 minutes. UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-23-2019 Report No.34 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment