UTS Job 23418 Report 33 Soil Inspection Report 08-22-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 08-22-2019Soil Inspection Report
Report No.33
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Partly Cloudy, 80°
TIME:11:45 AM
CONTACT:Bob Levesque of Fulcrum Associates
PURPOSE:Observe earthwork construction.
EQUIPMENT:Wacker 6555 Plate Compactor, Deere 450 & 27 Excavator, CAT 950G Loader
TEST METHOD:Sand Cone Nuclear DensometerX
TITLE:Inspector Staff Engineer Engineer
OBSERVATIONS:
This report follows a site visit to observe the earthwork for foundation backfill. The writer observed
crushed concrete, imported from Carusso, Revere was placed in a 12" thick loose lift, which was
compacted with a plate compactor from line L-G.1 at 1-8. Today's fill brought the elevation to 16"
below TOW. Water was sprayed from the water truck prior to compaction. The plate compactor made 4-6
passes transversely. No soft spots or unsuitable material was observed. These observation results were
reported to Mr. Levesque during this visit.
Inspector Premium Travel
Name Time Hours Time
W. Wright No Min Day 1 Hr(s)
REVIEWED BY:Chuck Fraser
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Fulcrum Associates Bob Levesque
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
UTS of Massachusetts, Inc. Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 08-22-2019
Report No.33
Job Number 23418
Project Halstead Salem Station, 72 Flint Stree
Salem, MAAttachment