Loading...
UTS Job 23418 Report 37 Soil Inspection Report 08-29-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-29-2019Soil Inspection Report Report No.37 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Overcast, 65°-70° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum PURPOSE:To observe earthwork construction and perform field density testing EQUIPMENT:Deere 380G excavator, Wacker 6555 plate compactor and CAT 950G loader TEST METHOD:Sand Cone Nuclear DensometerX TITLE:Inspector Staff Engineer Engineer Maximum Field Test Percent Dry Dry Percent Elevation No.Moisture Density Density Compaction Location (Feet) 1 9.0 129.2 123.9 95.9 See sketch Top of footing 2 9.0 129.2 123.3 95.4 See sketch Top of footing 3 9.0 129.2 124.2 96.1 See sketch Top of footing 4 9.0 129.2 123.5 95.6 See sketch Top of footing OBSERVATIONS: This report follows a site visit to observe/test the earthwork for foundation backfill. The writer observed backfilling was underway at the pier footings located at lines C and F at 18-19. Recycled material imported from Caruso in Revere, MA was placed in ~12" thick loose lifts. The lifts were compacted by four to six times by the plate compactor, producing firm, stable lift surfaces. A total of four field density tests were performed using the ASTM D6938 Nuclear Densometer method of testing. The earthwork observed/tested does conform to minimum requirements of 95% compaction. These observations/testing results were reported to Mr. Levesque during this visit. Inspector Premium Travel Name Time Hours Time W. Wright No Min Day 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-29-2019Soil Inspection Report Report No.37 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-29-2019 Report No.37 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment