UTS Job 23418 Report 33 Soil Inspection Report 08-22-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-22-2019Soil Inspection Report Report No.33 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly Cloudy, 80° TIME:11:45 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction. EQUIPMENT:Wacker 6555 Plate Compactor, Deere 450 & 27 Excavator, CAT 950G Loader TEST METHOD:Sand Cone Nuclear DensometerX TITLE:Inspector Staff Engineer Engineer OBSERVATIONS: This report follows a site visit to observe the earthwork for foundation backfill. The writer observed crushed concrete, imported from Carusso, Revere was placed in a 12" thick loose lift, which was compacted with a plate compactor from line L-G.1 at 1-8. Today's fill brought the elevation to 16" below TOW. Water was sprayed from the water truck prior to compaction. The plate compactor made 4-6 passes transversely. No soft spots or unsuitable material was observed. These observation results were reported to Mr. Levesque during this visit. Inspector Premium Travel Name Time Hours Time W. Wright No Min Day 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace UTS of Massachusetts, Inc. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-22-2019 Report No.33 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment