2017-07-26 DRB MinutesDRB
July 26, 2017
Page 1 of 9
City of Salem Massachusetts
Public Meeting Minutes
Board or Committee: Design Review Board & Salem Redevelopment Authority,
Joint Meeting
Design Review Board, Regular Meeting
Date and Time: Wednesday, July 26, 2017 at 6:00 pm
Meeting Location: 120 Washington Street, Third Floor Conference Room
DRB Members Present: Ernest DeMaio, Glenn Kennedy, Chair Paul Durand, Chris
Dynia, David Jaquith, J. Michael Sullivan
DRB Members Absent: Helen Sides
SRA Members Present: Chair Grace Harrington, Christine Madore, Dean Rubin,
Russell Vickers
SRA Members Absent: David Guarino
Others Present: Tom Daniel – Director of Planning and Community
Development
Recorder: Colleen Brewster
SRA Chairperson Grace Harrington calls the meeting to order. Roll call was taken.
Projects Under Review
1. 32-50 Federal Street (Superior Court and County Commissioners Building):
Discussion and vote on proposed mothballing procedure
Daniel stated that when the mothballing of the Superior Court and County Commissioners
Building was discussed by the SRA in 2014, the SRA requested that the DRB have an
opportunity to review the plans. Given the new SRA board members, tonight’s meeting was
an opportunity for SRA members to review of the mothballing plan as well. Gail Rosenberg,
DCAMM Project Manager, was present to discuss the project and is updating the feasibility
study for the property.
Rosenberg stated that the buildings are unoccupied. A different project manager is
managing the construction and the design is almost complete.
Jim Kelly-Rand, the project architect from Perry Dean Rogers provided an overview of the
project. The exterior study from 2012-2013 completed by Perry Dean determined that the
exterior brick was spalling, sheering, and cracking on both buildings. The exterior
woodwork also showed signs of deterioration due to the weather and lack of maintenance.
Study results called for exterior repointing and replacing the exterior cracked brickwork,
however; the spalling bricks do not warrant replacement at this time. The mothballing will
entail closing up the windows to protect the existing woodwork and keeping the site secure
from break-ins and damage. The downspouts will be replaced and the storm lines will be
cleaned out to the street and closed up.
David Jaquith arrived.
The proposed site enclosure will be a 6 foot high perimeter security fence set 3 feet inboard
of the existing walls and curbs, with fence options of either black PVC coated chain link or a
black aluminum picket fence.
Rosenberg stated that contractors will install a temporary fence and the buildings will be
occupied by security personnel from 7PM-7AM; there will also be personnel that drive by
the property during the day, 7 days a week.
Tom Daniel noted that work will commence in fall of 2017. DCAMM is seeking comments
on the type of fence, boarding up of the windows, and tuck-pointing of brick.
DeMaio asked if the buildings were heated and if they had sprinklers. Rosenberg replied
yes the buildings are heated and but that there are no sprinklers, however; there is a
standpipe in the main stairwell.
Vickers asked about the source of the heating. Rosenberg replied that there is a furnace
and the heating was separated from the Family and Probate Court.
DeMaio asked if the buildings had any exterior lighting to help with security and safety, and
noted that the exterior brick repair mortar should match the existing mortar. Rosenberg
replied that exterior lighting is unknown at this time.
Sullivan asked what the temporary window design would be. Kelly-Rand replied that a
shadow line of the faux window will be painted onto the plywood.
Glenn Kennedy arrived.
Madore asked if the fence was necessary and noted that it will impact the street space and
the fence should be given as much attention as the faux window design. She asked if
another fence in downtown Salem is worth the visual impact. Rosenberg replied that it is a
policy for DCAMM to add perimeter fencing but she will determine if it is necessary.
Sullivan noted that this is an opportunity to improve the condition of the sidewalk and
suggested the fourth fence type that DCAMM is proposing, although stone pylons in the first
propose fence will also fit in Salem. Vickers noted that some structures without perimeter
fencing have had fires in the past. Durand suggested that fence be in line with the front
face of the building and not at the street edge to maintain the street scape.
Madore asked if there are existing security cameras. Rosenberg replied yes, although it is
unknown if they are functional and who monitors them.
Vickers asked why there are exhaust fans in windows. Rosenberg replied that there are
humidistat fans to prevent mold growth.
Durand asked if an existing alarm system was in place. Rosenberg replied yes, it is linked
to the DCAMM Central Office and reiterated that there will be security on site between 7PM
and 7AM. Vickers noted that the Salem Police should be added to emergency alarms due
to their proximity.
Rosenberg replied that she will determine if there is night sight lighting, she will make sure
the repair mortar color to matches, and will determine if a fence is necessary.
Daniel noted that Gail Rosenberg’s responses to all questions will be sent to all Board
members. Regarding the separate feasibility study, he stated that when it is completed it
will be presented to the SRA.
Chair Durand opens public comment.
Polly Wilbert, 7 Cedar Street. Suggested that the fence be tighter to building, the City
should plant more trees on the block, the Salem Police should provide their input on that
street and the security risk the building poses, and foot traffic during the day and night
should lower the risk of any problems.
Steve Immerman, 20 Federal Street. Noted that there are visual concerns to the City with
such a long term redevelopment. Daniel noted that the revised DCAMM report is due back
in September but the redevelopment could last 4 years. There may be clarifications to the
legislation needed as well.
Tim Jenkins, 18 Broad Street. Asked about the current condition of roofs. Kelly-Rand
replied that the County Commissioners building copper roof requires some minor repairs
and there is no sign of leaking. Some EPDM being replaced at top of Superior Court
building to ensure it stays dry and some missing slate pieces will be replaced. Jenkins also
noted the landscaping: weeds and overgrowth will require maintenance. Vickers replied
that a maintenance plan will be submitted to the SRA.
As a State project, it is not subject to SRA approval; however, the comments were
welcomed. As no approval was being sought, no vote was taken.
Chair Grace Harrington: Motion to adjourn the joint meeting. Seconded by: Glenn Kennedy
Regular DRB meeting commenced.
Urban Renewal Area Projects Under Review
1. 10 Derby Square, Unit NB (Derby Square Architects) and 10 Derby Square, Unit S1
(Sperling Interactive): Discussion and vote on proposed installation of blade signs.
Richard Griffin of Derby Square Architects and Michael Sperling of Sperling Interactive
were present to discuss their respective projects.
Griffin stated that two tenants are eligible for signage. The condo building had guidelines to
follow that would require the DRB needs to approve. The original approved sign had a
portrait orientation, however; both tenants now want a landscape orientation. The sign will
consist of a brushed aluminum plate with etched text and an anodized aluminum backer
fastened to wall with expansion bolts. The bottom of sign will be at 8 feet above grade and
top will align with the buildings masonry headers.
Sullivan asked if the sign will be the same size. Griffin replied yes.
Kennedy asked if the awnings would be removed. Sperling replied yes.
Chair Durand opens public comment.
No one in the assembly wished to speak.
Chair Durand closes public comment.
Jaquith: Motion to approve installation of two blade signs.
Seconded by: Kennedy. Passes 6-0.
2. 125 Washington Street (Ledger): Discussion and vote on proposed enclosure for
dumpsters.
Brett Danahy of Ledger was present to discuss the proposed dumpster enclosure.
Danahy stated that the most durable fence would be black chain link with steel post and
black slats. Cedar will provide for 100% screening, however; chain link would work best for
their budget. Photos have been provided that show the two sides of planter remaining to
provide additional support for the new fence. Ledger has switched to 100% kiln dried wood
to eliminate the scent of smoke for its neighbors and all wood will be stored inside.
Kennedy noted that he prefers cedar which would need to be stained and treated yearly.
Danahy noted that the rear entry sidewalk needs to be redesigned to provide proper
handicapped accessibility and to make it easier to move trash bins in and out of the
building, which was mentioned in the cover letter provided.
DeMaio noted that the cedar calls more attention to itself although the fence near Red’s is
barely visible because of its dark stain.
Chair Durand opens public comment.
Daniel read a letter from Kathy Lique who would prefer a cedar fence.
Jodie Salasny of 141 Washington Street, Unit 7. Preferred a cedar fence because they
have a view into from the back alley.
Chair Durand closes public comment.
Jaquith: Motion to approve cedar with dark stain.
Seconded by: Sullivan. Passes 6-0.
3. Mayor Jean A. Levesque Community Life Center: Discussion and vote on construction
documents.
Dan Skolski, managing principal of DMS Design, LLC was present to discuss the project.
Tom McGarrigle representing High Rock and Peter Terrat from DSM Design were also
present.
Skolski stated that they were taking over the design process for this building and are 80%
complete with the Construction Documents. New utility lines are being installed
underground on Bridge Street to maintain construction equipment accessibility on site. The
floor plans and elevations have been submitted and changes from the previously submitted
plans are; one door was moved on the East elevation to change a stair egress, flashing
detail over a covered entry, and three windows lost 6" in height on the West elevation. The
footprint, massing, height, colors, materials all have not changed. The City has requested
small changes to the floor plan in relation to the code review, such as moving partitions.
There has been minimal settling on their side of the site and they hope to start the
foundation work in August.
Sullivan asked for the cornice depth. Skolski replied approximately 3 feet.
Jaquith asked if there will be rooftop equipment. Skolski replied 5 units, 4-5 feet high, will
be placed towards the center of the structure. Some 4 foot high photovoltaics will also be
placed on the roof, the quantity is not yet known. Their locations have been determined but
not finalized and they are installed at a low angle. Sullivan noted that they have an angle of
20 degree maximum Jaquith noted that neighbors will have screening concerns as they
have in the past. Skolski noted that an 8-10" high cornice will help conceal all rooftop
equipment and the 4-5 foot high elevator penthouse.
DeMaio noted that cut sheets for all building and site lighting will need to be submitted.
Sullivan asked if the large box near the street is a transformer. Skolski replied yes, it will be
placed on a pad and screened on street side.
Dynia asked if there is bicycle storage. Skolski replied no.
Chair Durand stated that revised plans showing rooftop units and screening need to be
provided and asked for a proposed timeline. McGarrigle replied that the intended start date
is mid-late August depending on National Grid schedule to place wiring underground. They
will file for a permit within 2 weeks. Foundation permit has been submitted and they are
awaiting approval and the anticipated duration of construction is approximately 9 months.
Chair Durand opens public comment.
Polly Wilbert, 7 Cedar Street. Asked about the parking lot size, asked if bollard will be
placed between the sidewalk and the building along Bridge Street for safety. Skolski
replied that 30% of overall parking lot is meant for the CLC building and the need for
bollards will be determined.
No one else in the assembly wished to speak.
Chair Durand closes public comment.
Kennedy suggested that the arborvitaes should be spaced out because their large size may
overwhelm the space.
Chair Durand suggested the Board approve what they can so the design can move forward
and have a special meeting to review missing items when the design is 100% complete.
McGarrigle reiterated that they will submit for a permit ASAP.
Chair Durand: Motion to approve design as submitted pending review of photovoltaic
equipment, rooftop equipment, and screening, elevator height, and lighting.
Seconded by: Kennedy. Passes 6-0.
4. 65 Washington Street “Salem District Court” (Diamond Sinacori, LLC and Urban
Spaces, LLC): Continued discussion and vote on schematic design review for
proposed development project.
Steve Tise, Architect, and Jeff Hirsch, Project Manager, of Tise Design Associates were
present to discuss the proposed project.
Tise noted that the Board has previous concerns with the base of building that was overly
traditional, too opaque, and out of character with remainder of building. They’ve looked for
a different style and treatment, the storefront facades have been modified, and the planter
design has been revised to lessen the visual access into the storefront. Changes to the
projecting cornice were studied but it has not changed. A traffic study is being conducted.
Hirsch noted that there have been no changes to the program or unit count. The
foundations will still be reused for parking. Ground floor treatment; 2 benches were added
to Federal Street façade, 24" square brick piers have been placed at the entrances and
corner Washington & Church Street corner, all other steel columns have been enclosed
with metal. The storefront entrance facade has been extended further down Washington
Street towards Federal Street and the sidewalk at the retail entrance has been widened
from 5 to 13 feet. The trash area has been placed in corner at Federal and Washington
Streets and the brick courses at that corner are periodically recessed. An 8” stone lintel
has been added at the second floor, the upper floors have not changed except for minor
detailing at the roof terrace. The proposed awning color has changed and the boxed
awnings are now in a slimmer blade style. The glazing at the entrances has been made
more visible.
Tise noted that in addition to the 24" brick columns the intermediate columns are
galvanized and 16" deep. The planters have a 24” wide, 12” deep, and the top is at 42”
above the finished floor, with iron pickets below. The parapet is a signature element that
they kept and the brackets may become structural.
Durand asked if the window treatments will be legislated by condominium. Hirsch replied
that they exterior panels will be uniform/standard and the interiors can be determined by
occupant.
Sullivan suggests that the openings at the garage remain but that the material change.
Tise replied that the recessed panels at the garage will be enclosed but they can be backlit.
The fencing returns at each bench location and the condominium will be responsible for
maintaining the strip of land along Federal Street.
Sullivan asked if the rear façade will receive the same cornice overhang. Tise replied no,
the rear is all bathrooms and kitchens which have minimal windows.
Tise noted that the brass or bronze medallions remain in the facade between window
openings at each floor.
Sullivan asked why the window layout is different on each side of the Washington Street
façade. Tise replied that the corner unit towards Federal Street has a different layout which
adds a third window between the bays as opposed to the 2 windows between the bays
towards Church Street. The exterior corner of the living room at Federal Street will be
glass.
Daniel read 6 comments/emails submitted to the DRB.
Donna Burnam, Pickman Street. The structure is too big and doesn't conform or fit
into Salem.
Steve Caron, Cousins Street. The design is not attractive or in keeping in
architecture of the surrounding buildings. The building should be evocative to the
history of Salem.
Patricia Donohue – The proposed structure doesn't reflect Salem’s historic
architecture, it ruins the streetscape, it will be a disservice to Salem if it moves
forward, it is overpowering and out of place.
Deborah Prentice of 16 Hardy Street. It doesn’t work with the architecture in Salem,
it is out of scale, looks cheap, doesn't fit with built environment and will be around
for years to come. Why did Diamond Sinacori switch the design. This project was
granted on the original rendering which is not what is currently proposed. If they
can't do it someone else can. Please reject proposal because it doesn't work here.
Stan Franzeen of 34 Daniels Street. The design is inconsistent with character of
city, it should be less obtrusive to the surrounding buildings and church. It should
be reduced in height, the flat roof should be replaced with 3 pitched roofs.
Nina Cohen of 22 Chestnut Street. Designing a building that fosters an inviting
pedestrian environment at the street level is key. Planning should underscore this
goal. Schematic design for a building with parking on the ground floor must enhance
the pedestrian environment on Washington St., Federal Street and Church St. One
solution is to require the developer to create space on the first floor for restaurants
or cafes. At a minimum, the proposed development should not be approved absent
a design that includes 1,000 sf or restaurant or retail space on the building’s
Washington St façade. Sidewalk width is another key issue, particularly given the
height of this development. Fifteen to 20 feet of sidewalk setback is required to
ensure the sidewalk is wide enough to accommodate flow traffic into downtown,
seated café patrons and people entering the condo building. This setback is
consistent with other new developments in downtown. DRB should mandate shade
and rain canopies on Washington St that are continuous and uninterrupted, and the
same on Federal and Church St. sidewalks. Every new residential complex must
provide bicycle racks for residents that are protected from the rain. These can be
inside the first-floor garage or under a canopy.
Tise replied that the project has 3,000 SF of retail and there will be bike storage in the
garage.
Kennedy note that replies to those comments should be included into their review.
Jaquith stated that he is bothered by roof overhang which draws one’s eyes up, some of the
letter comments submitted are zoning issues, the building should be designed for a 2017
building, and the base changes are an improvement. Dynia agrees.
Dynia noted that brick at the Federal corner seems too continuous and has no visual
interest; there should be a tie-in of the metal cladding to create visual interest. Sullivan and
Dynia agree that brick will make that corner extremely dark at night if not lighting is added.
Kennedy stated that the revised base coloring is an improvement as are the materials.
More glazing is good as the entrance should be more contemporary to fit upper floors, the
materials should be pushed further, and the material at the Washington & Church Streets
corner make it feel slick and like there is more glazing. It forces your eye up.
Tise noted that the solid corner at Washington and Federal Street anchors the corner and
helps make that transition into commercial.
Jaquith suggested that high windows be added at the trash area to break up the all brick
facade at that corner. Kennedy suggested more of material change.
Kennedy noted that the parking needs to remain and to keep that first level layout at 2 feet
above grade the parking must be raised 2 feet above sidewalk level so the base will be
large. Tise added that 1-1 parking is best for marketing so that need to keep that ratio.
Tise noted that they need to move past the Schematic Design phase so the other details
can be determined.
DeMaio understands purpose for the brick at the corner, wished the motif was carried
around the corner, is in favor of the transparency at the base, but doesn't understand the
columns between retail spaces.
Tise responded explaining the material choices and approach. Tise noted that there will be
a Site Plan Review soon. There will be rooftop screening but 4 different types of units are
currently being reviewed.
Sullivan is in favor with lower floor changes, encourages historic building corner treatment
research, and the three sides overhang is troubling on what will be one of the tallest
buildings in the neighborhood. Tise noted that eliminating the overhang brackets made it
look ordinary and historic buildings have overhangs, the cornice visually increases the
height, and other buildings put cornices on a floor lower or set back the roof area which is
what they have somewhat achieved with so much glass at top level. An easement with the
Church street abutter will be needed and he has offered to work with them. Chair Durand is
in favor of the three sided overhang.
Chair Durand opens public comment.
Jessica Herbert, Salem Historic Commission. The Historic Commission will meet on
August 2nd to review the project and they will submit their comments to the DRB. She is
concerned with the penthouse mechanicals, agrees that the window treatments should be
under condominium jurisdiction, and with the placement of artwork on the corner of
Washington and Federal Streets. Tise noted that those details will be determined and the
corner artwork will be determined.
Tim Jenkins, 18 Broad Street. Commends the extension of and moving the retail façade to
the building edge. The Federal Street corner needs some treatment and the banding helps
but suggests that older details be applied. The overhang at the backside could be
overdone and should be worked out. The streetscape on Federal Street seems too
suburban and fencing limits access which will make it accessible and inviting. Tise replied
that the Washington Street has storefronts and a repetitive look and they are looking to
liven up the Federal Street wall.
Polly Wilbert, 7 Cedar Street. Relationship with building is with the brick and it doesn't fit
and neither does the cornice. It doesn't look like it belongs in Salem when looking down
Washington Street from MBTA station. Respect what has been here to make it feel
welcoming. Consider the pedestrian and vehicle experience.
Bill Uhouse, 28 C Federal Street. Resides in the units in the building across Federal Street.
This design is overwhelming for his building. Courtyards are behind their fence and its
intended to soften and be sensitive to the surrounding buildings. Agrees with many of the
comments submitted and believes those comments should be considered. The cornice
treatment alienates this building from Salem and another treatment should be sought.
Overall design should pay homage to downtown Salem and Washington Street. Is in favor
of the brick mass to anchor the Federal Street corner. Would like to see a revised shadow
study with the current model and how the shadow lines will affect their side of Federal
Street. Projects don't have to be completed according to what zoning says. Jaquith replied
that massing is a zoning ordinance that has not been changed.
Daniel noted that the DRB will make a recommendation to the SRA. After SRA approval it
will also go before the Planning Board for the PUD.
Chair Durand closes public comment.
Durand suggests that they continue to review ground floor.
Kennedy: Motion to approve Schematic Design and continue Design Develoment
material/detail to the next regularly scheduled meeting - to discuss ground floor, cornice,
signage, materials, (mass and footprint will not change)
Seconded by: Jaquith.
Minutes
The minutes from the June 28, 2017 regular meeting were reviewed.
Kennedy: Motion to approve the minutes.
Seconded by: Jaquith. Passes 4-0.
New Business
Daniel distributed the Commercial Design Guidelines given to members. As was discussed at a
prior DRB meeting, the Planning Board has been considering expanding the role of the DRB to site
plan review in the Entrance Corridors. Paul Durand was part of a recent discussion where the
potential thresholds were discussed. The proposal is that new nonresidential construction of
10,000 square feet or more in an Entrance Corridor would require DRB review before the Planning
Board took action. For new nonresidential projects 2,000-9,999 square feet, the Planning Board
would decide if DRB review was needed. Residential development of 6 or more units would also
be referred to the DRB. Mayor Driscoll is supportive of the change. The Commercial Design
Guidelines would be used when reviewing projects in the Entrance Corridors. Staff would like to
have the DRB review the Guidelines and provide comment on any gaps or areas for improvement.
The expanded role of the DRB would need to be made through a change to City ordinances.
Adjournment
Kennedy: Motion to adjourn the meeting.
Seconded by: Jaquith. Passes 6-0.
Meeting is adjourned at 8:45PM.