UTS Job 23418 Report 41 Soil Inspection Report 08-28-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 08-28-2019Soil Inspection Report
Report No.41
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Partly cloudy 70-80°
TIME:7:00 AM
CONTACT:Bob Levesque of Fulcrum Associates
PURPOSE:Observe earthwork construction and perform field density test
EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate
Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum
Roller.
TEST METHOD:Sand Cone Nuclear DensometerX
TITLE:Inspector Staff Engineer Engineer
Maximum Field
Test Percent Dry Dry Percent Elevation
No.Moisture Density Density Compaction Location (Feet)
1 3.1 129.2 124.1 96.0 See drawing 7.0
2 4.2 129.2 123.3 95.4 See drawing 8.3
3 3.1 129.2 125.2 96.9 See drawing 7.5
4 4.2 129.2 123.5 95.6 See drawing 8.5
OBSERVATIONS:
This report follows a site visit to observe/test the earthwork for: Footing trench excavation.
Interior foundation backfilling was performed within the Northern limits of building 2. The
backfill material used is reprocessed material from the Caruso Pit in Revere, MA. 12 - 18" thick lifts
were placed and graded utilizing the Deere 450 excavator. Each lift was compacted employing several
passes of coverage utilizing the Wacker DPU 6555 plate compactor exhibiting stable/firm conditions.
Four compaction tests were performed on the backfill material by Troxler method. All tests exceeded 95%
compaction of the modified proctor.
The AM was spent setting up for onsite crushing operations. Jaw and cone crushers were recently
transported to the site to crush a pile of rock and rubble into a usable structural fill/base course
gravel.
Inspector Premium Travel
Name Time Hours Time
M. Chace No Max Day 1 Hr(s)
REVIEWED BY:Chuck Fraser
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 08-28-2019Soil Inspection Report
Report No.41
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 08-28-2019
Report No.41
Job Number 23418
Project Halstead Salem Station, 72 Flint Stree
Salem, MAAttachment