Loading...
UTS Job 23418 Report 36 Soil Inspection Report 08-21-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-21-2019Soil Inspection Report Report No.36 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER: TIME: CONTACT: PURPOSE: EQUIPMENT: TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer Engineer OBSERVATIONS: The undersigned arrived on site, as requested, to observe the placement of 10 cubic yards of 3000 psi concrete for the pier footings. Please see attached sketch for approximate locations. Prior to the placement of concrete, reinforcing steel was checked using the approved construction drawings approved by the structural engineer of record. The correct number of the properly-sized bars appeared to be present, and they appeared to be positioned as specified within acceptable tolerances. Reinforcing bars appeared to be properly supported and appeared to be tied so that concrete placement should not cause displacement. The required concrete test limits were determined to be a slump of inches, a batch to placement time of 90 minutes or less, and concrete temperature range of 55 to 90 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature and batch to placement time. The following samples were obtained for compressive strength testing in our laboratory: Set A: 1 set of 8 lab cylinders (3000 psi) for pier footings in Building 2. Set A (8) Slump: 4.5" Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-21-2019Soil Inspection Report Report No.36 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Temp: 84° Truck Ticket Mix Strength Yards 239 16160468 30404533 3000 psi 10 86 minutes Observation Summary: A site visit was made to the above referenced project to observe earthwork construction: The undersigned arrived on site, as requested, to observe the compaction of backfill soils for the building slab. Site earthwork was performed by Pitt Pipeline Excavating company. Please see the attached sketch for approximate locations of tests and areas observed. Placement of an offsite recycled concrete backfill soil from Caruso was placed in approximately 8 inch lifts. The Sand Cone test method (ASTM D-1556) was used to check the compaction of the backfill soils. Test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of the maximum dry density as obtained in our laboratory. Areas tested were based on stakeouts or work limits provided by others and were not independently confirmed by UTS. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-21-2019Soil Inspection Report Report No.36 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Inspector Premium Travel Name Time Hours Time Ryan Doucette No Max Day 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Bob Levesque Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 08-21-2019 Report No.36 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment