Loading...
UTS Job 23418 Report 34 Soil Inspection Report 08-19-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-19-2019Soil Inspection Report Report No.34 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 70-80° TIME:7:00 AM CONTACT:Bob Levesque of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR pro pac 110 seried 10 ton Drum Roller. TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Footing excavation continued for isolated interior footings within the ESE limits of proposed building #2 (see sketch). The trench was excavated to design elevation utilizing the Deere 450 excavator equipped with a flat cutting edge (flared teeth) to minimize sub grade disturbance. Ground improvements were recently completed in this area by installing GCC deep foundation elements. The area was over excavated a minimum of 6" below design BOF elevation to provide a cushion/base of material between the elements and the footing. All GCC elements were carefully located and exposed during excavation. The sub grade soil in this area is fill and varies in consistency from urban loamy fill with organic silt, ash, gravel, slag, wood Etc. to tannin bark. GCC # 666 was broken at a depth of 44" below design cutoff elevation. The pier was repaired using the concrete sonotube detail. A section of 24" diameter HDPE piping was used in lieu of a paper sonotube to maintain stability during backfilling. The sub grade was generally dry and firm. A 6" thick layer of ¾" crushed stone was placed at each location. The stone was compacted employing several passes of coverage utilizing the heavy plate compactor generally exhibiting stable/firm conditions. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-19-2019Soil Inspection Report Report No.34 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-19-2019 Report No.34 Job Number 23418 Project Halstead Salem Station, 72 Flint Stree Salem, MAAttachment