UTS Job 23418 Report 38 Soil Inspection Report 08-30-2019-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 08-30-2019Soil Inspection Report
Report No.38
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Sunny, 70°
TIME:7:00 AM
CONTACT:Bob Levesque of Fulcrum Associates
PURPOSE:Observe earthwork construction and perform field density tests.
EQUIPMENT:Deere 450C Excavator, Wacker 6555PC, CAT 650 Loader
TEST METHOD:Sand Cone Nuclear DensometerX
TITLE:Inspector Staff Engineer Engineer
Maximum Field
Test Percent Dry Dry Percent Elevation
No.Moisture Density Density Compaction Location (Feet)
1 4.8 129.2 128.7 99.6 See sketch 3' Below TOW
2 5.2 129.2 127.2 98.5 See sketch 2' Below TOW
3 4.6 129.2 127.9 99.0 See sketch 1' Below TOW
4 4.8 150.2 143.6 95.6 See sketch 5" Below TOW
5 4.6 150.2 143.2 95.3 See sketch 20" Below TOW
6 5.1 129.2 127.0 98.3 See sketch 18" Below TOW
OBSERVATIONS:
This report follows a site visit to observe/test the earthwork. The writer observed reprocessed
material, imported from Caruso, Revere was placed in 12" thick lifts around the footings located at
Line 20 at C.1 and 20 at E.1. The lifts were compacted 4-6 times transversely using a plate compactor.
The surfaces were found to be firm and stable. Material imported from Menino, consisting of F-C gravel,
some sand, trace silt was used for fill inside line A from 6-10. A total of 6 field density tests were
performed using the ASTM D6938 Nuclear Densometer method of testing. The earthwork observed/tested does
conform to minimum requirements of 95% compaction. These observations/testing results were reported to
Mr. Levesque during this visit.
Inspector Premium Travel
Name Time Hours Time
W. Wright No Max Day 1 Hr(s)
REVIEWED BY:Chuck Fraser
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 08-30-2019Soil Inspection Report
Report No.38
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 08-30-2019
Report No.38
Job Number 23418
Project Halstead Salem Station, 72 Flint Stree
Salem, MAAttachment