Loading...
22 WILLOW AVENUE - BUILDING INSPECTION 22 WIT,T,OW AVENUE t = s - v$�%i)NDIT,�4 5e JS6CITY OF SALEM MASSACHUSETTS !� `a. -�� BOARD OF APPEAL 901h Aur. �A 8. 4b ` 120 WASHINGTON STREET 1 SALEM,MASSACHUSETTS 01970 HIMSERLEYDRIscoLL T)mE:978-745-9595 ♦ FAX:978-740-my FILE 0 CLERK. SALEM,MASS: MAYOR August 29, 2014 Decision City of Salem Board of Appeals Petition of THOMAS & MARY DEMAKES requesting a Special Permit per Section 3.3.4 of the Salem Zoning Ordinance, to allow a single-story addition and an exterior stairway to an existing nonconforming structure, for the property at 22 WILLOW AVENUE (R1 Zoning District). A public hearing on the above Petition was opened on July 16, 2014 pursuant to M.G.L Ch. 40A, g 11. The hearing was closed on that date with the following Salem Board of Appeals members present: Ms. Curran (Chair), Mr. Duffy, Mr. Watkins, and Mr. Copelas (Alternate). The Petitioner seeks a Special Permit from Section 3.3.4 of the Salem Zoning Ordinance. Statements of fact: 1. In the petition date-stamped June 25, 2014, the Petitioner requested a Special Permit to expand an existing nonconforming structure by adding: a single-story 4-foot 4-inch deep by 16-foot 8-inch long addition to the rear of the existing structure, enclosing an existing first-floor side porch, and adding an exterior stairway to the rear of the first-floor side porch. 2. The applicant submitted revised plans dated 7/16/2014, sheets EX2, Al, and A2, with a proposed 3- foot 6-inch deep addition to the first-floor side porch. 3. The proposed side porch addition would add approximately 58 square feet to the first floor porch, and the addition would not encroach on any of the required setbacks. 4. Mr. Richard Griffin, architect,presented the petition. 5. The requested relief, if granted, would,allow the Petitioner to construct a single-story 4-foot 4-inch deep by 16-foot 8-inch long addition to the rear of the existing structure, to enclose and extend the existing first-floor side porch, and to add an exterior stairway to the rear of the fust-floor side porch. 6. At the public hearing, no members of the public spoke in favor of, or in opposition to, the petition. The. Salem Board of Appeals, after careful consideration of the evidence presented at the public hearing, and after thorough review of the petition, including the application narrative and plans, and the Petitioner's presentation and public testimony, makes the following findings that the proposed project meets the provisions of the City of Salem Zoning Ordinance: Findings: 1. Community needs served by the proposal will be unchanged from the existing condition, the proposed additions are in keeping with the character of the neighborhood, 2. The parking and loading will be unchanged from the existing condition. 3. The impact on utilities and public services will be unchanged from the existing condition. 4. There will be no negative impact on the natural environment, particularly as any added roof runoff will be directed to on-site permeable areas. z City of Salem Board of Appeals August 29,2014 Project:22 Willow Avenue Page 2 of 2 5. The proposal is in keeping with the neighborhood character. 6. The proposal is an improvement to the property, particularly with the enhanced view of the water, so it will have a positive economic and fiscal impact. On the basis of the above statements of facts and findings, the Salem Board of Appeals voted four (4) in favor (Mr. Watkins, Ms. Curran, Mr. Copelas and Mr. Duffy in favor) and none (0) opposed, to grant the requested Special Permit to allow construction of a single-story 4-foot 4-inch deep by 16-foot 8-inch long addition to the rear of the existing structure, to enclose and extend by approximately 58 square feet the existing first-floor side porch, and to add an exterior stairway to the rear of the first-floor side porch., subject to the following terms, conditions, and safeguards: 1. The Petitioner shall comply with all city and state statutes, ordinances, codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. Exterior finishes of new construction shall be in harmony with the existing structure. 6. A Certificate of Occupancy is to be obtained. 7. A Certificate of Inspection is to be obtained. 8. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to, the Planning Board +[n. / Rebecca Curran, Chair Board of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days of filing of this decision in the office of the City Clerk. Pursuant to the Massachusetts General Laws Chapter 40A, Section 11, the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk has been filed with the Essex South Registry of Deeds. o CITY OF SALEM9 MASSACHUSETTS PUBLIC PROPERTY DEPARTMENT X 120 WASHINGTON STREET, 3RD FLOOR z ... SALEM, MA 01970 TEL. (978) 745-9595 EXT. 380 FAX (978) 740-9846 STANLEY J. USOVICZ, JR. PETER STROUT, DIRECTOR OF PUBLIC PROPERTY MAYOR February 22, 2002 Laurie Hoover 22 Willow Ave. Unit 2 Salem,Ma. 01970 Dear Owner: Thank you for meeting with me yesterday to inspect your second and third floor units. The second floor is obviously your personal residence and no violations exist in that unit. The third floor unit is in violation of Salem Zoning Ordinance Section 5411which refers to Special Permit uses in R-C and R-1 Districts as it applies to professional offices. I have enclosed a copy of this ordinance. After you review this ordinance please contact this office to discuss your plans to bring this unit into compliance. Thank you in advance for your anticipated cooperation in this matter. Sincerely, Thomas St. Pierre Local Building Inspector cc: Mayors Office Tom Phillbin, Chief of Staff Councillor Driscoll Enclosed Zoning Ordinance CERTIFICATE DATA EXPIRES ISSUED CERTIFICATE NO. INSPECTOR ORDERS ISSUED COMPLIED ISSUED COMPLIED 19 19 19 19 19 19 19 19 19 19 19 19 REMARKS STREET & NUMBER 22 Willow Avenue DATE V 227 75 OTHER LICENSES OR PERMITS REQUIRED OWNER OF RECORD OF BUILDING Yolande Bickerton ADDRESS CERTIFICATE ISSUED TO ADDRESS NAME OR ADDRESS JAN FEB MARIAPRPAYIJUN JUL JAUGISEP JOCTINOVIDECI USE I YEAR zz wlilow avenue - 75 L1 �:iilow Avenue 1,-2 99 NAME OR ADDRESS I JAN I FESIMAqAPRI MAYI JUNIJULIAU!ISEPI OCTI NOV DE USE YEAR PURPOSE USED Residential PROVIDE THE FOLLOWING INFORMATION AS APPLICABLE # OF STORIES J& B CLASS OF CONSTRUCTION DATE ERECTED CERTIFIED CAPACITY: (BY STORY OR TYPE) NUMBER OF ROOMS - HOSPITALS. SCHOOLS. HOTELS: (BY STORY OR TYPE) - 1st - 6 & B 2nd - 6 & B 3rd - 3 & B NUMBER OF DWELLING UNITS PER STORY 1 . FORM SBCC-2-74 � .•_ _ EMERGENCY LIGHTING SYSTEM MEANS OF DETECTING AND EXTINGUISHING FIRE # OF ELEVATORS HOW HEATED Oil - Steam BOILER OR OTHER HEATING APPARATUS HOW LIGHTED HOW VENTILATED PLACE OF ASSEMBLY: YES NO PURPOSE USED IN WHICH STORY STANDARD BOOTH INSTALLED LOCATION FIXED SEATING # OF AISLES AND WIDTH FIRE RESISTANCE OF CURTAINS OR DRAPERIES # OF SANITARIES I LOCATION each apt. # OF GRADE FLOOR MEANS OF EGRESS DOORWAYS 2 # OF SEPARATE STAIRWAYS ACCESSIBLE PER STORY 2 # OF APPROVED INDEPENDENT EXITWAYS PER STORY 2 CITY OF SALEM, MASSACHUSETTS PUBLIC PROPERTY DEPARTMENT 120 WASHINGTON STREET, 3RD FLOOR SALEM, MA 01970 gBN TEL. (978) 745-9595 EXT. 380 FAX (978) 740-9846 STANLEY J. USOVICZ, JR. PETER STROUT, DIRECTOR OF PUBLIC PROPERTY MAYOR January 30, 2002 Laurette Hoover 22 Willow Avenue Unit 2 & 3 Salem, Ma. 01970 Dear Owner: This office has received complaints about your above-mentioned property. This complaint alleges that you are using two units in the building to run a business. Please contact this office within ten (10) days upon receipt of this letter to discuss this matter and to set up an inspection. Thank you in advance for your anticipated cooperation in this matter. S// �// /i�n�cerely, 7110 Thomas St. Pierre Local Building Inspector Cc: Mayors Office Tom Phillbin Councillor Driscoll INSPECTION REPORT DATE: S--;2,P ^76~ � wp . �g /O; OU �✓Yl ADDRESS: oG I''/"t /✓ f :ri/� °' 7- 25 OWNER: USE GROUP: z —?c KmsQ— / �iS TdC� G NUMBER OF STORIES: c?por-.46 NUMBER OF ROOMS (BY STORY) :/5,11' HOW HEATED: -eli / -5},44 04 GAS: YES NO: NUMBER OF SANITARIES: NUMBER OF APPROVED EGRESS DOORWAYS: REMARKS:- /aU 3 I 4.0 FEE RECEIVED: YES voo, N0: IL Ree 2 a ress of proper y Dear Sir: In accordance with Section 111 .43 of the State Building Code, I, as the owner hereby give notice to the Building Inspector of City the -Town. of Salem that the premises at 22 Willow Avenue , is being &;51d onnot vacant a dress of property date with title passing to James H. MacDowell on or about name o£ buyers Ma 30 197 (date) Entry to the premises may be obtained by contacting -------------------------- Castle' s Realty Co. , or James S. Castle 927-1600 or owners realtor ' ------------------------------ should you determine than an inspec- othe r tion is necessary or desired. Would you kindly acknowledge that you have received this letter by signing and dating the attached copy, and returning it to me in the enclosed envelope. Yours very truly, ame owner" Yolande Bickerton On , 19 , I received th' e ter in compliance with Section 111 .43 of the State Building Code. Building Inspector) a,iiNiftu'mmar.. w.+�5!tr�rw.`�,q .. Re: 22 a ress of proper y Dear Sir: In accordance with Section 111 .43 of the State Building Code, I, as the owner hereby give notice to the Building Inspector of City . the -Tam& of Salem that the premises at e 22 Willow Avenue , is being oniiot vacant a dress= o proper y date with title passing to James H. MacDowell on. or about name of buyers May 30. 1975 (date) m Entry to the premises may be obtained- by contacting -------------------------- Castle's Realty Co. _ or James S. Castle 927-1600 or owners realtor ' ------------------------------ should you determine than an inspec- other tion is necessary'ordesired. Would you kindly acknowledge that you have received this letter by signing and dating the attached copy, and returning it to me in the enclosed envelope. Yours very truly, � --(name of owner Yolande Bickerton 0n , 19 , I received thus Vetter in compliance with Section 111 .43 of the State Building Code. j Building Inspec or m FORM 4 i 'ORDER OF CONDITIONS W E T L A N D S P R O T E C T I O N A C T G.L. C. 131, s. 40 CITY/TOWN Salem FILE NUMBER '64'-80 ... - 1. To: NAME Frederick J. AtkinSADDRESS 22 Willow Avenue CERTIFIED MAIL NUMBER PROJECT LOCATION: Address 23 Glendale Avenue , Salem Recorded at Registry of South Essex Book 6758 Page 188 Certificate (if registered) r > REGARDING: Notice of Intent dated June `26, 1981 and pians titled and dated Steel sheet piling, concrete ret, wall 5-29-81 THIS ORDER IS ISSUED ON (date) July 23, 1981 ----------------------------------------------------------------- Pursuant to the authority of C.L. c. 131, s. 40, the Conservation Commission has reviewed your Notice of Intent and plans identified above, and has determined that the area on which the proposed work is to be done is significant to one or more of the interests listed in G.L. c. 131, s. 40. The Conservation Commission hereby orders that the following conditions are necessary to protect said interests and all work shall be performed in strict accordance with them and with the Notice of Intent and plans identified above except where such plans are modified by said conditions. CONDITIONS 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this order. _l_ FORM 4 ORDER OF CONDITIONS CONTINUED FILE NUMBER 64-80 2. This order does not grant any property rights or any exclu- sive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This order does not relieve the permittee or any other per- son of the necessity of complying with all other applicable federal, state or local statutes; ordinances, by-laws and/ !. J or regulations. 4. The work authorized hereunder shall be completed within one (1) year from the date of this order unless it is for a maintenance dredging project subject to Section 5(9). The order may be extended by the issuing authority for one or more additional one-year periods upon application to the said issuing authority at least thirty (30) days prior to the expiration date of the order or its extension. 5. Any fill used in 'connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, includ- ing, without. limiting the generality of the foregoing, lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the . foregoing. 6. No work may be commenced untill all appeal periods have �. 1: elapsed from the order of the= Conservation Commission or from a final order by the Department of Environmental Quality Engineering. 7. No work shall be undertaken until the final order, with ' respect to the proposed project, has been recorded in the Registry of Deeds for the district in which the land is located within the chain of title of the affected property. The Document number indicating such recording shall be sub- mitted on the form at the end of this order to the issuer of this order prior to commencement of work. 8. A sign shall be displayed at the site not less than two square feet or more than three square feet bearing the words, "Massachusetts 6Z%aOrtment of Environmental Quality Engineering, Number vv 88 9. Where the Department of Environmental Quality Engineering is requested to make a determination and to issue a super- seding order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Depart- ment. C _2_ � 1 ORDER OF CONDITIONS CONTINUED FILE NO.- E4-8O 10. Upon completion of the work described herein, the applicant shall forthwith request, in writing, that a Certificate of Compliance be issued stating that the work has been satis- factorily completed. 11. 'fhe work shall conform to the Following described plans and additional conditions. The Conservation Commission has determined that the projected work is significant to storm damage prevention and issues the . following order of conditions : 1. Except as modified by this ,order of conditions ; all work shall be done in conformance with the following plans: a. Site Detail Plan in Salem,, Mass . for Frederick J. Atkins Trust, 22 Willow Ave. , Salem, MA., T & M Associates. 5-29-81 - - b. Proposed Steal Sheet Piling, concrete retaining wall, timber piles, timber pier and floats, and solid fill in Salem Harbor, Sheet 2 of 2 . c. Proposed Steel Sheet Piling, concrete retai>,,iig' wall, timber piles, timber pier and floats , and;s�o�,id,:fill in Salem Harbor, Sheet 3 of 3 . ! 2. The retaining wall and the sh"t piling bul'? e'a Shall have weep holes at four foot centers near thebas�4*T' 't��i structures . 3. No material or equipment shall remain seaward "of ,lhe bulkhead or the retaining wall following construction. 4. All fill shall be granular as noted in submitted plans , 5. Plans. shall be amended to define the elevation datum; this shall be done prior to the start of construction and a copy shall be sent to the Commission and to the Departinent of nVironmental Quality Engineering, Division of Wetlands, 209 New Boston Street, Woburn, MA. 01801. -3- 1 ORDERS OF CONDITIONS -continued The applicant, any person aggrieved by this order, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to appeal this order to the Department of Environmental Quality Engineering provided the request is made in-writing and by certified mail to the Department . within ten (10) days from the issuance of this order. ISSUED BY G On this 3 I day of 19e before me personally a eeeda, td me k'nowri„'id ba, the person described in, and who executed, the foregoing instand acknowledged that he executed the same as his free act lan� dbec�'', v+v `3 1 •1 ; .1 10 My Commission expires��/�� DETACH ON DOTTED LINE AND SUBMIT TO THE ISSUER OF THIS ORDER PRIOR TO COMMENCEMENT OF WORK. TO _ (Issuing Authority) PLEASE BE ADVISED THAT THE ORDER OF CONDITIONS FOR THE PROJECT AT FILE NUMBER HAS BEEN RECORDED AT THE REGISTRY OF ON (DATE) If recorded land, the instrument number which identifies this trans- action is _ If registered land, the document number which identifies this trans- action is Signed Applicant -4- w�- � �l 0 .� Q 22 vyiccoW AUENve Thursday,March 07, 2002 SA4L V& xM Oi97O Dear Mr. St. Pierre: Thank you very much for inspecting units 2 and 3 at 22 Willow Avenue. Although I was certain that unit 2 had been in compliance with Salem zoning ordinances, I was hopeful that unit 3 had been as well. I am pleased that you have confirmed my first impression; I have already taken steps to bring unit 3 into compliance. Within a few weeks,the business operating in unit 3 will consume less than 25%of the space in this unit,therefore meeting the requirement in Sec. 5-3, (b), (1), c of the zoning ordinance. Upon meeting this requirement, I shall ask you to reexamine the unit,just to verify that it satisfies the requirement. Then, I hope, for my peace of mind,that you will write me a letter confirming compliance. I have been mindful of my neighbors in conducting business. There are no signs, all business mail is delivered to a post office box, and I always consult with clients off-premises. In the rare event(twice a year, perhaps)that out-of- town clients visit me in Salem,I secure a conference room at the Hawthorne Hotel. This has been my habit for years and the folks at the Hawthorne Hotel have been most accommodating. I have attempted to be a good neighbor and law-abiding citizen. Thank you for informing me of the regulations and in helping me come into compliance with Salem law. Yours truly, I