Loading...
UTS Job 23418 Report 41 Soil Inspection Report 08-28-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-28-2019Soil Inspection Report Report No.41 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 70-80° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction and perform field density test EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller. TEST METHOD:Sand Cone Nuclear DensometerX TITLE:Inspector Staff Engineer Engineer Maximum Field Test Percent Dry Dry Percent Elevation No.Moisture Density Density Compaction Location (Feet) 1 3.1 129.2 124.1 96.0 See drawing 7.0 2 4.2 129.2 123.3 95.4 See drawing 8.3 3 3.1 129.2 125.2 96.9 See drawing 7.5 4 4.2 129.2 123.5 95.6 See drawing 8.5 OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Interior foundation backfilling was performed within the Northern limits of building 2. The backfill material used is reprocessed material from the Caruso Pit in Revere, MA. 12 - 18" thick lifts were placed and graded utilizing the Deere 450 excavator. Each lift was compacted employing several passes of coverage utilizing the Wacker DPU 6555 plate compactor exhibiting stable/firm conditions. Four compaction tests were performed on the backfill material by Troxler method. All tests exceeded 95% compaction of the modified proctor. The AM was spent setting up for onsite crushing operations. Jaw and cone crushers were recently transported to the site to crush a pile of rock and rubble into a usable structural fill/base course gravel. Inspector Premium Travel Name Time Hours Time M. Chace No Max Day 1 Hr(s) REVIEWED BY:Chuck Fraser Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-28-2019Soil Inspection Report Report No.41 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-28-2019 Report No.41 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment