Loading...
ECON BLOC SITE RETAIN WALL 09/07/2018 Economy Block Site Retaining Wall 12 Nurse Way, Salem, MA prepared by: Structures North Consulting Engineers,Inc. Attn: Mr. Edward Moll, P.E. 60 Washington Street, Suite 401 Salem, MA 01971-8560 (978) 745-6817 for: Bartlett Steadman Co., Inc 67 R Village Street Marblehead, MA 01945 Construction Documents Index: Outline Specifications 2 pages Retaining Wall Key Plan SKS-1 Retaining Wall Sections SKS-2, SKS-3 7 September 2018 �`HOF ?y �S9 E ARp �yG HA NI L 8 9FQ/ST P�O��t4r4 �QNAL Edward H. Moll II,P.E. MA Reg. No. 33718 Ecology Block Retaining Wall Structures North Consult.Engrs. 12 Nurse Way,Salem, MA 7 September 2018 Page 1 of 2 ECOLOGY BLOCK RETAINING WALL INSTALLATION GENERAL NOTES 1. CONTRACTOR SHALL EXCAVATE TO THE LINES AND GRADES SHOWN ON THE CONSTRUCTION DRAWINGS. THE CONTRACTOR SHALL BE CAREFUL NOT TO DISTURB THE BASE BEYOND THE LINES INDICATED. OVER-EXCAVATED AREAS,SUCH AS FOR THE REMOVAL OF OBSTRUCTIONS, SHALL BE FILLED WITH SUITABLE BASE OR BACKFILL MATERIAL AND COMPACTED TO 95 PERCENT STANDARD PROCTOR. 2. THIS RETAINING WALL IS A GEOGRID REINFORCED WALL, OR MSE, MECHANICALLY STABILIZED EARTH WALL, UTILIZING LAYERS OF SOIL REINFORCEMENT BETWEEN THE BLOCK AND THE SOIL MASS DIRECTLY BEHIND THE WALL. 3. WALL DESIGN SURCHARGE IS 100 PSF. IN NO CASE SHOULD HEAVY EQUIPMENT BE ALLOWED WITHIN 6'-0" OF THE WALLS. DESIGN IS BASED ON NCMA DESIGN MANUAL FOR SEGMENTAL RETAINING WALLS, CURRENT EDITION. 4. PROVIDE 6" LEVELING PAD DIRECTLY BENEATH THE BASE BLOCK AND EXTENDING 6" BEYOND THE INSIDE AND OUTSIDE FACES. LEVELING PAD IS TO CONSIST OF WELL-GRADED GRANULAR MATERIAL THAT ALLOWS FOR DRAINAGE BUT HAS ENOUGH FINES TO ALLOW FOR PROPER COMPACTION. SOME EXAMPLES OF LEVELING PAD MATERIAL(BY REGIONAL NAME) INCLUDE: ROAD BASE, CLASS 5, 3/-INCH MINUS, AND CRUSH-AND-RUN. BASE MATERIAL SHALL BE COMPACTED SO AS TO PROVIDE A SMOOTH, HARD SURFACE ON WHICH TO PLACE THE FIRST COURSE OF UNITS. 5. THE SOIL MATERIAL BELOW THE LEVELING PAD IS TO BE CHECKED BY QUALIFIED PERSONNEL TO CONFIRM CAPACITY TO SUPPORT THE MASS CONCRETE BLOCK RETAINING WALLS. 6. A VERTICAL COLUMN OF DRAINAGE MATERIAL, SUCH AS%" CRUSHED STONE, IS TO BE PROVIDED IMMEDIATELY BEHIND THE WALL, AND IS TO BE SEPARATED FROM ADJACENT SOIL USING FILTER FABRIC. 7. USE ONLY THE GEOSYNTHETIC REINFORCEMENT(GEOGRID) TYPE SPECIFIED. INSURE THAT THE REINFORCEMENT IS CUT TO THE PROPER LENGTHS AS INDICATED ON THE FINAL ENGINEERED PLAN. GEOGRID IS UNI- AXIAL (STRONGER IN ONE DIRECTION) AND MUST BE LAID WITH THE MANUFACTURER'S EDGE PERPENDICULAR TO THE WALL FACE. 8. THE GEOGRID SHOULD BE LAID ON THE TOP OF THE 2" FROM THE FRONT FACE AS POSSIBLE AND EXTEND BACK OVER A COMPACTED, LEVEL BACKFILL Ecology Block Retaining Wall Structures North Consult, Engrs. 12 Nurse Way, Salem, MA 7 September 2018 Page 2 of 2 TO THE LENGTH REQUIRED. PLACE A GROUT BED ABOVE AND BELOW THE GEOGRID AND SANDWICH THE REINFORCEMENT UNDER THE NEXT COURSE OF BLOCKS TO ANCHOR IN PLACE.THE NEXT COURSE OF UNITS SHALL BE PLACED SUCH THAT THE GEOGRID IS DEFORMED OVER THE TONGUE AND GROOVE KEY.THEN PULL THE TAIL(LOOSE END) OF THE GRID TAUT TO REMOVE SLACK OR WRINKLES. 9. STAKE THE TAIL OF THE GEOGRID PRIOR TO PLACING BACKFILL MATERIAL TO MAINTAIN TENSION. WHEN PLACING BACKFILL OVER A LAYER OF GEOGRID, START JUST BEHIND THE DRAINAGE AGGREGATE AND FILL TOWARD THE TAIL OF THE GEOGRID. AVOID OPERATING BACKFILL EQUIPMENT DIRECTLY ON THE TENSIONED GEOGRID AS MUCH AS POSSIBLE.A MINIMUM OF 6-INCHES OF BACKFILL SHOULD BE PLACED OVER THE GRID BEFORE DRIVING ANY EQUIPMENT ON TOP OF THE GRIDS. AVOID SHARP TURNING AND SUDDEN BRAKING WITH ALL TYPES OF EQUIPMENT TO AVOID DISPLACING, WRINKLING OR DAMAGING THE GEOGRID REINFORCEMENT. 10. REINFORCED SOILS USED IN THE BACKFILL BY GRADATION SHALL HAVE NO MORE THAN 3S PERCENT PASSING THE NUMBER 200 SIEVE. ALL REINFORCED AND RETAINED SOIL BACKFILL MATERIALS SHALL BE COMPACTED TO A MINIMUM 95%STANDARD PROCTOR DENSITY. END OF INSTALLATION GENERAL NOTES 30 � \ Rip° G S42 57 35.00 j / "00 0 i \ t20 30 ' '� - 542•g7' �W / oo< u 000' lb\)f / G°to926ynOa�OpOD,G i;oAo00 a *0 _- a F\oot000 0 to11a, g �5 Gat 23� pR°PO � \ 9 �./gQL d 9 J o LO eF�°°r 5.F• of dry o' p�oP / OSO Ln / pRP1N �F°a e S Q T;2��o' ✓''a����.� �_ • ` i_ � - 05E0 EP� 0 5 R�45OoNR'�O 00' 1 � - g / s Of CIF )0VPRE Qg �50 !� p S,�SN Ate 0 2.57'30 Foa 12-CAI .JO' Y Ail NEW ECOLOGY SL K \--�r,,7� ` (,o I o RETAINING WALL(RE Alf' A AI5 10 � roe.� �aoeso W A.t_t_ B E�dln�Q wC_r 4\ / Q6Ci�uS InIG eat / RESOURCE \ os.f LOT —zk4, Huct��`'faY ARE,4 �AIG At7 / RETAINING WALLS OVER 4 FEET 7 SEPT.2018 Structures North ` 14Aiwffi RETAINING WALL KEY PLAN HEIGHT SHALL 8R DESIGNED 8Y , NURSE WAY MASACHUSETTS REGISTERED SALEM.M , A 60 Washington street Suite 401 PROFESSIONAL ENGINEER AND Salem,MA 01970-3517 1"=1'-0" PERMITTED IN ACCORDANCE WIT S KS-1 T.978.745.6817 F.978.745.6067 TWP aFni IIC]fRfiACK1TC nr _ www.structures-north.com Structures North CONSULTING ENGINEERS, INC. SHEET NO___.�^ � OF f — PO. BOX 8560, SALEM, MA 01911 CALCULATED BY.--- ► DATE PH 978,745.6817 FAX 978.745.6067 iii ttt ��� WSTRUCTURE - RTN. M CHECKED BY DATE SCALE --- ...------_._._-----------._...._ tl2.c� C� 2A ttb•o C� 2,C 4 >✓ � ►mot tf�`��-► bX`1. he 47 1 lo6,c;Q �� �• 1U`6 � t�p.SC� z.L _ crnlP��Ttes.,� -to Rom. V&iLk lr i C� p�R T1 cay MLAtmLlr-A ) D PFOCUC',i? JOB.._—.^_�L��7.L,.e__.._.._` __.____._..--- ----- Structures North �� ®M SHEET No ��,� CONSULTING ENGINEERS, INC. - OF --'-- P. . BOX 8560. SALEM, MA 01971 CALCULATED BY— T_ ` DATE PH 978.745.6817 FAX 978.745.6067 CHECKED BY DATE SCALE 3, v --M-----7d pe Val ito e 7�v' 7 2-z�o ;,I CADC, 5 RA I-eo 1, P 4 tz-t-vt* � -� Q3 c vt2AU Ft� 3 �- 1 Q1�'C:) D PRODUCT207