Loading...
UTS Job 23418 Report 38 Soil Inspection Report 08-30-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-30-2019Soil Inspection Report Report No.38 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Sunny, 70° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction and perform field density tests. EQUIPMENT:Deere 450C Excavator, Wacker 6555PC, CAT 650 Loader TEST METHOD:Sand Cone Nuclear DensometerX TITLE:Inspector Staff Engineer Engineer Maximum Field Test Percent Dry Dry Percent Elevation No.Moisture Density Density Compaction Location (Feet) 1 4.8 129.2 128.7 99.6 See sketch 3' Below TOW 2 5.2 129.2 127.2 98.5 See sketch 2' Below TOW 3 4.6 129.2 127.9 99.0 See sketch 1' Below TOW 4 4.8 150.2 143.6 95.6 See sketch 5" Below TOW 5 4.6 150.2 143.2 95.3 See sketch 20" Below TOW 6 5.1 129.2 127.0 98.3 See sketch 18" Below TOW OBSERVATIONS: This report follows a site visit to observe/test the earthwork. The writer observed reprocessed material, imported from Caruso, Revere was placed in 12" thick lifts around the footings located at Line 20 at C.1 and 20 at E.1. The lifts were compacted 4-6 times transversely using a plate compactor. The surfaces were found to be firm and stable. Material imported from Menino, consisting of F-C gravel, some sand, trace silt was used for fill inside line A from 6-10. A total of 6 field density tests were performed using the ASTM D6938 Nuclear Densometer method of testing. The earthwork observed/tested does conform to minimum requirements of 95% compaction. These observations/testing results were reported to Mr. Levesque during this visit. Inspector Premium Travel Name Time Hours Time W. Wright No Max Day 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-30-2019Soil Inspection Report Report No.38 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-30-2019 Report No.38 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment